Pines GSP, North Phase 10" Water Main Relocation, Spokane Valley, WA

Spokane County

05/02/2024
Past bid date

Trades: *General Engineering Contractor GEC; Subcontractor Opportunities, Pipeline Contractor: Water Mains, Sewers, Drains & Pipe Laying + Related Structures; Includes Pipe Inspection Camera

The installation of 1,350 lineal feet of 10” C-900 pipe together with 7 gate valves, 3 fire hydrants, 2 existing system connections, 20 service connections, 20 meter assemblies & boxes, 13 DCVA assemblies & boxes, reconnections to existing services lines, 1,150 lineal feet of 1” service pipe, 370 tons of crushed surfacing, 90 tons of HMA repair, and 260 s.y. of sod repair. Also included is abandoning existing water mains, removing existing meters & hydrants, traffic control, sprinkler system repairs, hydroseed, and fencing/landscape repairs along with various other incidentals. Bonds required. Prevailing wages.

Tom Haggarty, email only
 Login or create an account
 Login or create an account

Owner: Irvin Water District #6 WA

Published 04/11/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.