171st Ave Water Main Replacement, Phase 2, Snohomish Co, WA

Snohomish County

Bid Date: 05/06/2024 at 11:00am
4 Days until bid date

Estimate: $1,176,000

Trades: *General Engineering Contractor GEC; Subcontractor Opportunities, Pipeline Contractor: Water Mains, Sewers, Drains & Pipe Laying + Related Structures; Includes Pipe Inspection Camera

Installation of approximately 6,150 lineal feet of 8” ductile iron water main and appurtenances to replace existing 6” asbestos cement water main, water main connections, fire hydrants, reconnection of existing water services, trench restoration and limited pavement overlay, and site restoration. Bonds required. Prevailing wages.

Don Kemmis
 Login or create an account
 Login or create an account

Owner: Three Lakes Water Association WA

Published 04/15/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.