Bell Mountain Middle School Pedestrian Project (ATP), Menifee, CA

Riverside County

Owner Reference: CIP 22-25

Bid Date: 05/07/2024 at 03:00pm
Bids Today

Estimate: $600,000

Trades: Class A - *General Engineering Contractor GEC; Subcontractor Opportunities, C12 - Earthwork and Paving Contractor, Land Clearing, Path & Trail Construction: General Engineering Contractor

The project includes restriping an existing four-lane road to a two-lane (one lane in each direction) roadway, including a class 2 bike lane on both sides of the road within the project limit, and resurfacing the roadway with Type II slurry seal; fifteen ADA ramps along with the installation of truncated domes; six high visibility crosswalks; one location for a mid-block rectangular rapid-flashing beacon (RRFB) (3 units for each location) with a protected raised median at the crosswalk; one dual streetlight at the mid-block pedestrian crosswalk. Bonds required. Prevailing wages.

Amir Zaki
 Login or create an account
 Login or create an account

Owner: City of Menifee CA

Published 04/23/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.