ID 705511
Marin County
Owner Reference: 2019-22, Fed #ER-40A0 (090)
Bid Date: 06/06/2024 at 02:00pm
20 Days until bid date
Estimate: $1,400,000
Trades: Class A - *General Engineering Contractor GEC; Subcontractor Opportunities
Work will generally include constructing two separate cast-in-drilled-hole concrete retaining walls with a pile cap and tiebacks. One wall will be approximately 101 feet in length and the other will be approximately 148 feet in length. Work will also involve a culvert replacement, installation of rock slope protection, and roadway paving. Construction for this project shall only occur between June 15 and October 15 unless granted approval from the County. Nesting bird survey is required if work is to occur between February 15 to August 31. Coordination with the County will be required for nesting bird survey. DBE goal is 16%. Bonds required. Prevailing wages.
Jason Wong
Login or create an account
Login or create an account
Owner: County of Marin CA
Published 04/28/2024 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.
This project requires a Good Faith Effort (GFE) outreach. For information regarding Construction Bid Source performing a GFE for you, please call us toll free at 1-888-786-9450