ID 703180
Kern County
Owner Reference: 5977
05/02/2024
Past bid date
Pre-Bid: 04/18/2024 @ 09:00am
Estimate: $500,000
Trades: C10 - High Voltage Electrical Contractor (HVE): Power Lines, Street & Highway Lighting, Venues, Arenas, Utility, Transformers
All labor, materials, and equipment required to provide and install all work necessary and required for the installation of modular buildings. To include but not limited to; power, electrical gear/panels, fire alarm, public address, data, low voltage, etc. as indicated on the drawings / specifications. Exclude all work to truck, crane, place, set modular buildings this scope to be performed by the modular building manufacturer. Bonds required. Prevailing wages.
Lisa Jacobs
Login or create an account
Login or create an account
Owner: Kern High School District CA
Published 04/08/2024 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.