Pump Installation for Julian Road Station Facility, Julian, CA

San Diego County

Owner Reference: 933

05/16/2024
Past bid date

Trades: Class A - *General Engineering Contractor GEC; Subcontractor Opportunities

This Contract includes all labor, tools, materials, equipment, and services required for the completion of the Julian Well Cleaning and Pump Replacement project. The Work shall include but is not limited to the following tasks: Contractor shall provide and replace pump and motor unit to include the following: A 25gpm, 5 HP motor unit. A 5hp – 4” sub motor unit. System shall provide 25gpm @ 60psi. Due to the unknown depth of the pump, pricing will vary dependent upon that depth for wire, PVC pipe, and the size pump motor. This will be reflected in the pricing sheet. 200-400 lf of #8/3 Flat Double jacket sub wire. 200-400 lf 1-1/4 Deep Set PVC Pipe (Schedule 120). 1 Splice Kit. Green Tape/10 Mil. 5hp deluxe control box. 1-1/4” Stainless steel check valve. 4” x 10’ Shroud. Pumpsaver 5hp to 15hp pump monitor or County approved equivalent. All necessary miscellaneous pipe fittings. Bonds required. Prevailing wages.

Eric Ayres
 Login or create an account
 Login or create an account

Owner: County of San Diego CA

Published 05/05/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.