SMALL WORKS Headquarters Building Server Room HVAC Upgrade , Tacoma, WA
Remove existing rooftop condenser and wall mounted mini split HVAC system in the headquarters server room along with all associated refrigerant lines. Install new, upgraded system and provide all necessary electrical connections for the new rooftop condenser. Evaluate, pressure test and commission new system. Provide close out package including permit sign offs, equipment submittals, and O&M manuals. 8% MWBE goal.
WCCW - Replace Roofs Bldgs C, H, B, G, U & W - Department of Corrections, Gig Harbor, WA
RFQ SCC Emergency Generator Power Replacement - Department of Social and Health Services, McNeil Island, WA
A prolonged power outage occurred in 2025 that strained the capabilities of the existing emergency generator. The Department of Social and Health Services (DSHS) has elected to install two generators to minimize power interruptions and generate redundancy.
W Meeker Public Parking Lot Project, Puyallup, WA
This project includes site development work to construct a new public parking lot with 14 spaces at 313 and 321 W Meeker Ave including, but not limited to: 1. Installation of all required temporary erosion and sedimentation control (TESC) measures; 2. Clearing and grubbing of existing vegetation and excavation of existing site materials to established pavement subgrade; 3. Demolition of site fencing and other existing improvements; 4. Installation of new utility service connections and a new stormwater utility extension; 5. Installation of parking lot lighting with new commercial electrical service; 6. Construction of permeable pavement system with applicable curbing and ADA accessibility features and new driveway approaches; 7. Installation of new landscaping and complete irrigation system; 8. Installation of new site perimeter fencing; 9. Complete final restoration as indicated on the plans; 10. Providing all associated work as shown on the Plans and within these specifications, for a complete and finalized workable system.
Raw Water Pump Replacement, Carbonado, WA
This project consists of the replacement of Carbonados raw water pumps at the water treatment plant. Base Bid consists of the replacement of two raw water pumps, housed in an insulated aluminum building above a raw water reservoir (East Pumphouse). Existing pumps will be removed and salvaged to the Town of Carbonado. New, 1.5-hp pumps will be installed on existing pump mounts and connected to existing piping and electrical. Minor pipe modifications are anticipated to accommodate new pumps. Additive Schedule consists of the replacement of two raw water pumps housed in an insulated aluminum building above a raw water reservoir (West Pumphouse). Existing pumps will be removed and salvaged to the Town of Carbonado. New, 1.5-hp pumps will be installed on existing pump mounts and connected to existing piping and electrical. Minor pipe modifications are anticipated to accommodate new pumps.
SWM Pavement Improvements, Tacoma, WA
This Contract shall generally consist of the removal and replacement of approximately 90,000 SF of asphalt and concrete pavement at the Tacoma Recovery and Transfer Center. Replacement of the attached pavement striping is also included.
Northwest Landing Pump Station, DuPont, WA
The purpose of this solicitation is to secure services to perform a range of construction activities at the Northwest Landing Wastewater Pump Station. The work includes constructing a below grade reinforced concrete foundation with spill containment walls, installation of a polyethylene storage tank, ferric chloride compatible pump system, steel roof structure, emergency shower/eyewash stations, chain-link fence, gates, stairs, and various electrical conduit, water and chemical piping, cables, wiring, and other appurtenances necessary for a functional system. The chemical pump system includes control and alarm panels with Owner furnished equipment for connection to the existing SCADA system. The work also includes extending power cables and conduits from the existing motor control center in the pump station to contractor provided electrical panels. The work also includes tapping the existing water service line and extension to the emergency showers. The pump station must remain operational throughout the work.
SOURCES SOUGHT (CE1004) Repair Roof Building 3087 Lewis-McChord, Fort Lewis, WA
236220 - Commercial and Institutional Building Construction Contractor shall supply all supervision, labor, equipment, and materials to perform all work in strict accordance with the contract specifications, this Statement of Work, and identified drawings to provide a repair by replacement of the existing roof with a new metal roof panel system for Building 3087 at JBLM. The goal of the project is to install a roof system that has a long-life cycle and provides a watertight system to mitigate the roof leak issues currently experienced at the building. This is a complete repair by replacement project that will provide a system that has minimal joints, matches with the bases architectural aesthetics, and provides a complete roof system that requires minimal maintenance.
torm Sewer Improvements - Tacoma Community College, Tacoma, WA
The Project consists of: 1. Selective lining of underground concrete sanitary sewer piping 2. Selective lining of underground concrete storm sewer piping 3. Installation of manhole at selective storm sewer location 4. Installation of bi-directional cleanouts (bullhorns) 5. Cutting out tree roots and jetting of underground sanitary sewer piping. 6. Removal of debris from underground utility piping and legally disposing debris off-site 7. Site Restoration 8. CCTV upon completion of utility work in each piping system 9. Accurate recording of piping locations on campus site plan. Voluntary numerical Diverse Business goals of 10% MBE, 6% WBE, 5% SBE or PWSBE, and 5% Veterans have been established for this project. Achievement of the goals is encouraged.
Green River Filtration Facility Ozone System Replacement, Ravensdale, WA
The completed Work will provide Owner with replacement of select ozone generation system equipment at the Tacoma Water Green River Filtration Facility. The Project includes procurement and installation of new electrical valve actuators, instrumentation, MCC buckets, and centrifugal pumps for cooling and ozone injection. It also includes installation of ozone destruct skid equipment, Ozone Power Supply Units (PSU), and replacement of control panel back panels which are Owner furnished products. The Work also includes integration and programming of the new master ozone control panel (MOCP) by the Ozone system supplier (OSS) and integration of the MOCP into the plant SCADA system by the Process and Instrumentation Control System (PICS) Integrator.
RFSQ Parcel 1A Tote USTs Site Closure Investigation 2026, Tacoma, WA
The PORT is soliciting Statements of Qualifications (SOQ) from firms interested in providing Parcel 1A Tote USTs Site Closure Investigation. The PORT anticipates awarding one (1) Professional Service contract. The period of performance of the contract is three (3) years from the execution of the contract, with options for renewal at the sole discretion of the PORT, for a possible total of five (5) years. The purpose of this project is to complete environmental investigation to address outstanding Washington State Department of Ecology (Ecology) requirements related to over 25 former underground storage tanks at Parcel 1A. The investigation will support regulatory decision-making, advance the site toward potential closure, and reduce long term environmental and financial risk to the Port.
WA NP MORA 11(1), Fryingpan Creek Bridge, Pierce Co, WA
237310 - Highway, Street, and Bridge Construction. The project work is located 32 miles North of Packwood, WA in Pierce County. Approximate Global Positioning System (GPS) coordinates for the beginning of the project are 4653'24.0"N, 12136'39.3"W.
RFQ A & E Downtown Skate Park, Tacoma, WA
Park Tacoma is soliciting letters of interest and statement of qualifications for A&E services to assist with development of the new Downtown Skate Park to include the design of a premier urban skate plaza, including skatepark feature designs, site civil engineering, urban planning, landscape architecture, structural engineering, public art integration, green stormwater infrastructure, lighting, ADA compliance, and community engagement.
MIS Infrastructure Repairs and Upgrades, Dept of Corrections, Steilacoom, WA
McPip Yard Upgrades, Tacoma, WA
This Contract shall generally consist of rail and tie replacement, replacing one switch, removing and replacing one crossover, and replacing one driveway crossing. Other work will include upgrading hardware to Pandrols in specific areas.
Husky Areas A5 and A6 Paving 2026, Tacoma, WA
MAAF Pavement Maintenance 2026, Tacoma, WA
The Work required for this Project includes: Sawcutting, milling, paving and joint sealing.
Annex West HVAC Improvements, Tacoma, WA
Provide HVAC system upgrades to the existing Emergency Operations Center (EOC) data center at the Pierce County Department of Emergency Management Facility.The Project will include the removal and replacement of the two roof mounted HVAC units, new condensing units, new duct heaters, new ductwork, and the installation of a Hot Aisle Containment (HAC) system within the existing data center room.
Cedar Glen Community Distribution, Reservoir, and Iron/Manganese Treatment Project, Lakebay, WA
Constructing a new 23,500 gallon concrete water storage reservoir with approximately 1,800 linear feet of waterline along 163rd Ave NW and 15th St NW in Lakebay, WA of Pierce County by clearing and grubbing, erosion control, earthwork, storm drainage, C900 PVC water mains, fittings, and appurtenances, reinforced cast in place concrete reservoir with appurtenances, pump house, iron and manganese treatment system, power service, and site electrical, crushed rock surfacing, road restored to original condition, soil preparations and plantings, traffic control, and other work, all in accordance with the Contract Documents.