Browse all Oregon
Coburg and River Road On and Off Ramp Paving, Eugene, OR
Scope of Work: This Project involves inlay repairs to highway on and off ramps, including cold plane pavement removal at various depths, asphalt paving, thermoplastic pavement markings, and traffic signal modifications.
City of Medford Service Center Building A Boiler Replacement, Medford, OR
Scope of Work: The contractor shall furnish and install all required equipment, in addition to also providing all labor, supervision, permits, testing, and startup necessary to provide a complete and operational hydronic heating and domestic hot water system for Building A at the Service Center. The contractors work includes: 1. Disconnect, demolish, and remove existing boiler, pumps, and associated piping, electrical power, and controls as required for the new work. 2. Provide & install new boiler and associated piping systems required for a complete working system. The contractor is responsible to lay out the new equipment and piping. a. All new equipment shall be installed on concrete pads. Provide new pads or enlarge existing pads as required. b. Provide and install two new variable speed primary pumps to operate in a lead/standby manner with weekly lead pipe alteration, provide new ABB (or owner approved equal) variable speed drives. c. Provide and install electrical service to the new boiler and pumps, including CSD-1 emergency shutdown switch at boiler room door. 3. Provide and install control systems as described in the contract documents. 4. Provide and install a new condensing water heater, expansion tank, and mixing valve. Reconnect to the existing domestic hot water system. Provide dielectric unions at all connections to the existing piping. Install new CPVC combustion air and vent piping through the roof.
Strategic Planning Consultancy, Eugene, OR
Description: An inclusive, data-informed strategic planning process culminating in the adoption of its next multi-year Strategic Plan to be implemented in 2027 for Lane Community College. The consultants work will encompass the core tasks, to be refined collaboratively with the Colleges strategic planning team. The consultants role is to bring structure, expertise, and facilitation skill to the process. The consultant will design a structured survey instrument and facilitation guide for student focus groups; survey administration and focus group logistics will be managed by college institutional research (IR) staff. The consultant will analyze results and incorporate findings. Affiliated shared governance bodies of College Council: The consultant will design a structured survey instrument for affiliated shared governance bodies of College Council; survey administration will be managed by LCCs institutional research (IR) staff. The consultant will analyze results and incorporate findings.
Station Chetco River Replacement Flooring, Brookings, OR
Total Small Business Set-Aside, 238330 - Flooring Contractors. The Contractor shall provide all labor, materials, equipment, and supervision necessary to remove the existing locker room flooring and install approximately 775 square feet of new Roppe Rubber Tile (or equal) and Roppe Vinyl Wall Base (or equal) at USCG Station Chetco River.
Big Creek Dams Seismic Remediation Design, Newport, OR
Scope of Services: Professional services for the Big Creek Dams Seismic Remediation Design Project. Services may include engineering analysis, dam safety evaluations, seismic design, permitting, regulatory coordination, environmental review, water supply planning, cost estimating, and preparation of bid-ready documents to advance alternatives identified in the City's Big Creek Dams Alternatives Analysis.
McKay Pump Replacement, Salem, OR
Description: Replacement of inline pumps at McKay High School, part of the HVAC system. The project involves investigating and replacing failing inline pumps that circulate water through heating water coils, ensuring they are controlled by the Building Automation System (BAS). The Scope includes replacing pumps, adjusting piping and valving to prevent pump failures, providing seismic bracing, and updating control systems.
Gilham Elementary School Cooling Upgrades, Eugene, OR
Scope of Work: Project includes installation of a new chilled water pump station, piping, air-cooled chiller, cooling coils, control valves, VRF systems, thermowells, pressure sensor connections, and required electrical upgrades. Work also includes associated piping and wiring, coordination with the controls contractor, startup, testing, adjusting and balancing, and training for District Facilities Operations & Maintenance staff.
McNary HS Stage Rigging Replacement, Keizer, OR
Scope of Work: The project includes the demolition of existing counterweight rigging line sets and the installation of new stage rigging equipment, acoustic reflectors, and drapery.
Elevator and Installation at Toledo High School, Toledo, OR
Description: Elevator and Installation at Lincoln County School District's Toledo High School.
East Ball Avenue Improvements , Stanfield, OR
Description: The Work for this Project includes construction of approximately 3,300 square yards (SY) of 3-inch asphalt concrete pavement (ACP) overlay on East Ball Avenue between South Main Street and Jimmy Avenue and construction of approximately 940 SY of 8-foot-wide ACP multi-use path along the north side of East Ball Avenue between Southeast Glendening Street and Southeast Wayne Street. All valve boxes, manholes, and water meter boxes within the construction limits shall be adjusted to grade as needed. Work shall include the furnishing of all labor, materials, equipment, supplies, and appurtenances necessary to complete the Project as specified in the Technical Specifications and as shown on the Drawings.
Roadway Vegetation Maintenance services (842) for the Whitman Ranger District, Wallowa Whitman National Forest, Baker City, OR
Total Small Business Set-Aside, 237310 - Highway, Street, and Bridge Construction. Roadway vegetation maintenance services (842) for the Whitman Ranger District, Wallowa Whitman National Forest, Baker City, OR.The scope of the scope of the work includes an estimated 55.8 miles with an additional 44.4 optional miles. PoP 1 August 2026 through 27 November 2026.
Neighborhood Park at Jennings Lodge Campus, Milwaukie, OR
Project Scope: The Work consists of constructing the Park at Jennings Lodge Campus related to grading and excavation; the construction of a playground, pathways, utilities, landscaping, irrigation, street improvements, erosion and sediment controls.
State of Oregon Data Center Roof Replacement, Salem, OR
Scope of Work: This Project consists of the demolition and replacement of a combined 45,680 total square foot roof of the State Data Center, a one (1)-story building located at 530 Airport Road SE, Salem, OR 97301. The buildings existing roof is a SBSmodified bituminous roof membrane installed over a high density roof cover board and rigid insulation. Project Work shall be performed in two (2) roof areas identified in Attachment C Plans and Drawings as Roof Area A, totaling 8,360 SF, and Roof Area B, totaling 37,320 SF.
NEHS Swede Field Bleacher Re-Painting Project, Eugene, OR
Hwy 99E MP 11.82-12.20 Pavement Repair, Wilsonville, OR
Project Description: The Work includes: Furnish, place and compact ACP Mixture, cold plane pavement removal at 3-inches, provide and apply tack coat, furnish and install temporary pavement markings, furnish and install permanent striping, and traffic control.
SOURCES SOUGHT John Day Dam Elevator Maintenance Services, Rufus, OR
811310 - Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance, US Army Corps of Engineers, Portland District intends to award a full-service elevator maintenance contract at John Day Dam, Sherman County, Oregon, and Klickitat County, Washington. Eight (8) elevators at John Day Dam require routine preventative maintenance including cleaning, inspection, lubrication, adjustment, calibration, repair, replacement, testing, and documentation. Offerors must be capable of maintaining 24/7/365 availability to respond to emergency situations and be able to arrive on site no later than three hours in some emergency response situations.
2026 Paving Project, Astoria, OR
NE 1st, 2nd, Fogarty, and Grant Streets Paving Project, Newport, OR
RFQ Forest Hills Elementary Replacement School, Lake Oswego, OR
The new Forest Hills Elementary School will replace an existing school on the same site in the heart of Lake Oswego.The site is approximately six (6) acres in the Forest Hills neighborhood. The scope of work includes a new building andassociated site improvements. The new building will total approximately 71,000 SF, with two-story and single-storycomponents. The footprint of the building is expected to be approximately 45,000 SF.