Browse all Pima County, AZ
RFSQ CMAR: 130 W. Congress St. 10th & 11th Floor Tenant Improvements, Pima County, AZ
Pima County is seeking Statements of Qualifications (SOQ) for a Construction Manager at Risk (CMAR) to providepre-construction and construction services as the CMAR for the 130 W. Congress St. 10th & 11th Floor TenantImprovements project.
Qualified Vendor List, Green Stormwater Infrastructure Landscape Maintenance, Tucson, AZ
Naranja Park Shade Project, Oro Valley, AZ
The Town of Oro Valley is seeking bids from qualified contractors for the Naranja Park Shade Project. Bid date has been extended to May 12. The Town is seeking the following shade elements: 1. Shade for the playground area 2. Shade for the swing area 3. 20 X 20 shade structure for pickleball court area (alternate 1) 4. 20 X 20 shade structure for skate park/pump track (alternate 2)
Marana El Rio Disc Golf Course and Parking Lot, Marana, AZ
Contractor providing all required construction administration, labor, materials, tools, equipment, and supervision necessary for the disc golf improvements described in the project plans. The Marana Disc Golf Course project (PK031) is located at Sections 16, Township 12 South, Range 12 East of the Gila and Salt River Meridian within Pima County, Arizona on property owned by Pima County Flood Control District (District). The El Rio Recreation Parking Lot project (PK032) is located at Section 17 Township 12 South, Range 12 East of the Gila and Salt River Meridian within Pima County on property owned by the Town of Marana. Both projects lie completely within the Town of Maranas jurisdictional limits.
GAOA Gibb Wash Bridge Replacement, Coronado National Forest, Tucson, AZ
Total Small Business Set-Aside, 237310 - Highway, Street, and Bridge Construction. Bridge replacement work consists of the removal of an existing 24 long, single-lane timber bridge and the installation of a 28-1 span, 9-6 rise, and 28 long steel structural plate arch with welded wire headwalls. Additional work includes embankment construction with mechanically stabilized earth (MSE) wall, realignment of 550 feet of approach road, installation of a 24 diameter CMP culvert, installation of guardrails, reconstruction of stream channel, and obliteration of the existing approach road.
NEW BID DATE: Low Income Conventional Roofing, Pima Co, AZ
County is seeking to establish a blanket agreement with a contractor to provide as-needed roofing services for income eligible households located in unincorporated Pima County, and the Towns of Marana, Oro Valley, Sahuarita, and the City of South Tucson. Contracted roofing jobs will be on privately-owned eligible residential housing. Potential services include removal of existing roofing material and replacement; removal of existing fascia and replacement; minor and incidental mechanical, electrical, structural, and plumbing. Contracted jobs can be located anywhere in unincorporated Pima County, and incorporated jurisdictions, except in the City of Tucson. Contractor will be responsible for ensuring that installed materials and equipment warranty paperwork/forms are given to the homeowner, as well as secure documentation to provide to County, ensuring that the homeowner received warranty paperwork/forms. County will provide forms for Contractor to document what warranty or warranties were provided to homeowner. Contractor is not responsible for submitting on homeowners behalf, but only to ensure that they were provided
RFP Damage Restoration Window and Mirror Replacement or Repair , Tucson, AZ
Soliciting proposals from interested vendors to furnish the University with Damage Restoration by weather, water, fire, sewer back up, graffiti, and vandalism including window and mirror replacement or repair.
Prop 411- Tucson Heights & Highland Park Addition Mill & Fill, Tucson, AZ
Prop 411 funded mill and fill project to resurface streets and construct curb access ramps in the Tucson Heights and Highland Park Addition neighborhoods. These neighborhoods are bounded on the west by Oracle Rd, on the east by Euclid Avenue, to the north by Grant Road, and to the south by Speedway Blvd. This project is estimated to have 319 curb access ramps, 32 speed humps, 1 speed table, and approximately 282,403 SY of mill and fill using 2" of PAG Mix #2 (LV) with PG 76-22TR+ binder. 4% SBE
RFQ Shannon Road Widening Project from Lambert Lane to Tangerine Road, Oro Valley, AZ
Final engineering design documents from Lambert Lane to Tangerine Road, addressing issues such as alignment, channelization, right-of-way, environmental, subsurface utilities, traffic signals, round-about, drainage facilities, and cost estimate.