Basement Flood Prevention Program, Cicero, IL
This service will include the installation of backflow prevention valves for approved single-family homeowners to prevent future flooding and sewer back-up.
Need an account?
Remembered your password?
Already have an account?
This service will include the installation of backflow prevention valves for approved single-family homeowners to prevent future flooding and sewer back-up.
Airport Maintenance for O'Hare and Midway International Airports
Universal EV LLC is soliciting competitive proposals from qualified General Contractors for the turnkey supply, installation, commissioning, operations, and maintenance of DC Fast Charging (DCFC) infrastructure at 1312 Carolyn Dr, Minonk, IL 61760 (Woodford County), funded through the Illinois NEVI Program.
Scope includes: 4 x 150kW DC Fast Chargers (600kW total), 500kVA transformer, full electrical infrastructure, civil work, 5-Year Warranty, 5-Year O&M Plan, and 5-Year Service Level Agreement. Contractor furnishes ALL equipment and materials. Owner provides network/OCPP only.
Full RFP available at: https://universalevcharging.com/rfp-minonk-il-001/
Project Type: Electrical / EV Infrastructure
Location: 1312 Carolyn Dr, Minonk, IL 61760
County: Woodford County, Illinois
Bid Due Date: 06/26/2026
Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside, 236220 - Commercial and Institutional Building Construction. The contractor will provide professional construction services for installation of DDPO2 at the Hines VA Medical Center
Rehabilitation of approximately 15,749 lineal feet of existing sanitary and storm sewers by sewer lining using a "trenchless" technique of cured-in-place sewer liner. Sewers range in size from 8-inch diameter to 18-inch diameter.
The City of Urbana is seeking assistance to clean and televise approximately 64,000 linear feet of storm sewer located within public ROW or utility easement, located in the City's Sewer Maintenance Zone 6. This project would include the furnishing of all materials, equipment and labor necessary to clean and televise the storm sewer ranging in size from 6-inch to 84-inch diameter. This work will include water jet cleaning and tree root sawing; debris removal and disposal from storm sewer, manholes, and inlets; closed circuit televising and digital recording and internal inspection of storm sewer pipes.
The project on which bids are invited is generally and briefly described herein as Maintenance Building Trench Drain Replacement Phase II for the Dupage Airport Authority Located in West Chicago, IL
Stateville Correctional Center is seeking a vendor for water testing services for Stateville's community water supply located in Crest Hill, IL for a period of 3 years
Hammond Elementary - Restrooms refresh renovation - Open to contracted pre-qualified pool for Various Trades ONLY for Chicago Public Schools, IL
Falconer ES - Cosmetics Upgrade & Utility Lines Removal - Open to contracted prequalified pool for Various Trades ONLY for Chicago Public Schools, IL
Disney II HS - Auditorium ACM and LBP Abatement/Mitigation - Open to contracted pre-qualified pool for Environmental Contractors ONLY for Chicago Public Schools, IL
City of Moline Home Repair and Accessibility Program (HRAP 2) at 1018 10th St. Silvis, IL
Homeowner Assistance Fund Home Repair Program (HAFHR) 4368 10th St. East Moline, IL
The Village of Oswego is seeking a contractor to apply crack fill and bituminous surface treatment, class A2, for eight miles of asphalt path. Work includes painted pavement markings in accordance with the Illinois Manual on Uniform Traffic Control Devises (MUTCD), latest edition. Locations of existing pavement markings shall be documented prior to application of seal coat and new markings shall be applied in the same locations as existing unless instructed otherwise by the Village representative. The timing of crack sealing and sealcoating for each path shall be coordinated at least 48 hours in advance with the designated Village representative.
It is the intent of Lake County to enter into a contract for Full-Service Extermination and Pest Control Services for multiple Lake County Facilities. The services shall include, but not limited to, humane trapping and/or prevention of birds, rats, mice, cockroaches, ants, silverfish, bedbugs, spiders, and other crawling insects and pests in various Lake County buildings with minimal environmental impact.
Sealcoating Maintenance at Greater Rockford Airport, Amazon Building and Cargo Building
Maywood Public Library - Tuckpointing & Lintel Replacement of the Carnegie Building - Location: Maywood Public Library - 121 S. 5th Ave., Maywood, IL 60153
These specifications include requirements for all planning, design, deployment, materials, transportation, equipment, and labor necessary to complete the leak detection and location services. The water system includes approximately 140 miles of watermain and approximately 2,200 hydrants (full system) consisting predominantly of cast iron and ductile iron main. The scope includes a minimum of two (2) full system Leak Detection Surveys (generally one in the Spring/Summer and one in the Fall/early Winter) approximately six (6) months apart. Each survey shall include complete leak detection and location survey of the full system using sonic detection to listen on all hydrants and strategic main line valves and selected B-Box service valves using sensitive sound intensifying instruments. If a leak is suspected, the location will be further investigated with an electronic correlator and ground microphone to pinpoint the exact leak location. The leak location shall be marked with blue paint. The contractor shall record all defective system components found during the surveys such as hydrants, valves and b-boxs as well as any map errors that are noted during the course of the surveys.
Wetland Mitigation Credits Study for Village of Orland Park IL
Replace Roofing Systems - Shapiro Developmental Center - Engineering Center 100 E Jeffery St, Kankakee, IL 60901