ID 703255
Snohomish County
Owner Reference: UP3739
04/30/2024
Past bid date
Pre-Bid: 04/18/2024 @ 09:00am
Estimate: $44.7M
Trades: *General Engineering Contractor GEC; Subcontractor Opportunities
Phase 1 work being performed includes, but is not limited to, furnishing all labor, materials and equipment necessary to construct one 8 million gallon prestressed and partially buried concrete tank, shoring system, dewatering, electrical and instrumentation and control systems, and associated piping and other such appurtenances, including trench and tank excavation, haul, stockpiling and disposal, preparation of a project Health and Safety Plan with related submittals, and performing all Work as required by the Contract. There are also two off-site pipe connections to be built. The Contractor must comply with strict time limitations for construction. Bonds required. Prevailing wages.
Purchasing Department
Login or create an account
Owner: City of Everett WA
Published 04/09/2024 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.