Citywide Road Rehabilitation Project - Phase 6, Monterey, CA

Monterey County

Owner Reference: 35c1553

04/16/2024
Past bid date

Pre-Bid: 04/02/2024 @ 11:00am

Trades: Class A - *General Engineering Contractor GEC; Subcontractor Opportunities

In general, the work consists of, but is not limited to, the demolition, off haul and disposal of asphalt concrete pavement, concrete curb, gutter and sidewalk, storm drain infrastructure necessary to construct concrete ADA curb ramp improvements, concrete sidewalk, curb and gutter, storm drain infrastructure and recompaction/preparation of existing base materials, placement of HMA including pavement interlayer, pavement striping and markings, in addition to all necessary environmental pollution prevention traffic control requirements. Bonds required. Prevailing wages.

Parker Lovett
 Login or create an account
 Login or create an account

Owner: City of Monterey CA

Published 03/20/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.