Avenue R and 27th Street Mainline Replacement, Palmdale, CA

Los Angeles County

Owner Reference: 22-604

Bid Date: 06/06/2024 at 05:00pm
18 Days until bid date

Pre-Bid: 05/16/2024 @ 09:00am

Trades: Class A - *General Engineering Contractor GEC; Subcontractor Opportunities

Palmdale Water District (PWD) is seeking bids for the construction of approximately 21 feet of 12-inch ductile iron pipe (DIP), 425 feet of 8-inch ductile iron pipe (DIP) and 160 feet of 6-inch ductile iron pipe (DIP) and all appurtenances as specified on the plans per PWD Standard Specifications and Details. The 12-inch and 8-inch DIP will be replacing the existing water main on 27th Street East south of Avenue R. The 6-inch DIP will be replacing the water mains in Rudall Avenue and 26th Street East south of Avenue R. Bonds required. Prevailing wages.

Kevin Yao
 Login or create an account
 Login or create an account

Owner: Palmdale Water District CA

Published 05/02/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.