Grossmont College Perimeter Road Phase II, El Cajon, CA

San Diego County

Owner Reference: B24.015

Bid Date: 06/04/2024 at 02:00pm
16 Days until bid date

Pre-Bid: 05/14/2024 @ 02:00pm

Estimate: $677,340

Trades: Class A - *General Engineering Contractor GEC; Subcontractor Opportunities, C12 - Earthwork and Paving Contractor, Land Clearing, Path & Trail Construction: General Engineering Contractor

The scope of the Grossmont College Perimeter Road Repair Phase II will include a pavement condition assessment of the condition of Grossmont College Drive that was prepared in 2020 and determined that a large portion of the road was in poor condition. These remaining areas will require removal and replacement of the asphalt paving along with added speed bumps, signage, and road gate repairs. DVBE goal is 3%. Bonds required. Prevailing wages.

Jami Johnson
 Login or create an account
 Login or create an account

Owner: Grossmont Cuyamaca Community College District (GCCCD) CA

Published 05/02/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.

DBE/HUB Outreach

This project requires a Good Faith Effort (GFE) outreach. For information regarding Construction Bid Source performing a GFE for you, please call us toll free at 1-888-786-9450