Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

Browse all Illinois

#826285

Cleaning and Painting all Steel and Structural Steel Components - Grundy County, Springfield, IL

This work consists of cleaning and painting all steel and structural steel components of the structures. Location: Structure No. 032-0092 carrying Carbon Hill Rd. (TR182) over F.A.I. Route 55 (I-55) approximately 4.79 mi., south of Reed Rd.

Post Date: 05/27/2026 Bid Date: 06/12/2026 Trades: *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, Industrial Painting & Coating Contractor: Tanks, Bridges, Corrosion Protection
#826287

Replacement of SN 058-0021 carrying US 36 over Long Creek tributary approximately 1.6 miles east of IL 121, Springfield, IL

This project consists of removing and reconstructing SN 058-0021 utilizing staged construction, HMA resurfacing, earthwork, guardrail and traffic barrier terminals, pavement marking, and any other work necessary to complete this section. Location: This project is located at existing SN 058-0021 that carries US 36 over the Long Creek Tributary, approximately 1.6 miles east of IL 121 in Macon County.

Post Date: 05/27/2026 Bid Date: 06/12/2026 Trades: *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, Earthwork & Paving Contractor: Pavement Preservation, Resurface, Slurry Seal, High Friction, Milling, Land Clearing, Trails/Path
#826289

Removal and replacement of the fabric reinforced elastomeric troughs - F.A.S. Route 268A (CH 15) over the Illinois River in LaSalle County, Springfield, IL

This work consists of the removal and replacement of the fabric reinforced elastomeric troughs and associated hardware. Location: This project is located at Structure No. 050-0219 carrying F.A.S. Route 268A (CH 15) over the Illinois River approximately 0.4 mile 66?Tsouth of US 6 (Marseilles) in LaSalle County.

Post Date: 05/27/2026 Bid Date: 06/12/2026 Trades: *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
#826293

9.6 miles of Micro-Surfacing on IL 127 from the Montgomery County line to 0.1 miles north of IL 140, Springfield, IL

This project consists of a one pass of micro-surfacing and all incidental and collateral work necessary to complete the project as shown on the plans and as described here in. Location: This project is located on IL 127 from Montgomery County line to 0.1 miles north of IL 140.

Post Date: 05/27/2026 Bid Date: 06/12/2026 Trades: *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
#826294

Bridge Deck Work - I-64 over Little Silver Creek and Silver Creek, 1.5 miles west of the IL 4 interchange, Springfield, IL

The project consists of partial depth bridge deck patching and replacement of microsilica concrete overlay, joint replacement with preformed joint strip seals, replacement of end diaphragms with galvanized end diaphragms, and cleaning and painting of beam ends and fascia beams. Location: The project is located on I-64 over Little Silver Creek and Silver Creek, 1.5 miles west of the IL 4 interchange, at SN 082-0186 & 082-0188 on WB I-64 and at SN 082-0187 & 082-0189 on EB I64.

Post Date: 05/27/2026 Bid Date: 06/12/2026 Trades: *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, Highway, Roadways, Bridge, Railroad, Airport Construction, Maintenance & Repair: Horizontal Construction
#826296

Bridge Cleaning at various locations in Madison and St. Clair counties, Springfield, IL

The work consists of bridge cleaning and associated traffic control and collateral work necessary to complete the project as shown on the plans and as described herein. Location: This project is at seven structures located throughout Madison and St. Clair counties.

Post Date: 05/27/2026 Bid Date: 06/12/2026 Trades: *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, Industrial Cleaning & Sanitation Preparations; Disinfection Services, Filter Building, Ultraviolet (UV) Disinfection System, Pressure Washing Contractor: Sand & Water Blasting, Hydroblasting, Power Washing Services, Graffiti Removal
#826298

Bridge painting on SN 060-0350 and 060-0351 carrying I-270 over the Mississippi River., Springfield, IL

This project consists of bridge painting and all incidental and collateral work necessary to complete the project as shown on the plans and as described herein. Location: This project is located on the I-270 Bridge, SN 060-0350 and 060-0351, at the Mississippi River.

Post Date: 05/27/2026 Bid Date: 06/12/2026 Trades: *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, Industrial Painting & Coating Contractor: Tanks, Bridges, Corrosion Protection
#826299

2.8 miles of Road Resurfacing on IL 150 from 0.2 miles north of Cutler (Reeses Hill Road) to IL 154, Springfield, IL

The project involves pavement patching, HMA surface removal, 1/2 HMA binder and surface course, raised reflective pavement markers, and pavement markings. Location: This improvement consists of resurfacing 2.82 miles of roadway along IL 150 from 0.2 mi N of Cutler (Reeses Hill Rd) to IL 154 intersection.

Post Date: 05/27/2026 Bid Date: 06/12/2026 Trades: *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, Earthwork & Paving Contractor: Pavement Preservation, Resurface, Slurry Seal, High Friction, Milling, Land Clearing, Trails/Path
#826301

1.8 miles of Road Resurfacing on IL 148 from IL 14 to Yellow Bank Road, Springfield, IL

The project involves overlay and inlay f with the proposed work of 1 HMA surface removal and 1 1/2 HMA binder and surface course resurfacing for overlay and 3 HMA surface removal and 1 1/2 HMA binder and surface course resurfacing for inlay. Location: This improvement consists of resurfacing of IL 148 from IL 14 to Yellow Banks Rd.

Post Date: 05/27/2026 Bid Date: 06/12/2026 Trades: *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, Earthwork & Paving Contractor: Pavement Preservation, Resurface, Slurry Seal, High Friction, Milling, Land Clearing, Trails/Path
#826303

Bridge Deck Overlay and Bridge Painting - I-72 over TR 92 (250th Street), NS Railroad, Hadley Creek and TR 149 (315th Street), 1.8 miles west of CH 4 at the Barry interchange. , Springfield, IL

The proposed improvement consists of: SN 075-0098 & 0099: Replacement of expansion joints, finger joint plate adjustment, bridge deck scarification and microsilica concrete overlay, diamond grinding, and bridge painting. Girder 5 is also to be strengthened at west abutment and pier 4 on SN 075-0099 (WB). Roadway Work: HMA overlay, replacement of bridge approach shoulder pavement at the west abutment, shoulder inlet and pipe drain replacements, concrete curb, guardrail replacement, and reinstalling pavement markings. Roadway Weather Information System (RWIS): Removal and disposal of the existing RWIS and the complete replacement of the roadway weather information system at a different location within the project limits. Work items include a concrete pad, chain link fence, conduit, and other associated work items. Location: The project is located over 250th Street, Norfolk Southern Railway, Hadley Creek & 315th Ave, 1.8 miles west of CH 4 at Barry Interchange.

Post Date: 05/27/2026 Bid Date: 06/12/2026 Trades: *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, Industrial Painting & Coating Contractor: Tanks, Bridges, Corrosion Protection
#826304

Road Resurfacing Work - IL 100 from 0.9 miles south of Oak Street in Milton to south of CH 10 (Vin Fiz Road) west of Pearl, Springfield, IL

The proposed improvement consists of pavement patching, HMA surface removal, a 2 single lift standard HMA overlay, resurfacing HMA shoulders, 3-foot aggregate wedge shoulders, and new pavement markings. Location: The project is located on IL 100 from 0.9 miles south of Oak Street in Milton to south of CH 10, west of Pearl in Pike County.

Post Date: 05/27/2026 Bid Date: 06/12/2026 Trades: *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, Earthwork & Paving Contractor: Pavement Preservation, Resurface, Slurry Seal, High Friction, Milling, Land Clearing, Trails/Path
#826306

Removal and replacement of SN 002-0012 carrying IL 3 over a drainage ditch 0.5 miles west of IL 127., Springfield, IL

This project involves the complete removal and replacement of S.N. 002-0012. Stage construction in two stages will be used to maintain traffic during construction. The project improvements include full-depth pavement removal, PCC Pavement, HMA resurfacing, HMA shoulders along with guardrail and roadway embankment. Temporary seeding and mulch with permanent seeding is included. Location: This project is located on IL 3 at the existing S.N. 002-0012 over drainage ditch in Alexander County, Illinois. The project will extend from Sta. 530+00.00 and runs west to Sta. 537+05 for a length of approximately 705.00 feet on IL 3.

Post Date: 05/27/2026 Bid Date: 06/12/2026 Trades: *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, Earthwork & Paving Contractor: Pavement Preservation, Resurface, Slurry Seal, High Friction, Milling, Land Clearing, Trails/Path
#826308

New 5x3 culvert under US 41 and Road Work - Located in the Village of Lake Bluff and Shields Township in Lake County., Springfield, IL

The scope of work for this improvement includes a new 5x3 culvert under US 41 with associated pavement removal and patching, and ditch grading along US 41. Work includes pavement removal and patching, temporary concrete barriers, curb and gutter, barrier median, landscaping and all incidental and collateral work necessary to complete the project as shown on the plans and described herein. Location: The work on this project is located in the Village of Lake Bluff and Shields Township in Lake County. The project includes a new culvert and grading at US 41 approximately 600 feet north of the Wisconsin Central Limited (WCL) Bridge over US 41, grading along the west side of US 41 north of the WCL bridge, and along the east ditch of US 41 500 feet south of the WCL Bridge. The Gross length of the project is 1,477 feet (0.280 mile) and net length is 630 feet (0.119 miles).

Post Date: 05/27/2026 Bid Date: 06/12/2026 Trades: *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, Stormwater Drainage: Manholes & Valve Boxes, Ditches, Culverts, Shoulder Work, Grates, French Drains, Dewatering, Water Swales
#826313

Reconstruction of Benton Square (IL 14 / IL 37) with improved turning movements and island crosswalks. , Springfield, IL

This project involves converting the Benton Square to a roundabout through using splitter islands, pavement markings, and signage. Proposed work include HMA resurfacing, PCC pavement, pedestrian and ADA compliant crosswalks, raised splitter islands, and mountable truck aprons. Location: This improvement is located at the Benton square, the intersection of IL 14, IL 37, and IL 34, in Franklin County.

Post Date: 05/27/2026 Bid Date: 06/12/2026 Trades: *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, Road Improvements: Parking & Highway Improvements; Intersections, Roundabout, Median Construction - NAICS 237310
#826482

RFQ Roof Replacement, Chicago, IL

Total Small Business Set-Aside, 238160 - Roofing Contractors. The scope includes removing the existing roof drains, removing the vegetated roof system, and associated construction down to the existing concrete roof deck, perform concrete deck repair, and install a new conventional roof system including but not limited to vapor retarder, roof drains, insulation, roof membrane, and copings.

Post Date: 05/28/2026 Bid Date: 06/12/2026 Trades: Roofing Contractor, Facia Board & Soffit Replacement, Gutters, Downspouts, Snow Guards
#826673

Bridge Replacement and Widening project - City of Chicago, Cook County on Laramie Ave. over I-290., Springfield, IL

The work consists of the replacement of the Laramie Avenue Bridge over I-290 and the CTA Blue Line (Existing SN 016-2064/Prop SN 016-2015), including deck widening to provide a Uturn Lane; retaining walls (Prop SN 016-W2545 and SN 016-W2546) to facility future I-290 improvements. Other improvements include pavement resurfacing/reconstruction within the existing roadway footprint, curb and gutter replacement, sidewalk replacement (including ADA improvements), various drainage improvements, watermain (including jacking beneath I-290), signing, pavement markings, bridge and underpass lighting, traffic signal modernization. The work also includes replacement storm manhole within CTA right of way 385-ft east of Lavergne Ave. Location: City of Chicago, Cook County, on Laramie Avenue and begins 47 south of Lexington St and extends to Harrison Street. The project has a total gross length of improvement of 710.53 ft. (0.1346 Miles) and a net length of improvement of 710.53 ft. (0.1346 Miles).

Post Date: 05/31/2026 Bid Date: 06/12/2026 Trades: *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, Dikes & Embankments, Barriers: Containment/Diversion of Water, Flood Prevention, Land Protection, *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, Earthwork & Paving Contractor: Pavement Preservation, Resurface, Slurry Seal, High Friction, Milling, Land Clearing, Trails/Path, Concrete Contractor: Pavement, Driveways, Sidewalks, Curbs, Gutters, Flatwork, ADA Ramps Pedestrian Improvements, CIP Concrete, Stormwater Drainage: Manholes & Valve Boxes, Ditches, Culverts, Shoulder Work, Grates, French Drains, Dewatering, Water Swales
#826675

Crack and Joint Sealant Improvement - City of Geneva and West Chicago in Kane and DuPage Counties, Springfield, IL

This is a crack and joint sealant improvement consisting of routing, cleaning, and sealing of longitudinal cracks and joints within the portland cement concrete pavement, portland cement concrete patching, grading and shaping shoulders, some guardrail replacement, restriping with modified urethane pavement marking, and all incidental and collateral work necessary to complete the work shown on the plans and described within. Location: This improvement begins at a point on the centerline of IL 38 (Roosevelt Road) approximately 291 feet west of Elm Road and extends in an easterly direction to a point approximately 1576 feet west of Kress Road for a total distance of 6909 feet (1.31 miles). This improvement is located within the City of Geneva and West Chicago in Kane and DuPage Counties.

Post Date: 05/31/2026 Bid Date: 06/12/2026 Trades: *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, Stone Masonry Contractor: Block Wall, Chimneys, Retaining Walls, *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, Earthwork & Paving Contractor: Pavement Preservation, Resurface, Slurry Seal, High Friction, Milling, Land Clearing, Trails/Path, Standard & High-Risk Safety Systems: Vehicle Guides Barricades Barriers Guardrail Attenuators Crash Cushions Bollards
#826678

Ditch Regrading, Culvert Replacement, and various other Drainage Improvements - DuPage County, Cook County and Kane County , Springfield, IL

The work on this project consists of ditch regrading, culvert replacement, and various other drainage improvements. Location: This project has multiple locations: the first location is at US Route 20 and I-355 northbound on Ramp and IL Route 53 in DuPage County, the second location is along IL Route 72 (Higgins Road) west of Roselle Road in Cook County, the third location is along IL Route 171 from IL Route 83 to Willow Springs Road in Cook County and the fourth location is along US Route 20 west of IL 47 in Kane County.

Post Date: 05/31/2026 Bid Date: 06/12/2026 Trades: Highway, Roadways, Bridge, Railroad, Airport Construction, Maintenance & Repair: Horizontal Construction, Earthwork & Paving Contractor: Pavement Preservation, Resurface, Slurry Seal, High Friction, Milling, Land Clearing, Trails/Path, Stormwater Drainage: Manholes & Valve Boxes, Ditches, Culverts, Shoulder Work, Grates, French Drains, Dewatering, Water Swales
#826680

Crack and Joint Sealing - Lake County IL, Springfield, IL

This crack and joint sealing improvement consists of routing, cleaning, and sealing of longitudinal cracks in existing HMA (Hot-Mix Asphalt) pavement and between the existing HMA pavement and curb and gutter, restriping with Modified Urethane pavement marking lines, and all incidental and collateral work necessary to complete the work shown on the plans as described herein. Location: This project begins on the centerline of IL 132 (Grand Avenue), approximately 20-feet east of the intersection at IL 59 and extends east along IL 132 (Grand Avenue) to a point 25-feet west of the intersection at Cleveland Avenue. The project is located within the Village of Lake Villa and unincorporated Lake Villa Township in Lake County.

Post Date: 05/31/2026 Bid Date: 06/12/2026 Trades: Highway, Roadways, Bridge, Railroad, Airport Construction, Maintenance & Repair: Horizontal Construction, Concrete Contractor: Pavement, Driveways, Sidewalks, Curbs, Gutters, Flatwork, ADA Ramps Pedestrian Improvements, CIP Concrete
#826682

Adding 10 traffic signals into the Central Traffic Management System - The project is in the Village of Olympia Fields, Village of Franklin Park, City of Northlake and City of Berwyn in Cook County, Springfield, IL

This project proposes adding 10 traffic signals into the Central Traffic Management System and connecting two existing closed-loop systems together. This project will install fiber optic cable, network switches, PTZ Cameras and traffic signal controllers among other equipment to allow for remote access and monitoring capabilities at these locations. This project will improve traffic progression at these locations and allow for the District 1 network to expand for remote control and access to each traffic signal. Location: The Project is located in four different areas of Cook County. The first location is located along US Route 30 from Olympian Way to Orchard Dr in the Village of Olympia Fields. The second location is located along 25th Avenue from IL Rte 64 (North Ave) to Armitage Ave in the Village of Franklin Park. The third location is located primarily along Grand Ave from Northwest Ave to Wolf Rd with additional intersection located off of Wolf Rd at Diversey Ave located in the City of Northlake. The fourth location is located along IL Rte 43 (Harlem Ave) from 16th St to Cermak Ave and along Oak Park Ave from 16th to 26th St and then along 26th St from Oak Park Ave to Highland Ave located in the City of Berwyn.

Post Date: 05/31/2026 Bid Date: 06/12/2026 Trades: Road Improvements: Parking & Highway Improvements; Intersections, Roundabout, Median Construction - NAICS 237310, Earthwork & Paving Contractor: Pavement Preservation, Resurface, Slurry Seal, High Friction, Milling, Land Clearing, Trails/Path, Traffic Signals, Calming, Intelligent Transportation (ITS): Automated Enforcement Systems (AES) & Speed Traffic Recorders (TMS)