2026 Emergency Wastewater Repairs, Denver, CO
The City and County of Denver Department of Transportation & Infrastructure Wastewater Management Division requires a 3-year long contract to perform wastewater emergency repair construction work. This contract will be utilized on an as-needed basis for multiple emergency repairs. Contract term is three years and the maximum contract amount is $3,000,000.00 (contract amount is no guarantee of work). All work needs to follow City and County of Denver specifications, standard details, and criteria. The following is a general outline and description of work for the Emergency Repair to Wastewater Facility project for WMD Construction Operations. The work includes any construction repairs on wastewater facilities (ponds, outfall, etc), water quality facilities (ponds, outfalls, trash racks, etc), and sewer (storm and sanitary conduits) components including,but not limited to: Excavations, Plumbing, Trucking, Paving, Landscaping, Reinforced concrete structures, etc., Lift station and pump station repair is also needed.