Water Meter Installation Project - Phase II, Shafter, CA

Kern County

Owner Reference: PW2024-02

05/03/2024
Past bid date

Pre-Bid: 04/23/2024 @ 01:00pm

Trades: Class A - *General Engineering Contractor GEC; Subcontractor Opportunities

The City requests proposals from qualified Contractors for installing new water service lines, water meters, meter boxes and lids on approximately 945 water services. Project entails removing and replacing of existing galvanized steel lines with new poly, installing water meter and boxes, and trench patch. In anticipation of material lead times, the City has purchased brass connection fittings that will be available for Contractor to review prior to ordering. City will also provide water meter and cellular endpoint. Bonds required. Prevailing wages.

Marcos Torres
 Login or create an account
 Login or create an account

Owner: City of Shafter CA

Published 04/22/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.

DBE/HUB Outreach

This project requires a Good Faith Effort (GFE) outreach. For information regarding Construction Bid Source performing a GFE for you, please call us toll free at 1-888-786-9450