ID 703304
Pima County
Owner Reference: 240134
04/19/2024
Past bid date
Estimate: Between $500,000 and $1,000,000
Trades: Class A - *General Engineering Contractor GEC; Subcontractor Opportunities, Class A - *General Engineering Contractor GEC; Subcontractor Opportunities
The Mary Ann Cleveland (MAC) Way Shared-use Path project will consist of the construction of a new off-street walking and biking path that runs adjacent to Mary Ann Cleveland Way, connecting nearby neighborhoods to Empire High school. The ten-foot-wide path will be constructed on the north side of MAC Way and will extend from Houghton Road to Atterbury Wash Way. Inherently the project will also include the construction of ADA Curb Ramps and the construction of several driveway entrances with raised crosswalks for Empire High School. SBE/DBE Goal: 14.41% Bonds required. Prevailing wages.
Maritza Felix
Login or create an account
Login or create an account
Owner: City of Tucson AZ
Published 04/09/2024 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.
This project requires a Good Faith Effort (GFE) outreach. For information regarding Construction Bid Source performing a GFE for you, please call us toll free at 1-888-786-9450