Reservoir 3 Replacement Phase 1, Everett, WA

Snohomish County

Owner Reference: UP3739

04/30/2024
Past bid date

Pre-Bid: 04/18/2024 @ 09:00am

Estimate: $44.7M

Trades: *General Engineering Contractor GEC; Subcontractor Opportunities

Phase 1 work being performed includes, but is not limited to, furnishing all labor, materials and equipment necessary to construct one 8 million gallon prestressed and partially buried concrete tank, shoring system, dewatering, electrical and instrumentation and control systems, and associated piping and other such appurtenances, including trench and tank excavation, haul, stockpiling and disposal, preparation of a project Health and Safety Plan with related submittals, and performing all Work as required by the Contract. There are also two off-site pipe connections to be built. The Contractor must comply with strict time limitations for construction. Bonds required. Prevailing wages.

Purchasing Department
 Login or create an account

Owner: City of Everett WA

Published 04/09/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.