ID 703611
Kern County
Owner Reference: E3K305
Bid Date: 05/09/2024 at 11:00am
4 Days until bid date
Pre-Bid: 04/24/2024 @ 10:00am
Estimate: $6,350,000
Trades: Class A - *General Engineering Contractor GEC; Subcontractor Opportunities
The work to be performed consists, in general, of the removal and replacement of the existing digester gas booster blower system at Wastewater Treatment Plant No. 3 located at 6901 McCutchen Road, Bakersfield, CA 93313. The blower system will include three new skids with independent cooling chiller systems, new power, control panel, and a new pre-engineered shade structure (canopy). In addition, the work includes the removal and replacement of multiple digester gas equipment over four existing digester including the pressure and vacuum relief valves, flame arrestors, sediment traps, manhole covers, and back pressure regulators. Bonds required. Prevailing wages.
Husain Ali
Login or create an account
Login or create an account
Owner: City of Bakersfield CA
Published 04/11/2024 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.