ID 705426
Guilford County
Owner Reference: 1115-060424
Bid Date: 06/04/2024 at 03:00pm
22 Days until bid date
Pre-Bid: 05/14/2024 @ 11:00am
Trades: *General Engineering Contractor GEC; Subcontractor Opportunities
The work includes the demolition and replacement of the 13 CPVC lines that run along the chemical containment wall and the side of the building at the Ward Water Treatment Plan (see drawing). The new lines will be connected by a CPVC true union ball valve at each location where the existing pipe protrudes through the wall. The new lines will be hung on new uni-strut with pipe clamps. The pipe, uni-strut, pipe clamps, and pipe insulation will be installed per the specifications. In order to limit disruption to the water plant, each line must be demolished and replaced one at a time Bonds required.
Libby Rush
Login or create an account
Login or create an account
Owner: City of High Point NC
Published 04/27/2024 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.