Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

Browse all Maricopa County, AZ

#819673

Traffic Signal Installation - El Mirage Road & Fire Station, El Mirage, AZ

This project includes the installation of one speed cushion as well as associated signage and striping on El Mirage Road between Well Street and End Street. Additional signage installation will also be required in the area.

Post Date: 04/18/2026 Bid Date: 05/20/2026 Trades: Traffic Signals, Calming, Intelligent Transportation (ITS): Automated Enforcement Systems (AES) & Speed Traffic Recorders (TMS)
#822556

RFP Residential Landscape Services, Tempe, AZ

Purpose of this proposal is to establish a term contract with a qualified group of companies to provide landscape services to residences of Tempe. For landscape maintenance services are limited to basic upkeep to include mowing of turf, removal or spraying of weeds, and raking/blowing of landscape debris/leaves from the property.

Post Date: 05/05/2026 Bid Date: 05/21/2026 Trades: R-21 - *Landscaping Contractor & Groundskeeping, Xeriscaping, Hardscaping, Weed Control Grubbing Sodding Lawn Mowing Mulching
#822826

Pavement Management Preservation Bid, Peoria, AZ

The City of Peoria intends to establish a contract with a qualified firm to provide delivery and application of Polymer modified slurry seal type II or type III.

Post Date: 05/06/2026 Bid Date: 05/21/2026 Trades: A-14 - Earthwork & Paving Contractor: Pavement Preservation, Resurface, Slurry Seal, High Friction, Milling, Land Clearing, Trails/Path, R-13 - Earthwork & Paving Contractor: Pavement Preservation, Resurface, Slurry Seal, High Friction, Milling, Land Clearing, Trails/Path
#821814

RFQ CMAR Phoenix Sky Harbor Iinternational Airport Airfield Lighting Vaults Modernization, Phoenix, AZ

The purpose of this project is to replace aging electrical equipment in the north, center, and south airfield lighting vaults to ensure continued safe and reliable airport operations. The existing equipment, including lighting regulators, is over 20 years old and has surpassed its useful lifespan. These units are being phased out by the manufacturer, and replacement parts will soon no longer be available, creating a risk of equipment failure and unusable aircraft movement areas. This initiative is essential to modernize all three airfield lighting vaults, ensuring long-term reliability, safety, and continued compliance with regulatory requirements.

Post Date: 04/30/2026 Bid Date: 05/22/2026 Trades: *At Risk Construction Management CMaR: Owner's Representative Services NIGP 925-44
#820881

Heritage Center ADA Improvements, Gilbert, AZ

Construction to improve the exterior areas of the building to provide better access, lighting, signage and required American with Disabilities Act (ADA) upgrades. Scope of work includes mitigating drainage issues in the courtyard, play area and around the building. Engineers estimate does not include the addition of playground and shade structure replacement which should be included in this bid.

Post Date: 04/25/2026 Bid Date: 05/26/2026 Trades: Class A - *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
#822875

Central Wastewater Reclamation Facility (WRF) Basin A and Effluent Station Rehabilitation, Buckeye, AZ

The City of Buckeye is seeking Bids from qualified contractors for the Central Wastewater Reclamation Facility (WRF) Basin A and Effluent Station Rehabilitation project. The City of Buckeye Water Resources Department is conducting rehabilitation of its 1.5-million-gallon (MG) wastewater treatment Basin A located at its Central Beloat Wastewater Reclamations Facility (WRF) located at 915 South 7th Street Buckeye, Arizona 85326.

Post Date: 05/07/2026 Bid Date: 05/26/2026 Trades: Wastewater Treatment Plant/Facility Construction: Septage, WWTP/WRF/OSSF OnSite Sewage Treatment Station, Lift Station
#823788

Camelback Road, SR303L to City Limits, Goodyear, AZ

The work consists of widening Camelback Road and constructing raised medians. The work includes grading, excavation, embankment, concrete and asphalt concrete paving, drainage scuppers, landscaping, irrigation, pavement markings, signs, traffic signals, street lighting, intelligent transportation systems (ITS), and other related work.

Post Date: 05/13/2026 Bid Date: 05/26/2026 Trades: Class A - *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
#818843

RFP Water Wastewater and Hazardous Waste Laboratory Services, Mesa, AZ

To establish contracts for analytical testing of water, wastewater, solid wastes, and special projects for: nutrients, biologicals, metals, non-metals, organics, aquatic toxicity and radio chemicals with qualified licensed environmental laboratories.

Post Date: 04/13/2026 Bid Date: 05/27/2026 Trades: Inspection Services, Inspector of Record (IOR) Services & Testing Laboratories - NAICS 541380
#822573

59th Avenue & Northern Avenue Intersection Improvements, Glendale, AZ

Addition of a southbound right-turn lane, along with a bus pullout located on the departure side of the intersection at 59th Avenue and Northern Avenue.

Post Date: 05/06/2026 Bid Date: 05/27/2026 Trades: Class A - *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
#823028

32nd Street & Thomas Road Intersection Safey Improvements, Phoenix, AZ

This federally funded project will install a High Intensity Activated Crosswalk (HAWK) at the intersection of 32nd Street and Windsor, and provide additional lighting as needed along Thomas Road from 32nd Street to 30th Street and along 32nd Street from Thomas Road to Earl Drive.

Post Date: 05/07/2026 Bid Date: 05/27/2026 Trades: Class A - *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
#823793

RFSQ JOC General Civil, Goodyear, AZ

The Project consists of providing the following services: Civil site improvements (parks, playgrounds, landscaping, etc.); earthwork and dust stabilization; grading and drainage; storm drain systems; drainage structures; water, sewer, electrical, fiber, and other underground utility and infrastructure work; electrical service, lighting, and other power needs; concrete paving and flatwork; right-of-way and roadway improvements, asphalt overlay and pavement rehabilitation; signage and striping; traffic control and traffic signals; walls, retaining walls, fence and gate installation and repairs; A.D.A. retrofit work; structures and/or facilities incidental to the overall project; xeriscape conversion, new landscaping and/or restoration of associated landscaping, including all associated hardscape elements, and irrigation; artwork; and any other civil infrastructure improvements located within Citys limits of incorporation. The City may award multiple contracts under this procurement, with up to five (5) qualified contractor(s) being awarded contracts. This JOC Contract will have an initial term of three (3) years, with two (2) one-year extensions available at the Citys sole discretion.
Post Date: 05/13/2026 Bid Date: 05/27/2026 Trades: Class A - *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
#819515

**ew bid due date**RFQ Kyrene Branch and Highline Canal Shared Use Paths, Tempe, AZ

The Kyrene Branch and Highline Canal Shared Use Paths project is located along a portion of the Kyrene Branch Canal and Highline Canal. A 0.9-mile path along the Kyrene Branch Canal and a 0.25-mile path along the Highline Canal will connect to existing concrete paths in the City of Tempe. Bike lanes will also be added on Orchid Lane and 54th Street. The project improvements include concrete shared-use paths, lighting, landscaping and irrigation, wayfinding signage, signalized crossing, and pavement marking improvements.

Post Date: 04/16/2026 Bid Date: 05/28/2026 Trades: *Construction Management; General Contractor CM/CMGC/CMaC: Owner's Representative Services NIGP 925-44
#820978

RFP Seasonal Ice Rink Construction, Installation, and Removal Service, Mesa, AZ

The City of Mesa is soliciting Request for Proposal responses from qualified and experienced Ice Rink Management Companies to provide the equipment for, turnkey installation and removal of, and professional support for a custom oval holiday-season real-ice rink venue approximately 72 x 106 (about 6,005 square feet) to be staged at The Plaza @ Mesa City Center, as detailed herein.

Post Date: 04/27/2026 Bid Date: 05/28/2026 Trades: Class A - *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
#822335

RFP Family Bridge Housing Operations and Maintenance Services, Avondale, AZ

The City of Avondale is seeking proposals from qualified, licensed firms interested in providing professional services consisting of Family Bridge Housing Operations and Maintenance Services. The Contractor shall maintain the property in a safe, sanitary, functional, habitable, and operational condition suitable for continuous residential use. The Contractor shall also perform the work in a manner that supports, but does not replace, the work of the City and the program services provider.

Post Date: 05/05/2026 Bid Date: 05/28/2026 Trades: Professional Project Management Consulting Services (PM/PMCS) & Owner's Representatives, Class B - *General Building Contractor GBC: Building Construction, Enclosed Structures; Opportunities for Subcontractors, B-1 - *General Building Contractor GBC: Building Construction, Enclosed Structures; Opportunities for Subcontractors
#823796

RFSQ Estrella Parkway and MC85 Intersection Improvements, Goodyear, AZ

Seeking Statements from qualified professional architecture/engineering firms to be considered for a design services, and potentially administration and inspection services, for Estrella Parkway and MC85 Intersection Improvements.

Post Date: 05/13/2026 Bid Date: 05/28/2026 Trades: *A&E Architecture & Engineering: Design Services, Consulting & Planning: Professional, EOR Services, Feasibility Study
#824083

Construct Taxiway I (Future Taxiway H) 4800 E Falcon Drive, Mesa, AZ

This contract shall be for furnishing all labor, materials, transportation and services for the construction and/or installation of the following work: Construct new Taxiway H at Falcon Field Airport.
Post Date: 05/14/2026 Bid Date: 05/28/2026 Trades: Class A - *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
#824085

Rehabilitate West Vehicle Services Road (VSR), Mesa, AZ

This contract shall be for furnishing all labor, materials, transportation and services for the construction and/or installation of the following work: Rehabilitate and re-pave the West Vehicle Service Road at Falcon Field Airport.

Post Date: 05/14/2026 Bid Date: 05/28/2026 Trades: Class A - *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
#824679

RFSQ Agua Fria Trail Pedestrian Bridge, Avondale, AZ

The Citys trail system is progressing through its development in both public and private projects to create a continuous trail from north to south across the city along the Agua Fria River. A key component for the trail systems development is a crossing across an ADOT drainage channel between the citys Friendship Park and Interstate 10. The city is currently working with Michael Baker International on design of a pedestrian bridge at this key location. Design is currently scheduled to be completed to 60% in June 2026.

Post Date: 05/19/2026 Bid Date: 06/03/2026 Trades: *At Risk Construction Management CMaR: Owner's Representative Services NIGP 925-44
#822878

RFQ CMAR Valencia System Water Mains Upgrade, Buckeye, AZ

The City of Buckeye is looking for a qualified contractor to provide pre-construction and construction services for the Construction Manager at Risk Valencia System Water Mains Upgrade project. The project is located within the Valencia Subdivision between Apache Road to Miller Road and Maricopa Road to Baseline Road in Buckeye, Arizona. The project will be completed in two phases: Phase I: Pressure Reducing Valve; Phase II: Valencia Water Main Replacement The construction of the Water Main Replacements.

Post Date: 05/07/2026 Bid Date: 06/04/2026 Trades: *At Risk Construction Management CMaR: Owner's Representative Services NIGP 925-44
#822999

Drainage Improvements Gila Bend – Lukeville Highway (SR 85), Maricopa Co, AZ

The proposed project is located in Maricopa County on SR 85 south of Gila Bend between milepost 4.39 and milepost 6.02. The work consists of drainage improvement by extending existing Concrete Box Culverts (CBC) up to the Clear Zone at five locations within the project limits. The work also includes replacing existing pavement, removing existing guardrail and replacing existing fence, placing riprap, pavement marking and other related work.

Post Date: 05/07/2026 Bid Date: 06/05/2026 Trades: Class A - *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors