Eastside Lane Rehabilitation Project Phase 2, Mono, CA

Mono County

Owner Reference: RPL-5947(065)

Bid Date: 05/22/2024 at 03:00pm
3 Days until bid date

Pre-Bid: 05/15/2024 @ 11:00am

Trades: Class A - *General Engineering Contractor GEC; Subcontractor Opportunities, C12 - Earthwork and Paving Contractor, Land Clearing, Path & Trail Construction: General Engineering Contractor

The purpose of this Project is to rehabilitate approximately 5 miles of existing asphalt concrete pavement on Eastside Lane in Walker, CA. Project limits are from the intersection with Highway 395 to Offal Road and from the intersection with Cunningham Lane to Topaz Lane. Two existing culverts crossing under Eastside Lane will be replaced as part of this project. Associated signs, paint striping, and paint markings are included in the project. Bonds required. Prevailing wages.

Public Works
 Login or create an account
 Login or create an account

Owner: County of Mono CA

Published 04/30/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.

DBE/HUB Outreach

This project requires a Good Faith Effort (GFE) outreach. For information regarding Construction Bid Source performing a GFE for you, please call us toll free at 1-888-786-9450