2026 MFT - Sheffield IL - Construction of Bituminous Surface of Various Streets, Peru, IL
This work shall consist of constructing bituminous surface treatment (A-1) on various streets within the Village of Sheffield.
Need an account?
Remembered your password?
Already have an account?
This work shall consist of constructing bituminous surface treatment (A-1) on various streets within the Village of Sheffield.
The intent of this Invitation for Bid is to enable the Village of Schaumburg's Department of Engineering and Public Works to establish relationships with vendors for Streetlight Painting Program
Project Objectives Install new electrical meters at selected main distribution and branch panel locations. Provide real-time monitoring of electrical usage, demand, voltage, amperage, power factor, harmonics, and related system data. Connect meters through the required wiring, cabling, network, and communication infrastructure. Provide power monitoring software capable of collecting, displaying, storing, and reporting electrical data. Update electrical one-line diagrams to better reflect current campus electrical infrastructure.
Supplying fuel for transportation purposes for the school district. The bidder must be able to provide the District with both a diesel tank (1,000 gallon minimum) and gasoline tank (1,500 gallon minimum) and a monitoring system will be necessary for tracking price per gallon, gallons used, time frame, and employee usage.
Single Axle Dump Truck W/Hydraulic Powered Loader Specification T74-60-25 D1 May 2026***Deliver to: Rafael Gomez 4051 N. Harlem Ave. Chicago, Illinois 60634
Coverdill - 1619 27th Avenue. Moline, IL - Carpentry, Flooring, Framing, Finishing, and Painting Contracting Services
Miller - 2610 4th Street. Moline, IL - Plumbing and Waterwork: Equipment, Instruments, Machinery, Fixtures, Pipe, and Supplies
Hamilton - 1174 26th Street A. Moline, IL - Roofing: Contractor, Equipment, Materials, and Supplies
Total Small Business Set-Aside, 238150 - Glass and Glazing Contractors. Lincoln Home National Historic Site-Replace Automatic Glass Doors at Visitor Center
All work for the demolition and renovation construction work required to complete this project will be paid for at the contract lump sum cost. The lump sum cost shall constitute full compensation for all labor, materials, equipment, and incidentals necessary to complete this work as specified.
To establish a contract for 5 Day Janitorial L6765, 406 Avenue C, Sterling, IL 61081
To establish a contract for 5 Day Janitorial L6460, 2517 W. 9th St. Mount Carmel, Illinois 62863
Blnket contract for 12 months and/or until contract monetary limit, whichever is applicable first, to remove and replace floor tile in public housing hi-rise units.
To establish Joint Purchase Master Contracts for plumbing repair and maintenance for State agencies by regions. This solicitation will be awarding Region 1 in the Northeast Territory up to Secondary and Tertiary Vendors.
Establish Joint Purchase Master Contracts for plumbing repair and maintenance for State agencies by regions. This solicitation will be awarding Regions 8, 9, and 10 in the South Territory. BEP associated w/Region 8 ONLY.
Establish Joint Purchase Master Contracts for plumbing repair and maintenance for State agencies by regions. This solicitation will be awarding Region 3 in the North Territory up to Secondary and Tertiary Vendors.
Work includes Hot-Mix Asphalt resurfacing of Various Streets including HMA Surface Removal (Cold Milling), HMA Binder Course, Bituminous Hot Mix Sand Seal, Manhole Adjustments and related items.
This work shall consist of constructing bituminous surface treatment (A-1) on various streets within the Village of Bureau Junction. Limits are as shown on the enclosed map and as detailed in the Municipal Maintenance Operations sheet.
The proposed project includes the removal and replacement of existing sidewalk along Hill Street and North Commerce Street, installation of new curb and gutter at the intersection of Hill Street and Campbell Street, and construction of additional curb and gutter with associated storm sewer improvements, including drainage structures and piping, along Hill Street between Hickory Street and Maple Street.
This project in general (approximately 13,383 linear feet in length) includes but is not limited to furnishing all labor, materials, equipment and other as included items necessary for the completion of the following approximate quantities: 2,070 SY of Hot-Mix Asphalt Partial Depth Patching, 890 CY of Undercuts, 620 SY of Class D Patches, 7 Inch, 1,530 SY of Class D Patches, 10 Inch 48,665 SY of Hot-Mix Asphalt Milling, 745 SY of Pavement Removal, 6,875 tons of Hot-Mix Asphalt Binder Course, 4,860 tons of Hot-Mix Asphalt Surface Course, 3,522 FT of Concrete Curb & Gutter Removal & Replacement, 44,983 SF of Sidewalk Removal & Replacement, 144 Structures To Be Adjusted or Reconstructed, 460 LF of New Storm Sewer Installation, 11,384 LF of Thermoplastic Pavement Markings, 4,430 SY of Landscape Restoration, 5 New Street Lights, 230 LF of Detector Loop Replacement and other miscellaneous items of work in accordance with the Contract Plans and Specifications.