It includes repairing the existing damaged bridge joints and existing damaged concrete curbs to match the original design. Scope includes the replacement, repair, and cleaning of spalled concrete at the bearing joints and curb along the walkway. Foundations and support of the walkway spans are intended to remain in place during this work. Voluntary numerical Diverse Business goals of 12% MBE, 8% WBE, 5% SBE or PWSBE, and 5% Veterans have been established for this project. Achievement of the goals is encouraged.
Post Date: 05/15/2026Bid Date:06/04/2026Trades: *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
Demolition of existing roofing, underlayment and existing flashings. Installation of self adhering ice and water shield, synthetic underlayment and Malarkey Legacy asphalt shingles, 24-gauge pre-finished eave, rake, valley, step flashing and roof to wall flashings, new lead pipe boots at all plumbing vents, new ridge vent. Alternate Bid No. 1: Rochester Primary School, 7440 James Rd. SW, Rochester WA 98579: Demolition of existing roofing, underlayment and existing flashings. Installation of self adhering ice and water shield, synthetic underlayment and Malarkey Legacy asphalt shingles, 24-gauge pre-finished eave, rake, valley, step flashing and roof to wall flashings, new lead pipe boots at all plumbing vents, new ridge vent.
The project consists of the replacement of approximately 12,000 linear feet of mainline including all valves, hydrants, service laterals, and meter boxes.
Post Date: 05/16/2026Bid Date:06/15/2026Trades: Pipeline Contractor: Water Mains, Sewer Lines, Septic Lines; CIPP Pipe liners, Pipe Inspection, Video & Robotic Cameras
The project consists of a new water treatment plant to remove PFAS from the drinking water with minor expansion to the existing building.
Post Date: 05/23/2026Bid Date:06/15/2026Trades: *General Building Contractor GBC: Building Construction, Enclosed Structures; Opportunities for Subcontractors
This contract provides for the installation of approximately 3,300 LF of 12-inch and 16-inch diameter water main across Spruce Street SE, 9th Way SE, Pacific Avenue SE (State Route 510), and Milbanke Drive SE. Work to include installation of water mains, service lines, meters, transfer of water services, valves, fittings, hydrant assemblies, utility appurtenances, connections to existing water mains, water main abandonment, tree removal, pavement, lawn, and sidewalk restoration, traffic control, and other work.
Post Date: 05/15/2026Bid Date:06/17/2026Trades: Pipeline Contractor: Water Mains, Sewer Lines, Septic Lines; CIPP Pipe liners, Pipe Inspection, Video & Robotic Cameras
Rochester School District extends an invitation to qualified General Contractors to submit statements of qualification for the position of General Contractor/Construction Manager of the construction project. The Rochester School District Water System Replacement Project will replace the existing water system that serves Rochester High School, Grand Mound Elementary School, Rochester Primary School and the Districts Maintenance Facility. The existing water system is 40 years old, consisting of a 78,000-gallon square in ground water reservoir and 4 above ground concrete calcite tanks. The scope of the new water system is the construction of an approximately 360,000-gallon water tank for fire protection and 30,000-gallon tank for domestic water, a pump house with water treatment apparatus, controls, and a backup generator, new separate water lines to each building, and replacement of valves at the water supply and fire loops serving the buildings.
Post Date: 06/02/2026Bid Date:06/17/2026Trades: *Construction Management; General Contractor CM/CMGC/CMaC: Owner's Representative Services NIGP 925-44
Requires: grading, asphalt paving, concrete paving, roundabout construction, stormwater facilities, structures over Yelm Creek and the Yelm Prairie Line Trail, retaining walls, noise wall, utility relocations, signing, rapid-rectangular flashing beacon signals, illumination, closed-circuit television cameras, intelligent transportation systems (ITS) conduit and fiber, roadside restoration, traffic control and other work. Involves 295 items and 705 working days. Work class 1, clearing, grubbing, grading and drainage. Tier 3 project. A state funded contract with a 5% condition of award public works small business enterprise goal and a 3% condition of award veteran owned business goal.
Post Date: 05/12/2026Bid Date:06/24/2026Trades: *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
The scope of this project generally involves the renovation of 3 buildings, Olympic - 7,186 SF, Pacific - 7,186 SF and Rainier - 7,186 SF for resident facilities (O/P/R). The scope for O/P/R includes selective demolition of interior walls, ceilings, finishes, mechanical, electrical and plumbing. New scope includes new wall, floor and ceiling finishes and modifications to mechanical, electrical, plumbing, telecommunication systems, fire alarm and fire sprinkler. The project scope also includes the renovation of one restroom within the Multi-Services Building Clinic - 106 SF (M). The scope for M includes demolition of interior walls, ceilings, finishes, and selective demo of mechanical, electrical, and plumbing. New scope includes new wall, floor and ceiling finishes and modifications to mechanical, electrical and plumbing. The project scope also includes the replacement of the fire alarm system within the Multi-Services Building - 31,925 SF (M). The project scope also includes the creation of three outdoor patient spaces outside Olympic, Pacific, and Rainier (O/P/R) buildings. Mandatory 15% apprentice labor hours of the total labor hours are a requirement of the construction contract Voluntary numerical Diverse Business goals of 10% MBE, 6% WBE, 5% SBE or PWSBE, and 5% Veterans have been established for this project. Achievement of the goals is encouraged.
Post Date: 05/26/2026Bid Date:06/30/2026Trades: *General Building Contractor GBC: Building Construction, Enclosed Structures; Opportunities for Subcontractors
The project scope includes Roughly 15,200 sf existing two-story warehouse building tenant improvement project with approximately 4,000 sf on added floor area at the second floor within the existing footprint. Tenant improvements include converting existing offices and warehouse space into the new Port of Olympia Headquarters office space and commission meeting room. Scope includes; offices and public reception counter, elevated commission dias, new two-story elevator, new finishes, mechanical, electrical, plumbing, and fire suppression updates. Tenant Improvement Includes minor exterior wall modifications, and minor site work.
Post Date: 06/02/2026Bid Date:06/30/2026Trades: *General Building Contractor GBC: Building Construction, Enclosed Structures; Opportunities for Subcontractors
North Thurston Public Schools is updating its Consultant Services Roster to comply with RCW 39.80. Design professionals and architectural/engineering firms interested in providing architectural, engineering, surveying, landscape architectural, commissioning, or related services to North Thurston Public Schools for potential projects, including but not limited to new construction, modernizations, facility upgrades, or infrastructure maintenance, are requested to submit a letter of interest and a current statement of qualifications. The statement of qualifications should detail your expertise in architectural, civil, mechanical, electrical, structural, surveying, landscape architectural, and all other expertise and services the design professional or architectural/engineering firm can provide.
Post Date: 01/31/2026Bid Date:12/31/2026Trades: *A&E Architecture & Engineering: Design Services, Consulting & Planning: Professional, EOR Services, Feasibility Study
For the general contract for the East Olympia 684 PFAS Remediation Project as described in the scope of work. Contractors may obtain the contract documents by requesting them from the District at [email protected] at no cost.
Post Date: 04/11/2026Bid Date:05/06/2026Trades: Water Conditioning Equipment Contractor: Water Quality, PFAS Detection, Monitoring, Testing & Mitigation
General, Architectural, Structural, Mechanical, Electrical, Fire Protection and other work, located at 12710 Littlerock Road SW, Olympia, WA 98512 as indicated on Drawings.
Post Date: 04/21/2026Bid Date:05/12/2026Trades: *General Building Contractor GBC: Building Construction, Enclosed Structures; Opportunities for Subcontractors
The College proposes to improve the drainage at the Childrens Center. Related work includes excavation and removal of asphalt, concrete, a strip drain, a drain line, and a catch basin. Work also includes installing synthetic turf, a concrete retaining wall, and drainage elements.
Post Date: 04/17/2026Bid Date:05/13/2026Trades: *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
This contract provides for work that increases accessibility at site parking and the interior of the Veterans HUB Building. The interior improvements entail the installation of a wheelchair lift, plumbing upgrades that allow use of no-touch faucets, and automatic door operators to the rest room doors and building entrance doors.
Post Date: 04/15/2026Bid Date:05/14/2026Trades: HVAC Contractor: Heating Ventilating Air Conditioning & Controls, Duct Clean, Exhaust Systems, Air Handler/Air Chillers, RTU's, *General Building Contractor GBC: Building Construction, Enclosed Structures; Opportunities for Subcontractors
The scope of work at the Tumwater Print and Mail Facility will look to incorporate the Olympia Mail Facility at this location. The Facility operates 24/5 and will remain so during all construction operations. The project scope includes the primary mechanical and electrical systems upgrades along with upgrades to provide for the integration of the Olympia Mail at this location. Additional work will involve interior modifications and complete Re-Roofing of the structure. Mandatory 15% apprentice labor hours of the total labor hours are a requirement of the construction contract. Voluntary numerical Diverse Business goals of 12% MBE, 8% WBE, 5% SBE or PWSBE, and 5% Veterans have been established for this project. Achievement of the goals is encouraged.
Post Date: 04/24/2026Bid Date:05/28/2026Trades: Mechanical Contractor: MEP Contractors (Combined Mechanical, Electrical, Plumbing, HVAC, Fire Suppression Trades), *General Building Contractor GBC: Building Construction, Enclosed Structures; Opportunities for Subcontractors