ID 705336
San Mateo County
Owner Reference: 11812.61
05/14/2024
Past bid date
Pre-Bid: 04/04/2024 @ 10:00am
Estimate: $50,000,000
Trades: Class B - *General Building Contractor GBC: Building Construction Services, Subcontractor Opportunities
The International Terminal at SFO is comprised of the International Terminal Building (ITB), Boarding Area A (BAA) and Boarding Area G (BAG). The International Terminal HVAC system consists of air handling units (AHUs) which are past their useful life expectancy. Replacing these components will improve smoke control compliance, reduce energy usage, and improve resilience. The base bid includes the replacement of AHU components in ITB Level 2 and 3, BAA, and BAG. The components to be replaced include variable frequency drives, fans, control valves, sensors, dampers, media filters, and actuators. Additionally, photocatalytic oxidation filtration and volatile organic compound sensors will be installed at each AHU to improve indoor air quality and improve the passenger experience. Bid Alternate 1 includes the replacement of AHU components and installation of photocatalytic oxidation filtration and volatile organic compound sensors in ITB Levels 1, 4, and 5. Bonds required. Prevailing wages.
Brian Davidson
Login or create an account
Login or create an account
Owner: San Francisco International Airport (SFO) CA
Published 04/25/2024 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.