Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

Browse all Illinois

#827113

Herbicide, Seeding, Landscaping, and Maintenance for this pollinator project located along FAI 55 (I-55) at the Limestone Rest Area sites south of Pontiac, IL. , Springfield, IL

This work shall consist of brush removal and herbicide applications within the proposed planting areas, seed bed preparation including the application of soil amendment products, native seed installation, erosion control blanket installation, and maintenance of seeded and landscaped areas for a period of two (2) growing seasons following installations. The planting areas include slopes that may make portions of the work challenging. Contractors are encouraged to familiarize themselves with the sites and ensure their equipment is appropriate for site conditions prior to bidding. Location: This project is located along FAI 55 (I-55) at the Limestone Rest Area sites south of Pontiac, IL. The northbound rest area is located at approximately mile post 193.0 and the southbound rest area is located at approximately mile post 194.0.

Post Date: 06/02/2026 Bid Date: 06/12/2026 Trades: Pesticide & Herbicide Applications: Chemical Root Control or Mosquito Control (Adulticide, Larvicide), *Landscaping Contractor & Groundskeeping, Xeriscaping, Hardscaping, Weed Control Grubbing Sodding Lawn Mowing Mulching
#827116

Repair Damaged High Tension Cable Median Barrier, Guardrail, Attenuators - Various Routes in District 3, Springfield, IL

The work in this contract consists of furnishing all labor, equipment, and materials necessary for the installation, repair, maintenance or replacement of damaged guardrail, fence, attenuators, and other highway appurtenances; the repair of high-tension cable median barrier; and minor concrete repairs at locations throughout District 3. This includes the minor adjustment of connecting parts of the installation as specified elsewhere. The work to be done at any location will be indicated on the work order by the Engineer. The damage to repair is generally a result of automobile accidents; therefore, the need and locations of any repairs are random in nature. The work also includes providing traffic control. Location: Locations of repair will be determined by District 3. The nine counties that comprise District 3 are Bureau, DeKalb, Ford, Grundy, Iroquois, Kankakee, Kendall, LaSalle, and Livingston. This also covers any other locations maintained by District 3.

Post Date: 06/02/2026 Bid Date: 06/12/2026 Trades: *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, Standard & High-Risk Safety Systems: Vehicle Guides Barricades Barriers Guardrail Attenuators Crash Cushions Bollards
#827117

Pavement Patching and Joint Repair along I-39 at the following interchanges in LaSalle County, Springfield, IL

This project consists of Class A Pavement Patching, Partial Depth Patching, Cross Stitching, gore area resurfacing and pavement marking on interchange ramp tie-ins. Location: This project is located on I-39 entrance and exit ramps in LaSalle County at the following interchanges: CH 54 (TONICA) SOUTHBOUND ONLY IL 71 IL 251 WALNUT ST (OGLESBY) I-80 US 34 (MENDOTA)

Post Date: 06/02/2026 Bid Date: 06/12/2026 Trades: *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, Earthwork & Paving Contractor: Pavement Preservation, Resurface, Slurry Seal, High Friction, Milling, Land Clearing, Trails/Path
#827118

Pickup, Removal and satisfactory Disposal of Debris - District 3 on interstates I-180, I-39, and I-80, throughout Bureau, LaSalle, Kendall, and Grundy Counties, Springfield, IL

This work consists of removing and disposing of Litter and Debris that has accumulated within the right-of-way of the Interstate Routes, including, but not limited to, medians; inside and outside areas adjacent to exit and entrance ramps at various interchanges; interchange gore areas between mainline and ramps; and inside and outside of on/off ramps at rest areas within District 3. Location: This project is located on various interstate routes within the following counties. Bureau County LaSalle County Grundy County 1. Interstate Route 80 1. Interstate Route 80 1. Interstate Route 80 2. Interstate Route 180 2. Interstate Route 39 The district is responsible for I-180 in Putnam County, from the Illinois River Bridge (MM 13) to the west end of SN 07-0035 on IL 71(MM 14.55). This also includes the ramps at the IL 26, Hennepin exit. The westbound lanes of I-80, from Mile Marker 120.23 to Mile Marker 122.77, including the westbound exit and entrance ramps at Minooka, are in Kendall County.

Post Date: 06/02/2026 Bid Date: 06/12/2026 Trades: *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, Litter & Trash Pickup & Road & Sidewalk Sweeping: Branch & Leaf Collection & Disposal: On-Call & Regular Services, Cleanup Contractor: Debris Removal, Obstruction Hauling, Building/Grounds/Structures/Water - Demolition & Hauling
#827120

Litter picking on interstate I-55, throughout Livingston and Grundy Counties in District 3. , Springfield, IL

This work consists of removing and disposing of Litter and Debris that has accumulated within the right-of-way of the Interstate Routes, including, but not limited to, medians; inside and outside areas adjacent to exit and entrance ramps at various interchanges; interchange gore areas between mainline and ramps; and inside and outside of on/off ramps at rest areas within District 3. Location: This project is located on various interstate routes within the following counties. Livingston County Grundy County 1. Interstate Route 55 1. Interstate Route 55

Post Date: 06/02/2026 Bid Date: 06/12/2026 Trades: *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, Litter & Trash Pickup & Road & Sidewalk Sweeping: Branch & Leaf Collection & Disposal: On-Call & Regular Services, Cleanup Contractor: Debris Removal, Obstruction Hauling, Building/Grounds/Structures/Water - Demolition & Hauling
#827123

Litter picking on interstate I-57, throughout Ford, Iroquois, and Kankakee Counties. , Springfield, IL

This work consists of removing and disposing of Litter and Debris that has accumulated within the right-of-way of the Interstate Routes, including, but not limited to, medians; inside and outside areas adjacent to exit and entrance ramps at various interchanges; interchange gore areas between mainline and ramps; and inside and outside of on/off ramps at rest areas within District 3. Location: This project is located on various interstate routes within the following counties. Ford County Iroquois County Kankakee County 1. Interstate Route 57 1. Interstate Route 57 1. Interstate Route 57

Post Date: 06/02/2026 Bid Date: 06/12/2026 Trades: *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, Litter & Trash Pickup & Road & Sidewalk Sweeping: Branch & Leaf Collection & Disposal: On-Call & Regular Services, Cleanup Contractor: Debris Removal, Obstruction Hauling, Building/Grounds/Structures/Water - Demolition & Hauling
#827125

Class B Patching at the Concrete Section of FAP 603 (US 52) over I-39 - LaSalle County, Springfield, IL

This work consists of Class B pavement patching along US 52 and all the ramps. Location: This project is located at the concrete section of FAP 603 (US 52) over I-39 beginning 0.47 mile west of I-39 (Station 191+44) and ending at 0.35 mile east of I-39 (Station 234+23) in LaSalle County. The entrance and exit ramps at the interchange are included as well.

Post Date: 06/02/2026 Bid Date: 06/12/2026 Trades: *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, Earthwork & Paving Contractor: Pavement Preservation, Resurface, Slurry Seal, High Friction, Milling, Land Clearing, Trails/Path
#827127

Tree Removal Various Routes District 3 , Springfield, IL

This project consists of the removal and proper disposal of medium trees (6-15 inches in diameter) and large trees (greater than 15 inches in diameter), clearing of undesirable brush, and the maintenance of old growth oak trees. Approximate tree locations are shown on the plans. The work at each location consists primarily of: Three Rivers Rest Area on Westbound I-80 Traffic Control. The application of Paclobutrazol. Structural pruning. Disposal of pruned limbs including wood chips, leaves and other debris. Repair of any rutting caused by maintenance activities. All Other Locations Traffic Control. Cutting and removal of identified trees. Disposal of trees including wood chips. Application of herbicide to cut stumps by an Illinois Licensed Pesticide Applicator/Operator. Removal of stumps as per the Engineer. Repair of any rutting caused by tree removal activities. Location: The work to be done under this contract will be performed on State-maintained routes in Bureau, Grundy, Livingston, and LaSalle Counties. The operation will be performed within IDOT right-ofway.

Post Date: 06/02/2026 Bid Date: 06/12/2026 Trades: Tree Service Contractor: Planting/Trimming/Pruning Trees, Tree Felling, Stump Removal, Stump Grinding, Hydro-Ax Services
#827129

Replacement of Traffic Signal Heads and Vehicle Detection at various locations in Peoria, East Peoria, Washington, and Monmouth in Peoria, Tazewell, and Warren Counties. , Springfield, IL

This project consists of installing traffic signal heads, backplates, electric cables, traffic signal cabinet modifications, video vehicle detection systems and all related collateral work necessary to complete the improvements on this project. Location: This project is located along various routes at various locations in Peoria, Tazewell, and Warren Counties.

Post Date: 06/02/2026 Bid Date: 06/12/2026 Trades: *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, Traffic Signals, Calming, Intelligent Transportation (ITS): Automated Enforcement Systems (AES) & Speed Traffic Recorders (TMS)
#827131

HMA patching on US 24 and Resurfacing (1,000 ft) rest area roadway in Fulton County, Springfield, IL

This project consists of correction of the superelevation on the US Route 24 curve east of N. Speedway Road and paving improvements to the Rest Area west of Little America Lane. Work on US Route 24 consists of variable depth milling, a variable depth hot-mix asphalt overlay, shoulder improvements, guardrail work, and all related collateral work necessary to complete the project as shown in the contract plans as described herein. Work on the rest area consists of variable depth milling, pavement widening, a hot-mix asphalt overlay, shoulder improvements, and all related collateral work necessary to complete the project as shown in the contract plans as described herein. Location: This project is located on US Route 24 (FAP 317) in Fulton County, Illinois. The job begins approximately 1.1 miles southwest of the intersection of US Route 24 (FAP 317A) and Old Weaver Highway to the Rest Area west of Little America Lane.

Post Date: 06/02/2026 Bid Date: 06/12/2026 Trades: *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, Earthwork & Paving Contractor: Pavement Preservation, Resurface, Slurry Seal, High Friction, Milling, Land Clearing, Trails/Path
#827132

HMA Patching on Morton Ave from north of Clark St to Jackson St (US 150) in Morton, Springfield, IL

This project consists of hot-mix asphalt partial depth patching and modified urethane pavement markings on Morton Avenue and all related collateral work necessary to complete the project as shown in the contract plans as described herein. Location: This project is located on Morton Avenue (FAU 6729) in Morton, Illinois in Tazewell County. The job begins at the intersection of Clark Street to West Jackson Street (US Route 150).

Post Date: 06/02/2026 Bid Date: 06/12/2026 Trades: *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, Earthwork & Paving Contractor: Pavement Preservation, Resurface, Slurry Seal, High Friction, Milling, Land Clearing, Trails/Path
#827133

Partial and full depth patching on IL 93 from IL 91 (S) to IL 40 in Stark County, Springfield, IL

The work on this project consists of partial depth HMA milling and patching at various locations along the longitudinal joint and within the travel lanes. The project also includes all incidental and collateral work necessary to complete the work in the above-described Section according to the plans, specifications and special provisions. Location: The proposed repair project is located on Illinois Route 93 between Illinois Route 91 to Illinois Route 40 passing through Elmira, Illinois in Stark County. The project length is 50,360 feet (9.54 miles).

Post Date: 06/02/2026 Bid Date: 06/12/2026 Trades: *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, Earthwork & Paving Contractor: Pavement Preservation, Resurface, Slurry Seal, High Friction, Milling, Land Clearing, Trails/Path
#827135

Paving and Parking Lot Improvements - Bloomington, Leroy, and Towanda in McLean County, Springfield, IL

The project consists of paving and parking lot improvements at three (3) McLean County IDOT storage facilities located in Bloomington, Leroy, and Towanda. The work includes paving over existing HMA and aggregate surfaces, painting dedicated parking stalls, and any other work necessary to complete the project. Location: The project is located at: 2621 S Veterans Parkway Bloomington, IL 61701 (Bloomington Site), 501 S East Street Leroy, IL 61752 (Leroy Site), and 203 Old U.S. Route 66 Towanda, IL 61776 (Towanda Site).

Post Date: 06/02/2026 Bid Date: 06/12/2026 Trades: *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, Earthwork & Paving Contractor: Pavement Preservation, Resurface, Slurry Seal, High Friction, Milling, Land Clearing, Trails/Path
#827137

1.18 miles of Patching and Chip Seal A-1 (Fog Seal), Ford Harris Rd to Hensley Rd north of Champaign, Springfield, IL

The work on this project shall consist of the following: 1. Traffic Control Setup 2. Class D Patching 3. HMA Surface Removal 4. HMA Resurfacing 5. Bituminous Materials (Tack Coat) 6. Application of A1 Bituminous Surface Treatment with Fog Seal 7. Pavement Markings 8. Clean up. Location: Ford Harris Rd to Hensley Rd north of Champaign

Post Date: 06/02/2026 Bid Date: 06/12/2026 Trades: *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, Earthwork & Paving Contractor: Pavement Preservation, Resurface, Slurry Seal, High Friction, Milling, Land Clearing, Trails/Path, Bituminous Concrete
#827139

Wing Wall Repair at Kickapoo Pond 0.2 mi west of Skykine Dr. west of Tilton. , Springfield, IL

The intent of this project is to perform wingwall repairs to S.N. 092-8600. Appropriate measures shall be taken by the Contractor to preserve the surrounding environment and to provide maximum protection to the public while minimizing its disruption and inconvenience. S.N. 092-8600 1. Place helical ground anchors at the North & South wingwalls, 2. Perform structural steel repairs at the North & South wingwalls.

Post Date: 06/02/2026 Bid Date: 06/12/2026 Trades: *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
#827141

Bridge Repairs, Deck Repairs and Joint Replacement/Repairs on SN 061-0077 carrying US 51 over IC Railroad. , Springfield, IL

The project consists of bridge deck repairs, bridge repairs, bridge joint replacement, excavating and grading shoulders, shoulder widening, maintenance of traffic, and all incidental and collateral work necessary to complete the project as shown on the plans and as described herein. Location: This project is located on US 51 over ICRR, north of Central City. The project is located in Marion County.

Post Date: 06/02/2026 Bid Date: 06/12/2026 Trades: *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, Highway, Roadways, Bridge, Railroad, Airport Construction, Maintenance & Repair: Horizontal Construction, Excavating, Grading and Oil Surfacing
#827143

Highway Lighting and Traffic Signal Maintenance at Various Locations throughout District 8. , Springfield, IL

This project will provide operable and properly maintained highway lighting and traffic signal repair and maintenance in District 8. Location: This project is located at various locations in District 8.

Post Date: 06/02/2026 Bid Date: 06/12/2026 Trades: *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, Traffic Signals, Calming, Intelligent Transportation (ITS): Automated Enforcement Systems (AES) & Speed Traffic Recorders (TMS), High Voltage Electrical Contractor (HVE): Electrician, Power Lines; Substation, Switchgear, Transmission/Power Lines
#827145

13 miles of Pavement Patching on IL 140 from Hamel to Alhambra and on IL 4 from IL 143 to south of US 40. , Springfield, IL

This project consists of full-depth and partial-depth patching and all collateral work necessary to complete the project as shown on the plans and as specified in these special provisions. Location: This project is located on IL 140 from Hamel to Alhambra and IL 4 from 143 to south of US 40.

Post Date: 06/02/2026 Bid Date: 06/12/2026 Trades: *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, Earthwork & Paving Contractor: Pavement Preservation, Resurface, Slurry Seal, High Friction, Milling, Land Clearing, Trails/Path
#827146

Repairs to SN 097-0062 carrying US 45 over Skillet Fork Creek, 0.8 miles south of Mill Shoals. , Springfield, IL

The proposed improvements consist of joint replacement with strip seals, bridge deck and substructure repair, and bearing cleaning and painting. Location: This project is located on SN 097-0062 carrying US 45 over Skillet Fork Creek. 0.8 miles south of Mill Shoals.

Post Date: 06/02/2026 Bid Date: 06/12/2026 Trades: *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, Highway, Roadways, Bridge, Railroad, Airport Construction, Maintenance & Repair: Horizontal Construction