ID 701040
Kitsap County
04/16/2024
Past bid date
Trades: *General Engineering Contractor GEC; Subcontractor Opportunities, Tank Construction, Repair & Pressure Washing: Fiberglass, Steel or Concrete Tanks - General Engineering Contractor
For all necessary labor, equipment, materials, and appurtenances required for demolition of the existing northeast concrete tank and construction of three concrete tanks on one shared foundation. Each tank shall have an inside diameter of 30’, and a height of 34’ to the overflow outlet. The total height of each tank (including railings on roof) must be less than 40’. This project will also include installation of approximately 259’ of 8” DI pipe, tank drainage appurtenances for the new tanks, security fencing, and other work as detailed in the plans and specifications. Bonds required. Prevailing wages.
Bryan Ransom
Login or create an account
Login or create an account
Owner: Kitsap Public Utility District (KPUD) WA
Published 03/20/2024 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.
This project requires a Good Faith Effort (GFE) outreach. For information regarding Construction Bid Source performing a GFE for you, please call us toll free at 1-888-786-9450