Shaw Avenue Street Rehabilitation, Clovis, CA

Fresno County

Owner Reference: CIP 21-19, STP 5208 (187)

Bid Date: 04/30/2024 at 02:00pm
0 Days until bid date

Estimate: $1,306,184

Trades: Class A - *General Engineering Contractor GEC; Subcontractor Opportunities, C12 - Earthwork and Paving Contractor, Land Clearing, Path & Trail Construction: General Engineering Contractor

This project involves 0.5-mile of street rehabilitation on Shaw Avenue from Armstrong to Temperance including grinding and replacing A.C. pavement, full depth removal of A.C. pavement and replacement in areas of severe structural failure, replacement of concrete curb returns and minor median island, adjustments of existing utility boxes, manholes, and utility valve boxes to finish grades, replacement of traffic striping, markings and signage, traffic signal modification, and reinstallation of traffic loop detectors. DBE goal is 18%. Bonds required. Prevailing wages.

Jose Sandoval
 Login or create an account
 Login or create an account

Owner: City of Clovis CA

Published 04/09/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.

DBE/HUB Outreach

This project requires a Good Faith Effort (GFE) outreach. For information regarding Construction Bid Source performing a GFE for you, please call us toll free at 1-888-786-9450