The Texas Parks and Wildlife Department (TPWD) is soliciting bids for a qualified Contractor to perform exterior painting services on the stucco walls for the Park Complex Superintendents residence and shed at Devils River State Natural Area (Dan Hughes Unit) located in Val Verde County.
Post Date: 05/05/2026Bid Date:05/19/2026Trades: General Stucco Contractor, Painting Contractor: Exterior/Interior Finish, Decorating; Interior Wallpaper & Wall Coverings, *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
The Texas Parks and Wildlife Department (TPWD) is soliciting bids for a qualified Contractor to replace two existing 2HP pumps, the associated piping, and electrical control panel for the Managers residence at Village Creek State Park located in Hardin County, Texas.
Post Date: 05/05/2026Bid Date:05/19/2026Trades: Machinery and Pumps Contractor; Machinery Repair, Grapple Rebuilds, Motors & Variable Frequency Drives (VFD's), Pipeline Contractor: Water Mains, Sewer Lines, Septic Lines; CIPP Pipe liners, Pipe Inspection, Video & Robotic Cameras, Low Voltage Electrical Contractor (LVE) <91V: Electrician, Fiberoptic, Wire & Cabling, Telephone, Cable Television (TV)
Request for Proposals for Construction Manager-At-Risk Harmony Public Schools, a Texas open-enrollment charter school, is issuing a Request for Proposals for a Construction Manager-At-Risk to perform construction services on a project in San Antonio, Texas involving a ground up construction of a 58,149 square foot elementary school facility including parking lot, playgrounds and landscaping. Construction scope consists of but is not limited to concrete, drywall, glazing, finishes, roofing, electrical, mechanical, plumbing, landscaping, low voltage, and other related work as specified in the project documents.
Post Date: 05/05/2026Bid Date:05/19/2026Trades: *At Risk Construction Management CMaR: Owner's Representative Services NIGP 925-44
Harmony Public Schools (Owner) proposes the Construction of a 78,000 sq. ft two-story middle/high school building, located near 301 Blue Ridge Dr, Georgetown, TX 78626, to be used for a middle/high school education. The project scope of work includes a ground up construction of a 78,000 square foot two-story middle/high school facility including parking lot, sport field, and landscaping. Additionally, there is a public road construction aspect connecting Blue Ridge Dr. to FM1460. Construction scope consists of but is not limited to concrete, drywall, glazing, finishes, roofing, electrical, mechanical, plumbing, landscaping, low voltage and other related work as specified (#HPS2627-HSAGeorgetownPhase2-CMAR) and meeting any and all codes required.
Post Date: 05/05/2026Bid Date:05/19/2026Trades: *At Risk Construction Management CMaR: Owner's Representative Services NIGP 925-44
Harmony Public Schools (HPS), dba, West Texas, district open-enrollment charter schools, will be accepting competitive sealed proposals for Polyethylene Field Turf Play Surface installation project in West Texas districts. The project scope of work includes purchasing supplies, materials, equipment, and labor, approximately 35,000 sq ft Polyethylene Turf installation, adding drainage system, and grading turf area as specified in the project documents. (#HPS2026 West TX Field Turf Installation).
The work under these specifications shall include but not necessarily be limited to furnishing spun concrete pole structures for the Tabor Substation to Messer Transmission Line Project, including the additional hardware specified below for assembling accessories to the poles. The poles to be delivered at the structure stake locations or contractor laydown yard. It is the responsibility of the construction contractor to coordinate with the concrete pole manufacturer on the pole delivery date and location. Tabor substation: 3084 Tabor Road (FM 974) Bryan, TX
Post Date: 05/12/2026Bid Date:05/19/2026Trades: Pole Installation Repair Contractor, Poured Concrete / Polymer: Pier and Beam Foundation Contractor, Portland Cement Concrete, *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
Total Small Business Set-Aside, 561790 - Other Services to Buildings and Dwellings. The Government has a requirement for Ventilation Cleaning Services for Joint Base San Antonio (JBSA) Lackland, (San Antonio) TX.
The conclusions and recommendations contained in this report are based on our site visits to the project site and on the soil samples gathered from two borings (W-1 and W-2) performed by BEA on December 23, 2024. The borings were drilled along or within the proposed utility alignment and extended to a termination depth of approximately 10 feet below the existing ground surface elevations. We were requested to drill at two (2) locations deemed accessible to our truck-mounted drilling rig
Post Date: 05/13/2026Bid Date:05/19/2026Trades: Pipeline Contractor: Water Mains, Sewer Lines, Septic Lines; CIPP Pipe liners, Pipe Inspection, Video & Robotic Cameras, Excavation & Grading Contractor: Blasting, Boring, Trenching, Backfill, Digging, Filing, Drilling, Boring, & Blasting Contractor: Horizontal Directional Drilling (HDD), Other Earth Manipulation & Oil Field Work, *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
The project consists of extending the public 8-inch (8) sanitary sewer approximately 920 linear feet including four (4) sanitary sewer manholes and extending the public 8-inch (8) waterline approximately 1,950 linear feet including a road crossing in steel casing. The project is located along FM 2920 between TC Jester Blvd and Kuykendahl Rd in Bridgestone Municipal Utility District, within the City of Houston Extraterritorial Jurisdiction, Harris County Key Map 290-Q, 290-U and 209-V.
Post Date: 05/13/2026Bid Date:05/19/2026Trades: Pipeline Contractor: Water Mains, Sewer Lines, Septic Lines; CIPP Pipe liners, Pipe Inspection, Video & Robotic Cameras, Stormwater Drainage: Manholes & Valve Boxes, Ditches, Culverts, Shoulder Work, Grates, French Drains, Dewatering, Water Swales, Road Improvements: Parking & Highway Improvements; Intersections, Roundabout, Median Construction - NAICS 237310, Excavation & Grading Contractor: Blasting, Boring, Trenching, Backfill, Digging, Filing, *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
The project consists of reconstructing approximately 2115 linear feet of Rita Lane (Vicki Street to Ira Street). This includes reconstructing the existing asphalt roadway to a concrete section consisting of 6 reinforced concrete with 8 flexible base. This project also includes the installation of approximately 2880 linear feet of 68 water line, 2915 linear feet of reinforced concrete pipe of various sizes, and approximately 2875 linear feet of 612 sanitary sewer line. Additionally, this project includes ADA compliant sidewalks with curb ramps and driveways.
Post Date: 05/13/2026Bid Date:05/19/2026Trades: Earthwork & Paving Contractor: Pavement Preservation, Resurface, Slurry Seal, High Friction, Milling, Land Clearing, Trails/Path, Concrete Contractor: Pavement, Driveways, Sidewalks, Curbs, Gutters, Flatwork, ADA Ramps Pedestrian Improvements, CIP Concrete, Reinforcing Bar Contractor: Reinforcement Steel Contractor; Wire Mesh, Steel Mesh, Rebar, Rods, Pipeline Contractor: Water Mains, Sewer Lines, Septic Lines; CIPP Pipe liners, Pipe Inspection, Video & Robotic Cameras, *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
Scope of Project: Rehabilitation or replacement of cathodic protection test stations located on existing North Fort Bend Water Authority water lines and at Bellaire Pump Station
Post Date: 05/13/2026Bid Date:05/19/2026Trades: Pipeline Contractor: Water Mains, Sewer Lines, Septic Lines; CIPP Pipe liners, Pipe Inspection, Video & Robotic Cameras, Stormwater Drainage: Manholes & Valve Boxes, Ditches, Culverts, Shoulder Work, Grates, French Drains, Dewatering, Water Swales, *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
Construction of Water, Sanitary, Drainage, and Paving Facilities in Two Step Farm Section 14, Two Step Farm Section 15, Two Step Farm Section 16, and Two Step Farm Section 19.
Post Date: 05/13/2026Bid Date:05/19/2026Trades: Pipeline Contractor: Water Mains, Sewer Lines, Septic Lines; CIPP Pipe liners, Pipe Inspection, Video & Robotic Cameras, Stormwater Drainage: Manholes & Valve Boxes, Ditches, Culverts, Shoulder Work, Grates, French Drains, Dewatering, Water Swales, Earthwork & Paving Contractor: Pavement Preservation, Resurface, Slurry Seal, High Friction, Milling, Land Clearing, Trails/Path, *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
In general, the Work consists of cleaning and rehabilitating the existing well, including video inspection and brushing, and replacing the existing well pump and motor at Owners Water Well No. 3.
Post Date: 05/13/2026Bid Date:05/19/2026Trades: Water Well Construction, Watershed Improvements & Water Tables Aquifer Storage, Drilling, Installation & Repairs, Pipeline Contractor: Water Mains, Sewer Lines, Septic Lines; CIPP Pipe liners, Pipe Inspection, Video & Robotic Cameras, Machinery and Pumps Contractor; Machinery Repair, Grapple Rebuilds, Motors & Variable Frequency Drives (VFD's), *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
The project includes rehabilitation of the existing asphalt roadway on Brazos Street from 9th Street to 7th Street by pulverizing, and overlaying. Approximately 700 L.F.
Post Date: 05/13/2026Bid Date:05/19/2026Trades: Earthwork & Paving Contractor: Pavement Preservation, Resurface, Slurry Seal, High Friction, Milling, Land Clearing, Trails/Path, Road Improvements: Parking & Highway Improvements; Intersections, Roundabout, Median Construction - NAICS 237310, *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
The conclusions and recommendations contained in this report are based on two (2) soil borings (W-1 and W-2) performed by BEA on October 30 and 31, 2025. The borings were drilled within the footprint of the proposed elevated water storage tank and extended to a termination depth of 75 feet below existing grade.
Post Date: 05/13/2026Bid Date:05/19/2026Trades: Excavation & Grading Contractor: Blasting, Boring, Trenching, Backfill, Digging, Filing, Drilling, Boring, & Blasting Contractor: Horizontal Directional Drilling (HDD), Other Earth Manipulation & Oil Field Work, Tank & Silo Construction & Controls, Maintenance, Inspections, Repair & Cleaning, Pressure Washing, *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors