Irrigation Central Pumping Station & Main Line, South Campus, Boise State University, Boise, ID

Bonneville County

Owner Reference: 19193

Bid Date: 05/09/2024 at 02:00pm
6 Days until bid date

Pre-Bid: 04/18/2024 @ 01:00pm

Estimate: $683,400

Trades: *General Engineering Contractor GEC; Subcontractor Opportunities, *General Building Contractor GBC: Building Construction Services, Subcontractor Opportunities

A description of the work of this project can be summarized to include removing Student Union Irrigation Pump Station, installing new pumpstation at Rossi Mill cannel, correct gravity irrigation structures at Student Union old pumpstation, reconstruct pressure mainline from Rossi Mill cannel to Student Union, remove existing bubbler and correct gravity irrigation lines at BSU Children’s Center, modify wet well and gravity irrigation structures at Lincoln volleyball courts and integrate existing design for irrigation lines to be placed in Belmont Street. Bonds required.

Barry Miller
 Login or create an account

Owner: State of Idaho Department of Public Works (IDDPW) ID

Published 04/16/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.