ID 702051
Kitsap County
Owner Reference: 2024-017
04/19/2024
Past bid date
Pre-Bid: 04/04/2024 @ 10:00am
Estimate: $6,328,600
Trades: *General Engineering Contractor GEC; Subcontractor Opportunities
The principal items or elements of construction include: • Approximately 4,200 linear feet (LF) of 24-inch diameter AWWA PVC C900 SDR25 sanitary sewer main along Norum Rd NE, Tuk Wil La Rd NE, Brauer Rd NE, Shore Dr NE, and Peterson Way NE • Isolation and cleaning of the existing sewer main and temporary sewer bypass pumping • Miscellaneous pipeline improvements including air vacuum valve assemblies and blow-off assemblies • All customers currently connected to the existing alignment will be transferred to the new sanitary sewer force main with small diameter HDPE force mains connecting to the existing Individual Pumping Stations (IPS) • Installation of a new pig launch vault • Connection to the existing Lemolo siphon Bonds required. Prevailing wages.
Nick Martin
Login or create an account
Login or create an account
Owner: County of Kitsap WA
Published 03/28/2024 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.
This project requires a Good Faith Effort (GFE) outreach. For information regarding Construction Bid Source performing a GFE for you, please call us toll free at 1-888-786-9450