ID 701628
Marin County
Owner Reference: CN24-26
04/30/2024
Past bid date
Pre-Bid: 04/09/2024 @ 10:15am
Estimate: $460,000
Trades: Class A - *General Engineering Contractor GEC; Subcontractor Opportunities
This Contract includes furnishing all labor, materials and equipment to hydro-blast clean Primary Clarifier No. 1 (PC #1) interior concrete and steel surfaces; resurface the sludge hopper concrete floor and walls; replace expansion joints and install Hypalon sealing strip; remove and replace four (4) 6-inch glass lined ductile cast iron pipe elbows embedded in the existing concrete, blast and recoat the primary clarifier steel members; rehabilitate defected concrete; install new owner-furnished baffle system; and perform all associated work and appurtenances as shown in the plans and specifications for Primary Clarifier No. 1. Bonds required. Prevailing wages.
Jacky Wong
Login or create an account
Login or create an account
Owner: Central Marin Sanitation Agency (CMSA) CA
Published 03/25/2024 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.