Audubons Shearwater Way PH. II C&G, G, WSD&P, New Caney, TX
Scope of Work of the Contract Documents includes the following: Construction of Clearing, Grubbing, Grading, Water, Sanitary, Drainage and Paving Facilities.
Need an account?
Remembered your password?
Already have an account?
Scope of Work of the Contract Documents includes the following: Construction of Clearing, Grubbing, Grading, Water, Sanitary, Drainage and Paving Facilities.
Scope of Work of the Contract Documents includes the following: Lake Eloise Dam Improvements.
Work of the project generally consists of all work, labor, equipment, personnel, and materials necessary to complete the requirements of the project as described in the Specifications and as shown in the Drawings. This work includes, but is not limited to, installation of a lift station and valve vault, cloth media disk filter, secondary clarifier, chlorine contact basin, various concrete boxes, associated mechanical equipment, yard piping and valves, trench and excavation safety, and all appurtenances in accordance with the Contract Documents for the project.
Base Bid: Installation and replacement of 1,525 SY ADA compliant concrete pedestrian sidewalk with 24 ADA ramps. Project includes revised parking for ADA compliant spaces and drainage conveyance.
SCADA System Replacement.
Rehabilitation of the existing 48-in CMP using Cure in Place Pipe (CIPP) method. Including removal and replacement of existing inlets.
Furnishing all labor, material and equipment, and performing all work required for construction of approximately five thousand seventy-seven (5,177) 1-inch single service water lines, twenty-five (25) 1 -inch single service waterlines, and seventy-six (76) 2-inch single service water lines, together with all necessary appurtenances, by using a trenchless installation method (directional drilling, pipe bursting, or push/pull insertion) without open-cutting the roadway or driveway. Service lines shall be classified as either short service lines or long service lines. A short service line shall mean an existing service line connecting to the water meter that is located on the same side of the street as the water main. A long service line shall mean an existing service line connecting to the water meter that is located on the opposite side of the street from the water main.
Water, Sewer, Drainage, and Paving Improvements for Ryehill Section 5.
Utility Improvements for Rivina Lift Station & Offsite Force Main and Gravity Main.
The Project includes the following Work: Installation of a new 400,000 gallon elevated storage tank including all necessary site, tank foundation, logo, yard piping, and electrical work. Alternate bid includes installation of a 500,000 gallon elevated storage tank.
Construction of The Woodlands Trade Center Lift Station.