The Illinois Commerce Commission (ICC) is soliciting quotes from qualified Vendors to perform a comprehensive pre-acquisition building inspection, appraisal, and environmental due diligence review of the privately owned property commonly known as the Leland Building, located at 527 E. Capitol Avenue, Springfield, Illinois
Post Date: 05/10/2026Bid Date:05/14/2026Trades: *General Building Contractor GBC: Building Construction, Enclosed Structures; Opportunities for Subcontractors, Inspection Services, Inspector of Record (IOR) Services & Testing Laboratories - NAICS 541380
Fire Tower Replacement for McHenry County College IL
Post Date: 05/11/2026Bid Date:05/14/2026Trades: *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, Fire Protection: Fire Alarm, Smoke Detection & Fire Suppression Contractor, Fire Extinguishers, Pumps, Hydrants & Inspections
Carl Sandburg College seeks qualified contractors for facility improvement work at the Carthage campus. The project will address flooring repairs to improve safety, accessibility, and functionality while maintaining consistency with college standards. FLOORING IMPROVEMENTS Hallway Floor Repair: Inspect and repair existing sub-floor areas to ensure level and stable surfaces prior to new flooring installation. Flooring Replacement: Remove and dispose of existing flooring materials in repaired area. Install new commercial-grade flooring with proper adhesives, transition strips, and base molding in the repaired area. Material Standards: Flooring must be slip-resistant, easy to clean, and suitable for high-traffic educational environments.
Post Date: 05/11/2026Bid Date:05/14/2026Trades: *General Building Contractor GBC: Building Construction, Enclosed Structures; Opportunities for Subcontractors, Building Maintenance, Installation & Repair Services: General Appliance Repair, Make Ready, Minor Renovations & Repairs, Floor Covering and Flooring Contractor, Including Carpet, Wood, Marble, Tile, Ceramic, Linoleum, Vinyl
The City of Quincy is seeking Statements of Qualifications from engineering consultants for construction inspection (Phase III) services for various projects in the City of Quincy from June 1, 2026, to December 31, 2027. Projects and inspection services shall be funded with local (City) funds. It is expected the consultant shall be assigned 2-3 construction projects.
The City of Aurora is looking for qualified contractors for the construction of a new 7600 square foot asphalt parking lot which will provide overflow parking for the golf course at Phillips Park. The scope includes aggregate base, asphalt paving, curb and gutter/parking stops, pavement markings, and a small level spreader area with vegetated lip.
Post Date: 05/12/2026Bid Date:05/14/2026Trades: *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, Earthwork & Paving Contractor: Pavement Preservation, Resurface, Slurry Seal, High Friction, Milling, Land Clearing, Trails/Path, Concrete Contractor: Pavement, Driveways, Sidewalks, Curbs, Gutters, Flatwork, ADA Ramps Pedestrian Improvements, CIP Concrete, Pavement Marking, Traffic Striping, Raised Pavement Markers (RPMs) & Reflectors, Centerline Rumble Strips
Demolition of existing dried biosolids tubular drag conveyor, and installation of new tubular drag conveyors including associated equipment, structural elements, electrical work, instrumentation, and surface preparation. The project is located at Building 60 of the Des Plaines River Water Reclamation Facility at 800 Krause Dr. in Buffalo Grove Illinois.
Post Date: 05/12/2026Bid Date:05/14/2026Trades: *General Building Contractor GBC: Building Construction, Enclosed Structures; Opportunities for Subcontractors, Demolition Contractor, Building Removal and/or Relocation, Wrecking & Hauling, Building Maintenance, Installation & Repair Services: General Appliance Repair, Make Ready, Minor Renovations & Repairs, High Voltage Electrical Contractor (HVE): Electrician, Power Lines; Substation, Switchgear, Transmission/Power Lines
Total Small Business Set-Aside, 237990 - Other Heavy and Civil Engineering Construction. The work consists of the mobilization and demobilization of the contractor's forces and equipment necessary for performing the work required under the contract; clearing and grubbing and disposal of trees, snags, logs, brush, stumps, shrubs, and rubbish from the designated areas.
Post Date: 04/16/2026Bid Date:05/15/2026Trades: *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
The purpose of this exploration and analysis was to determine the various soil profile components, the engineering characteristics of the materials and to provide criteria for use by the design engineers in preparing the project plans and specifications. The scope of this exploration included a geological reconnaissance of the site, a review of previous soil investigations in the area, subsurface exploration, soil testing, laboratory testing and an engineering analysis and evaluation of the materials encountered.
To replace an existing lead water service line with a new water service line and perform any internal and/or external restoration work for up to one hundred and thirty-four (134) residential homes in the Village.
Post Date: 05/05/2026Bid Date:05/15/2026Trades: *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, Pipeline Contractor: Water Mains, Sewer Lines, Septic Lines; CIPP Pipe liners, Pipe Inspection, Video & Robotic Cameras
Prairie State College located in Chicago Heights Illinois, is looking to obtain proposals from janitorial cleaning service providers for approximately 415,000 square feet of cleanable space.
236220 - Commercial and Institutional Building Construction. TThis project consists of the repair and repurpose of Building 138, U.S. Army Garrison (USAG) - Rock Island Arsenal (RIA) for use as a parking garage for snow removal vehicles. The scope of the project includes the replacement of the existing 12,000 square foot (s.f.) concrete floor to allow for drainage of debris and moisture brought in by the vehicles. New man doors will be installed to provide egress as required by life safety building codes. A new coiling overhead door will replace the existing sliding wood door. Extensive exterior repairs will stabilize the masonry and provide a weather tight enclosure. The project also includes the installation of new mechanical ventilation equipment that will comply with current codes and electrical outlets to provide power as required for tenant use.
Post Date: 05/07/2026Bid Date:05/15/2026Trades: *General Building Contractor GBC: Building Construction, Enclosed Structures; Opportunities for Subcontractors
562998 - All Other Miscellaneous Waste Management Services. The services performed on the lift station shall either be general or confined space entry. General services does not require the contractor to physically enter the wet well, however the contractor shall be responsible for pumping out all liquid, oil, fuel, solids, grease, sand and miscellaneous debris from within the wet well, in addition to the removal of waste build up on the wet well walls.
These specifications cover furnishing, boring, drilling, pumping cementitious grout slurry and appurtenances for raising concrete slabs to their original joint lines and grade, and/or filling the void between the bottom of the existing concrete slab and the subgrade. The work described includes the furnishing of all materials, equipment, supplies and tools, the performance of all labor and services, and all incidentals necessary to complete the concrete slab raising and/or void filling under the concrete slab in a neat, substantial, and adequate manner. All areas raised shall be guaranteed against re-sinking of anything greater than for three years from date of completion.
Post Date: 05/08/2026Bid Date:05/15/2026Trades: *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, Concrete Repair & Restoration Services, including Gunnite & Grouting Contractor
Improvements include roughly 713 LF of 8" PVC Water main, Water Services, Fire Hydrants, Water main Encasement, HMA Driveway Removal and Replacement, HMA Pavement Removal and Replacement, Concrete Sidewalk Removal and Replacement, Curb Removal and Replacement, and Abandonment of Existing 8" Water Main.
Post Date: 05/10/2026Bid Date:05/15/2026Trades: *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, Pipeline Contractor: Water Mains, Sewer Lines, Septic Lines; CIPP Pipe liners, Pipe Inspection, Video & Robotic Cameras
Project includes edge mill and overlay of Bibury Dr, Sheridan Grove Dr, and Stanton Ave, along with curb replacement and inlet and manhole adjustments. Project includes earth excavation special, pavement patching, and aggregate wedge shoulder placement on 10th St.
Post Date: 05/10/2026Bid Date:05/15/2026Trades: *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, Earthwork & Paving Contractor: Pavement Preservation, Resurface, Slurry Seal, High Friction, Milling, Land Clearing, Trails/Path, Stormwater Drainage: Manholes & Valve Boxes, Ditches, Culverts, Shoulder Work, Grates, French Drains, Dewatering, Water Swales, Concrete Contractor: Pavement, Driveways, Sidewalks, Curbs, Gutters, Flatwork, ADA Ramps Pedestrian Improvements, CIP Concrete
This is a solicitation for a two (2) year contract for the maintenance and repair of LCN door closures on an as needed basis
Post Date: 05/12/2026Bid Date:05/15/2026Trades: *General Building Contractor GBC: Building Construction, Enclosed Structures; Opportunities for Subcontractors, Building Maintenance, Installation & Repair Services: General Appliance Repair, Make Ready, Minor Renovations & Repairs, Locksmith & Security Equipment Contractor: Access Control, Gate/Door Releases, Jail/Prison Locking, Intrusion Alarm Systems
The Village of Schaumburg is seeking to complete Phase I for Stage III of the North Meacham Road Corridor Streetscape (Southwest Quadrant) to advance the recommendations included in the North Meacham Road Corridor Plan. The goals of the North Meacham Road Corridor Plan aim to improve the Meacham Road right of way to create a transformative corridor that provides a multimodal environment and unifies the east and west sides of the 90 North District. Stage III of the streetscape improvements focuses on the west side of Meacham Road between Zurich Way and Interstate 90.
Post Date: 05/12/2026Bid Date:05/15/2026Trades: *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, *Landscaping Contractor & Groundskeeping, Xeriscaping, Hardscaping, Weed Control Grubbing Sodding Lawn Mowing Mulching, Road Improvements: Parking & Highway Improvements; Intersections, Roundabout, Median Construction - NAICS 237310
The existing facility, located at 338 N. Iowa in Villa Park, was originally constructed as a school in 1963. It was later repurposed as a recreation center for the Village of Villa Park, serving in that capacity until 2025. Following the Villages relocation, the building underwent minor renovations to accommodate its current use as a temporary fire station. As the facility was not originally designed for long-term fire service operations, it presents several limitations related to layout, building systems, and code compliance. The Village seeks to: Evaluate the current condition and overall suitability of the existing structure Identify both current and future operational needs Determine whether renovation, expansion, or a combination of both represents the most effective solution Develop a design that aligns with modern fire station standards, supports current operations, and allows for potential future expansion
Post Date: 05/07/2026Bid Date:05/18/2026Trades: *A&E Architecture & Engineering: Design Services, Consulting & Planning: Professional, EOR Services, Feasibility Study
To establish a one-year contract for hydrants, hydrant parts, repair sleeves, copper tubing, brass valves, and related materials for the Village of Addison's Water Department. The following specifications describe these requirements. All of the items listed will be purchased on an as needed basis in undetermined quantities. Contract prices shall be firm for a one-year period.
Post Date: 05/07/2026Bid Date:05/18/2026Trades: Fire Protection: Fire Alarm, Smoke Detection & Fire Suppression Contractor, Fire Extinguishers, Pumps, Hydrants & Inspections, Suppliers: Supplies/Rental/Delivery of Construction Related, Construction Dependent or Construction Equipment