Alleys North of Foster Road Pavement Rehabilitation, Downey, CA

Los Angeles County

Owner Reference: CIP 23-02

Bid Date: 05/14/2024 at 11:00am
10 Days until bid date

Trades: Class A - *General Engineering Contractor GEC; Subcontractor Opportunities

The work to be performed under this Contract generally consists of pavement rehabilitation on five Alleys North of Foster Rd, between Woodruff Road and Lakewood Boulevard, as shown on the Plan. This project consists of the removal of the existing asphalt pavement and base or subgrade materials, and construction of asphalt concrete (AC) base course and AC overlay. Work also includes the reconstruction of Portland cement concrete (PCC) alley intersections, installation of PCC curb ramp, installation of PCC v-gutters, repair of damaged PCC curb, gutter, and other concrete improvements, adjustments of manhole and utility valve covers to the new grade, traffic control and all appurtenant work. Bonds required. Prevailing wages.

Engineering Department
 Login or create an account
 Login or create an account

Owner: City of Downey CA

Published 04/23/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.