Bridge Improvements, Whiteside County, IL

Whiteside County

Owner Reference: 64S27 | NHPPGI3T(377)

04/26/2024
Past bid date

Trades: *General Engineering Contractor GEC; Subcontractor Opportunities, Highway, Roads, Parking Lot, Bridge, Dam, Overpass, Runways: Road Improvement/Pavement/Resurface - NAICS 237310, Cementations Coating Systems, Recoating & Seal Coating or Sealings, Pavement Marking, Striping, & Reflectors - General Engineering Contractor

The work on this project consists of rehabilitating the existing bridges carrying I-88 over Rock Creek, BNSF RR Barstow Sub., Henry Road, and Deer Creek. Work includes joint replacement, bridge deck scarification, bridge deck and approach patching, abutment and pier repairs, slopewall repairs, Latex Concrete overlay, diamond grinding, pavement marking, restoration and all related collateral work necessary to complete the project. DBE goal 3%. Bonds required. Prevailing wages.

IDOT Contracts Office
 Login or create an account
 Login or create an account

Owner: State of Illinois Department of Transportation (ILDOT) IL

Published 04/03/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.

DBE/HUB Outreach

This project requires a Good Faith Effort (GFE) outreach. For information regarding Construction Bid Source performing a GFE for you, please call us toll free at 1-888-786-9450