Subcontractors: Raw Wastewater Pump Station Rehabilitation and Replacement -B4 (CMAR) Project, Fairfax, VA

Fairfax County

Owner Reference: WW-000009-018

04/05/2024
Past bid date

Pre-Bid: 02/22/2024 @ 10:00am

Trades: Wastewater Treatment Plant Construction & Repairs WWTP/OSSF OnSite Sewer Facilities Lift Station-General Engineering Contractor, Subcontractors, PLB - Plumbing Contractor: Water Supply, Water Heaters, Water Meters, Leak Detection, Flow & Backflow, Acoustic Testing, High Voltage Electrical Contractor (HVE): Street & Highway Lighting, Venue/Arena Lights, Luminaires, Utility, Transformer Work, HVA - HVAC Contractor: Heating Ventilating Air Conditioning & Controls, Air Handler/Air Chillers. Includes RTU's, Machinery and Pumps Contractor, Portland Cement Concrete

Clark Construction Group, LLC is the Construction Manager for the Raw Wastewater Pump Station Rehabilitation and Replacement-B4 project and is soliciting proposals from subcontractors. Construction of new B4 pump station consisting of deep excavation, dewatering, support of excavation, cast-in-place concrete, precast concrete, masonry, new pumps, piping, valves, flow meters, bridge crane, slide gates, odor control systems, HVAC systems, plumbing, electrical, architectural, and instrumentation and controls components. In addition, significant site and yard piping improvements, electrical feeder line relocation, traffic lane widening, signalization modifications, new guardhouse, rehabilitation to existing buildings, miscellaneous demolition throughout the site, mass demolition to existing pump station are part of the scope. Bonds required.

Tony Dawood
 Login or create an account
 Login or create an account

Owner: County of Fairfax VA

Published 02/21/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.