Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

Browse all Illinois

#823492

HMA Resurfacing of North 36th St., Adams County, IL

The work on this section shall consists of milling and resurfacing North 36th Street (Co Hwy 15) with 1 HMA Binder Course and Polymerized 1 HMA Surface Course. Additional work includes pavement patching, longitudinal joint sealant, pavement markings, inlet lid replacement, and other ancillary work. The work begins on North 36th Street at Sta. 100+00 (84 Ft South of Wavering Park Road) then proceeding northerly to Sta. 139+20 (78 Ft South of Wisman Lane).
Post Date: 05/11/2026 Bid Date: 06/12/2026 Trades: *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
#823493

Construction of PCC Sidewalk with ADA Compliance, Pana, IL

The work in this contract consists of furnishing all equipment, labor, and materials necessary to construct a 5 to 6-foot-wide concrete sidewalk with ADA compliances from Pana Junior High School to Residential Areas in the City of Pana, Christian County, Illinois. Included in the work is earth excavation, proposed sidewalk, detectable warning panel, erosion control, seeding, driveway pavement, curb and gutter, and all other incidental work required to complete the project.

Post Date: 05/11/2026 Bid Date: 06/12/2026 Trades: *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, Concrete Contractor: Pavement, Driveways, Sidewalks, Curbs, Gutters, Flatwork, ADA Ramps Pedestrian Improvements, CIP Concrete
#823495

Full-Depth Reclamation with Soil Cement Base, Scott County, IL

This project shall consist of full-depth reclamation, 10 with cement, surface profiling, and construction of a bituminous surface treatment on County Highway 14 from approximately 1,300 feet north of Walnut Creek to Interstate 72.

Post Date: 05/11/2026 Bid Date: 06/12/2026 Trades: *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
#823496

Micro Surfacing on Ferris Road, Hancock County, IL

The proposed work for this section shall consist of the placement of Microsurfacing, Rut Filling, Microsurfacing, Single Pass, and all other work necessary to complete the improvement in accordance with the plans as specified herein. This project is located on County Highway 29 (FAS Route 425, Ferris Road) near Ferris, IL.

Post Date: 05/11/2026 Bid Date: 06/12/2026 Trades: *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
#823500

Reconstructing the I-57 and IL 16 Interchange, Coles County, IL

This project consists of reconstructing the interchange configuration from a cloverleaf to a raindrop diamond. The reconstruction includes the removal and replacement of the I-57 structures over IL 16, removal of the I-57 structures over the Lincoln Prairie Grass Trail, and replacement of those structures with a cast-in-place box culvert. Additional work includes pavement patching, milling, HMA resurfacing, HMA pavement (full-depth), PCC pavement, shoulders, curb and gutter, PCC sidewalk, medians, storm sewer, pipe culverts, precast box culverts, guardrail, guardrail shoulder stabilization, pavement marking, signs, pavement removal, paved shoulder removal, drainage structure removals, earth excavation, seeding, and any other work necessary to complete this section. This project is located on I-57 at the I-57 interchange with IL 16, east of Mattoon in Coles County. Work on I-57 begins 0.5 miles south of IL 16 and continues to 1 mile north of IL 16. Work on IL 16 begins just east of Swords Dr. and ends just west of Lerna Road.

Post Date: 05/11/2026 Bid Date: 06/12/2026 Trades: *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
#823501

Replacement of 2 Structures Carrying I-72 over IL 121 and the IC Railroad, Decatur, IL

This project consists of removing and replacing the existing structures utilizing stage construction, HMA resurfacing, earthwork, guardrail and traffic barrier terminals, pavement marking, seeding, and any other work necessary to complete this section. This project is located at existing SN 058-0074 and SN 058-0075 that carries I-72 over IL 121 & CN/ICRR on the northwest edge of Decatur, IL.

Post Date: 05/11/2026 Bid Date: 06/12/2026 Trades: *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
#823502

Bridge Replacement on US 36/IL 121 over Lake Shore Drive, Decatur, IL

This project includes complete replacement of SN 058-0019, bridge approaches, wingwalls, pavement removal, PCC pavement, concrete stairs, sidewalk replacement, curb and gutter replacement, storm sewer removal and installation, drainage structure removal and installation, median replacement, guardrail replacement, fence installation, pavement marking, and all other work necessary to complete the project. This project is located on US 36/IL 121 over Lake Shore Drive within the City of Decatur in Macon County.

Post Date: 05/11/2026 Bid Date: 06/12/2026 Trades: *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, Highway, Roadways, Bridge, Railroad, Airport Construction, Maintenance & Repair: Horizontal Construction
#823503

17.5 Miles of Resurfacing on US 40, Marshall, IL

This work consists of pavement patching, milling, HMA resurfacing, HMA and aggregate shoulders, guardrail replacement, pavement marking, and any other work necessary to complete this section. This project is located on US 40 from IL 49 in Casey to IL 1 in Marshall in Clark County

Post Date: 05/11/2026 Bid Date: 06/12/2026 Trades: *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
#823504

4.3 Miles of Patching, Milling and Resurfacing on US 51, Decatur, IL

This project consists of pavement patching, HMA surface removal, HMA resurfacing, HMA and aggregate wedge shoulders, pavement marking, and any other work necessary to complete this section. This project is located on US 51 in Macon County, from 0.8 miles south of US 36 to 0.3 miles east of US 51 Business south of Decatur.

Post Date: 05/11/2026 Bid Date: 06/12/2026 Trades: *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
#823506

Reconstruction of Intersections along US 40, Teutopolis, IL

The work in this contract consists of furnishing all equipment, labor, and materials necessary to reconstruct intersections along US Route 40 including 5-foot-wide concrete sidewalk with ADA compliances and 8 pavement replacement from Race Street to Wall Street in the Village of Teutopolis, Effingham County, Illinois. Included in the work is proposed sidewalk, detectable warning panel, curb and gutter, and all other incidental work required to complete the project.

Post Date: 05/11/2026 Bid Date: 06/12/2026 Trades: *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
#823507

Construction of Sidewalks from Kaskaskia College to Various Locations, Vandalia, IL

The work in this contract consists of furnishing all equipment, labor, and materials necessary to construct a 5-foot-wide concrete sidewalk with ADA compliances from Kaskaskia College to local residents in the City of Vandalia, Fayette County, Illinois. Included in the work is earth excavation, proposed sidewalk, erosion control, seeding, driveway pavement, culverts, storm sewer, Intersection Signalization, and all other incidental work required to complete the project

Post Date: 05/11/2026 Bid Date: 06/12/2026 Trades: *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
#823509

Full-Depth Pavement Reclamation with an A-2 Bituminous Surface Treatment on 1200E Road, Cumberland County, IL

Work in this section shall include the construction of a rehabilitated pavement structure of FAS 699 (CH 2) from the North edge of Toledo to 1050 N consisting of a Full-Depth Reclaimed Pavement, 12 Depth (with cement) with a final A-2 seal coat, construction of aggregate wedge shoulders, and miscellaneous items for completion of the project.

Post Date: 05/11/2026 Bid Date: 06/12/2026 Trades: *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
#823511

A-2 Bituminous Surface Treatment on CH 15, Shelby County, IL

This section consists of resurfacing the existing roadway with the application of Bituminous Materials (Cover and Seal Coats) and Seal Coat Aggregate using an A-2 Treatment. Seal Coat Aggregate to be CA-16 Cr. Stone, Class A or C (FINES LIMITED). Bituminous Materials to be HFRS-2P.

Post Date: 05/11/2026 Bid Date: 06/12/2026 Trades: *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
#823514

10.4 Miles of Bridge Repairs and Resurfacing on I-55/I-70/US 40, Madison County, IL

The proposed improvements consist of a SMART resurfacing of all lanes and shoulders in both directions of the interstate between the project limits. Patching and guardrail improvements within the project limits will also be performed. The bridges on SNs 060-0012 & 060-0013 will receive bridge joint replacements, bridge deck overlays, and approach pavement resurfacing. The work will be performed with nighttime lane closures and interstate directional closures for the staging. The project is located along I-55/I-70/US 40 near Collinsville, from 0.5 miles west of Black Lane to 0.4 miles east of IL 159; including ramps at Black Lane, IL 157, and IL 159, in Madison County. The bridge repairs are located along I-55/I-70/US40 over IL 157 on SNs 060-0012 and 060-0013. The net length of the project measures approximately 30,570 feet (5.79 miles) along the centerline of I-55/I-70/US 40.

Post Date: 05/11/2026 Bid Date: 06/12/2026 Trades: *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
#823515

6.5 Miles of Longitudinal Joint Repair on I-64, St. Clair & Clinton Counties, IL

This project consists of longitudinal joint repair. This project is located on I-64 from 0.5 miles west of IL 4 in Mascoutah to 0.3 miles east of the Clinton County line.

Post Date: 05/11/2026 Bid Date: 06/12/2026 Trades: *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
#823516

Resurfacing North Alby Street, Godfrey, IL

This project consists of PCC Patches, bituminous surface treatment A1, HMA resurfacing, ADA compliant curb ramps, removal and replacement of combination concrete curb and gutter, storm sewer lining and other incidental work required to complete the plans as proposed in the Village of Godfrey, Illinois.

Post Date: 05/11/2026 Bid Date: 06/12/2026 Trades: *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
#823519

Sidewalk Construction along Various Streets, Worden, IL

The project is located in the Village of Worden, Madison County, Illinois. The project is located along Park St., Wall St., Main St., and S. Lincoln St. for a total distance of 3163 feet (0.599 miles). Major items of work included in this project consist of removal and replacement of existing sidewalks and some minor ditch cleaning and/or culvert work for drainage.

Post Date: 05/11/2026 Bid Date: 06/12/2026 Trades: *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, Concrete Contractor: Pavement, Driveways, Sidewalks, Curbs, Gutters, Flatwork, ADA Ramps Pedestrian Improvements, CIP Concrete
#823520

Cold-in-Place Pavement Recycling on Bluff Road, Monroe County, IL

The proposed partial depth Cold-in-Place pavement recycling project is located on Bluff Road from just south of DD Road to approximately 2000 ft north of Hanover Road in Monroe County, Illinois. The project length is 26,228.38 feet (4.968 miles). The work on this project consists of cold-in-place recycled material resurfacing, milling, HMA surface courses, driveway and sideroad resurfacing, thermoplastic pavement markings, and all incidental and collateral work necessary to complete the work in the above-described Section according to the plans, specifications and special provisions.

Post Date: 05/11/2026 Bid Date: 06/12/2026 Trades: *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
#823521

Resurfacing Martin Luther King Jr. Drive, East St. Louis, IL

The proposed improvements consist of furnishing all labor, equipment, and materials to rehabilitate the pavement and construct pedestrian accommodations on a 0.433-mile section of Martin Luther King Drive (State St. to Columbia Pl.) in East St. Louis. The project consists of site related work, pavement patching, curb removal and replacement, HMA surfacing, driveway pavement reconstruction, and sidewalk and sidewalk ramp reconstruction to meet current ADA standards as well as other work according to the plans and these specifications.

Post Date: 05/11/2026 Bid Date: 06/12/2026 Trades: *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
#823522

Traffic Signal Installation at the Intersection of Horseshoe Lake Road and McDonough Lake Road, Collinsville, IL

The proposed traffic signal installation project is located at the intersection of Horseshoe Lake Road and McDonough Lake Road in Collinsville, Illinois. The project length is approximately 1,400 feet (0.265 miles). The work on this project consists of conduit and handhole installation, traffic signal foundations and post installations, traffic control cabinet installation, and interconnect cable installation and all incidental and collateral work necessary to complete the work in the above-described Section according to the plans, specifications and special provisions.

Post Date: 05/11/2026 Bid Date: 06/12/2026 Trades: *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, High Voltage Electrical Contractor (HVE): Electrician, Power Lines; Substation, Switchgear, Transmission/Power Lines