The 183rd Air Wing located at 3101 J. David Jones Pkwy Springfield, IL 62707 is looking for a 2-year contract for Lawn Care Services - Mowing, Trimming, and Weed Control.
Post Date: 06/07/2026Bid Date:06/11/2026Trades: *Landscaping Contractor & Groundskeeping, Xeriscaping, Hardscaping, Weed Control Grubbing Sodding Lawn Mowing Mulching
The Illinois State Police (ISP) requires a contract for Continental Access Control security systems, including integrated fire and burglar alarms, their compatible components and accessories, and receive installation and repair and maintenance on existing Continental Access Control Systems, for any ISP-owned or -maintained facility on an as-needed basis during the contract period.
Post Date: 06/07/2026Bid Date:06/11/2026Trades: *General Building Contractor GBC: Building Construction, Enclosed Structures; Opportunities for Subcontractors, Security System: FOB, Access Control, CCTV, Video Surveillance, Active Threat, Intrusion Alarms (Except Locksmiths) NAICS 561621, Building Maintenance, Installation & Repair Services: General Appliance Repair, Make Ready, Minor Renovations & Repairs
The project includes, but is not limited to the following work at various exterior locations: precast concrete repairs and coating, cleaning of exterior EIFS, replacement of CMU expansion joints, removal and replacement of sealant at limestone sills, and cleaning and sealing of exterior masonry.
Post Date: 06/07/2026Bid Date:06/11/2026Trades: *General Building Contractor GBC: Building Construction, Enclosed Structures; Opportunities for Subcontractors, Masonry Contractor, Precast Concrete; Mortar Repair, Tuckpointing, Brick Pointing, Finishing Joints
The project includes, but is not limited to, the following: select interior finished flooring demolition and replacement with Epoxy Resin flooring throughout the school.
Post Date: 06/07/2026Bid Date:06/11/2026Trades: *General Building Contractor GBC: Building Construction, Enclosed Structures; Opportunities for Subcontractors, Floor Covering and Flooring Contractor, Including Carpet, Wood, Marble, Tile, Ceramic, Linoleum, Vinyl
The work consists of furnishing all labor, materials, equipment, and other incidentals necessary for the completion of HMA pavement patching, storm sewer cleaning, bridge deck repairs, superstructure repairs, substructure repairs, lighting, and other incidental and miscellaneous items of work in accordance with the plans, Standard Specifications, and these special provisions. This project is located on IL-53/I-290 in the Elk Grove Township and City of Schaumburg, Cook County, from south I-90 interchange to IL 72 (Higgins Rd).
Post Date: 05/11/2026Bid Date:06/12/2026Trades: *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
The work consists of full-depth reclamation, roadway resurfacing, aggregate shoulders, pavement striping, and all incidental and collateral work necessary to complete the project as shown on the plans and as described herein. The project is located on Brown Road (FAU 0178) from Illinois Route 64 to Old LaFox Road, Campton Hills Road (FAU 0117) from Anderson Road to Town Hall Road, Denker Road (FAU 0026) from Bolcum Road to Silver Glen Road, and Town Hall Road (FAU 0226) from Campton Hills Road to Illinois Route 64 in the Village of Campton Hills, Kane County, Illinois. The net and gross length of the project is 26,883 feet (5.09 miles).
Post Date: 05/11/2026Bid Date:06/12/2026Trades: *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
The work shall consist of furnishing all labor, materials, equipment, and other incidentals necessary for the completion of milling and resurfacing with hot-mix asphalt (HMA), pavement patching (less than 10%), spot curb and gutter replacement, ADA sidewalk ramp replacement, pavement striping, landscaping, restoration, and all other incidental and collateral work necessary to complete the project as shown in the plans and as described herein. The project is located along Wheeler Road from Esker Drive to approximately 700-feet west of Illinois Route 47 (IL 47). The gross and net total length of the project is 8,198 feet (1.55 miles). The project is located in the Village of Sugar Grove in Kane County, Illinois. A location map is shown on the cover of the plans.
Post Date: 05/11/2026Bid Date:06/12/2026Trades: *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
The work shall consist of furnishing all labor, materials, equipment, and other incidentals necessary for the completion of milling and resurfacing with hot-mix asphalt (HMA), pavement patching (less than 10%), pavement striping, recessed reflective pavement markers, and all other incidental and collateral work necessary to complete the project as shown in the plans and as described herein. The project is located along Dugan Road from the Village limit south of Fays Lane to the Village limit north of Wheeler Road, with an omission from south of the Granart Road roundabout to the north leg of the intersection at US Route 30. The gross length of the project is 11,643 feet (2.21 miles) and the net total length of the project is 9,494 feet (1.80 miles). The project is located in the Village of Sugar Grove in Kane County, Illinois. A location map is shown on the cover of the plans.
Post Date: 05/11/2026Bid Date:06/12/2026Trades: *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
The work consists of furnishing all labor, materials, equipment, and other incidentals necessary for the completion of hot-mix asphalt resurfacing; curb and gutter repair; PCC sidewalk; adjustment of drainage structures; parkway restoration; and other incidental and miscellaneous items of work in accordance with the Plans, Standard Specifications, and these Special Provisions. The project is located on 1st Street, from Dunning Avenue to IL Route 72 (W Main Street), in the Village West Dundee, Kane County, Illinois. The gross and net length of the project is 3,034 ft (0.575 mi). A location map is shown on the cover of the Plans.
Post Date: 05/11/2026Bid Date:06/12/2026Trades: *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
Work will consist of removing the asphalt surface course, constructing an asphalt leveling binder and surface course as well as constructing asphalt patches; repairing segments of combination curb and gutter; repairing minor drainage structure deficiencies; installing pavement marking and providing traffic control and protection as well as all incidental and collateral work necessary to complete the project as shown on the plans and described herein. The work will be performed on Skokie Boulevard from southern of Village limits to Lake-Cook Road within the Village of Northbrook, Cook County, Illinois. The net length is 8,885 feet (1.682 Miles) and the gross project length is 9,130 feet (1.729 Miles).
Post Date: 05/11/2026Bid Date:06/12/2026Trades: *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
The work consists of hot-mix asphalt surface removal, resurfacing with hot-mix asphalt surface course and polymerized leveling binder, pavement patching, spot sidewalk replacement, spot curb and gutter replacement, pavement marking installation, and all incidental and collateral work necessary to complete the project as shown in the plans and as described herein. This project is located along Lexington Drive, from McHenry Road (IL-83) to the south of Lake Cook Road. The gross length of improvements is 2,545 feet (0.48 miles). The project is located within the Village of Wheeling, Cook County, Illinois.
Post Date: 05/11/2026Bid Date:06/12/2026Trades: *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
Install advance warning and stop bar pavement markings, install solar flashers, replace existing warning and advanced warning signs. Covert existing two-way stop-controlled intersections to all way stop controlled at IL 75 and Meridian Road and US 52 at Freeport Road. US 52 at IL 78, IL 251 at Chicago/Shaw Road, IL 72 at River Road/German Church Road, IL 75 at Meridian Road, IL 70 at Meridian Road and US 52 at Freeport Road.
Post Date: 05/11/2026Bid Date:06/12/2026Trades: *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
The contract work consists of installing 3350 lineal feet of Shared-Use Path, HMA pavement removal, HMA replacement, PCC curb & gutter removal & replacement, Driveway Replacement, Storm Sewer & Storm Structures, and disturbed site restoration. The project is located in the Village of Rockton, Winnebago County along West Rockton Road, from Whitman Post Elementary to Old Meadow Lane.
Post Date: 05/11/2026Bid Date:06/12/2026Trades: *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
Construction of sidewalk improvements including ADA-compliant curb ramps and completing sidewalk gaps near Denkmann Elementary School. Reconstruct portions of the intersecting roads and residential driveways. Project is proposed in the City of Rock Island along 20th Avenue from 38th Street to 44th Street, along 41st Street from Denkmann School to 18th Avenue, at the intersections of 22nd Avenue and 39th Street, 22nd Avenue and 40th Street, 22nd Avenue and 41st Street, 22nd Avenue and 42nd Street and 22nd Avenue and 44th Street.
Post Date: 05/11/2026Bid Date:06/12/2026Trades: *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, Concrete Contractor: Pavement, Driveways, Sidewalks, Curbs, Gutters, Flatwork, ADA Ramps Pedestrian Improvements, CIP Concrete
This section consists of constructing a Hot-Mix Asphalt Surface Course, Hot-Mix Asphalt Binder Course, HMA Shoulders, Aggregate Shoulders and all other work necessary to complete the project according to the plans and specifications. County Highway 9 starts at IL 49 (1300E/1000N) from Station 0+84 heading easterly to Station 503+20 ending at the West Milford Village Limits
Post Date: 05/11/2026Bid Date:06/12/2026Trades: *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
This section consists of constructing a Hot-Mix Asphalt Surface Course, Hot-Mix Asphalt Binder Course, Aggregate Shoulders and all other work necessary to complete the project according to the plans and specifications. County Highway 9 starts at 300 East Road (300E/800N) from Station 318+30 heading easterly to Station 393+16 ending at US 45.
Post Date: 05/11/2026Bid Date:06/12/2026Trades: *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
The project consists of removal and replacement of sidewalk and other collateral work. The project is located along the south side of SW 6th St. from just west of College Ave. (IL 94) to the school entrance just west SW 9th Ave.
Post Date: 05/11/2026Bid Date:06/12/2026Trades: *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
The project consists of the following: CH 2 CAPE Seal and pavement markings. CH 9 Bituminous Surface Treatment, A-2 and CH 16 Bituminous Surface Treatment, A-2.
Post Date: 05/11/2026Bid Date:06/12/2026Trades: *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
The proposed improvement consists of 5.9 miles of HMA surface removal followed by a 2.75 standard overlay on IL 29 and sections of IL 123 and Andrew Road. Other improvements include installing aggregate wedge shoulders, pavement markings, and the installation of a traffic counter. The project is located on IL 29/123 from 0.1 miles west of the Menard/Sangamon County line to IL 29/IL 123 junction and from IL 123 to 0.1 miles south of Andrew Road in Menard and Sangamon Counties.
Post Date: 05/11/2026Bid Date:06/12/2026Trades: *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
This project consists of HMA surface removal, 2 HMA binder and 1 HMA surface, constructing 4 foot paved shoulders with milled rumble strips; aggregate wedge shoulders, removing and replacing concrete gutter, removing and replacing guardrail, and installing pavement markings. The project is located 0.1 miles east of IL 96 (N) to 0.1 miles east of 1343rd Lane (Old US 24) east of Fowler.
Post Date: 05/11/2026Bid Date:06/12/2026Trades: *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors