4.99 miles of Pavement Rehab Designed-Overlay Resurfacing (INT-4th), Pipe Underdrains, 1.8 miles South of Shirley to I-55/74 Interchange Southwest of Bloomington IL, Springfield, IL
The intent of the project is to resurface FAI 55, replace pipe underdrains, and resurface ramps from 1.8 mi S of Shirley to I-55/74 interchange southwest of Bloomington. This work shall be completed utilizing a combination of ramp closures and lane closures in accordance with the applicable Highway Standards. Appropriate measures shall be taken by the Contractor to preserve and protection the surrounding environment.