Browse all Florida
Eastwind's Apartments Water Main Upgrades, Key West, FL
Florida Keys Aqueduct Authority is accepting bids for the Eastwind's Apartments Water Main Upgrades
**New Bid Date: Athletic Court Resurfacing & Striping Services, Brevard County, FL
Emergency Debris Removal, Reduction and Recovery, Ormond Beach, FL
Police Department Kennel, Coconut Creek, FL
The City of Coconut Creek, Florida is soliciting bids from qualified, experienced, and licensed General Contractors for a new story of the Police Department Kennel, located at 4800 West Copans Road, Coconut Creek, Florida 33063, within the Police compound facility. The work shall be performed in full accordance with the plans, specifications, terms, and conditions contained in this Invitation for Bids (IFB).
Crystal River Airport - Airfield Lighting Replacement, Lecanto, FL
Citrus County, Florida (County) invites interested parties to submit a Bid for airfield lighting and navigational aid improvements at Crystal River Airport. The project includes the removal and replacement of Runway End Identifier Lights (REILs) on both ends of Runway 9-27, removal and replacement of runway edge lighting on Runway 9-27, and removal and replacement of Taxiway A edge lighting.
Work also includes associated electrical infrastructure upgrades such as cabling, connectors, transformers, regulators, light bases, and related components necessary to provide a complete and operational lighting system. The County reserves the right to authorize additional fixture or electrical component replacements if field conditions warrant.
The project is funded by the State of Florida Department of Transportation (FDOT) and the County and is structured into three bid schedules to allow flexibility based on available funding and proposed bid pricing. The County reserves the right to award one or multiple bid schedules to apparent low bidder(s) based on available funding and best interest of the County.
Country Club of Miami - HVAC System Replacement, Miami, FL
EXPERIENCE REQUIREMENT: Bidder or Bidders Subcontractor shall have completed at least two (2) projects of similar size and scope; in lieu of the references from the Bidder or Bidders Subcontractor, the County will consider the references from Bidders key personnel in accordance with Resolution No. R-1122- 21. Bidder shall provide evidence of this experience; project names; dollar values and contract information for verification purposes. The experience of the bidding or proposing Contractors key personnel will be considered in assessing the Contractors experience. This information should be entered on form 00450 Bidder''s Statement of Qualifications and Business References, highlighting at least two comparable projects and using additional pages as needed. SCOPE OF WORK: (Contractor must obtain and submit all permits prior to performing any work.) CONTRACTOR shall review all documents, specifications, and scope of work provided by MiamiDade County Parks, Recreation, and Open Spaces Department for work to be completed. Furnish all labor, equipment, and materials required to comply with the intent of the WORK described in the contract documents including but not limited to: 1.1 The CONTRACTOR shall provide all labor, materials, tools, equipment, supervision, and services necessary for the Complete Renovation of the Country Club of Miami Golf HVAC System Replacement. 1.2 Prior to bidding, the contractor shall perform a site visit to become familiar with existing conditions, verify measurements, and review all areas in accordance with RPQ documents, drawings, and provided submittals. 1.3 Prior to submitting bid, contractor shall be required to visit site and become familiar with all areas and requirements per scope of work required in RPQ and shop drawings/attachments provided by owner as reference only to complete required documents for permitting project. Contractor shall be required/responsible to complete on site measurements as applies for submission per building code for permitting as per shop drawing/attachments by owner as reference only. All costs shall be included in the Contractors bid; drawings shall be submitted to owner for review prior to submission for permitting. 1.4 Replace all HVAC components as per original drawings and design provided by owner, including Chiller, Air Handler Units, Ductwork, Griller and dampers, Chilled Water Piping, Exhaust fans, Heaters, Pumps, Insulation, and controls. 1.5 General Requirements include all required permits, permit fees, bond and necessary documentation to complete the scope of work according to the latest Florida Building Code and local regulations 1.6 Project schedule is to be provided at Pre-Construction Meeting. Project duration to be (1) Year from NTP Date. Project phasing shall be in coordination with current building renovation contractor, HVAC contractor shall coordinate removal/new installation of all ductwork with renovation contractor as applies with ceiling demolition and new installation to include required inspections. 1.7 Work under this contract referenced below shall include, but is not limited to: Provide Submittals for all products used to include, but not limited to: CHILLER SYSTEM, PUMPS, AIR HANDLER UNITS, DUCTWORK SYSTEM, ELECTRIC DUCT HEATERS, ADDITIONAL EQUIPMENT General Scope of Work CHILLER SYSTEM Replacement of Existing Air-Cooled Chiller CH-1 and Chilled Water Accessories including valves, thermometers, gauges, piping and insulation with metal jacketing for exterior piping. Replacement of the associated chilled water piping system, two chilled water pumps, one expansion tank, one air separator, one pot feeder, thermometers and required valves and specialties. Replacement of (8) eight Air Handler Units and associated Ductwork and Chilled Water Piping. Replacement of all associated chilled water piping, together with required manual valves, electronic control valves with actuators, fittings, insulation, supports, and final operational testing. Replacement of all Associated Ductwork. Replacement of all associated grilles, dampers, smoke detectors, duct accessories, supports, and connections as required for a complete and operational system. Replacement of the associated electric duct heaters. Provide labor, materials, equipment, and supervision necessary to remove the existing belowwindow air conditioning unit and install one new replacement unit with a cooling capacity of approximately 6,800 BTU/Hr, including all required accessories, supports, connections, start-up, testing and disposal of the existing unit. Replacement of Exhaust Fans and Supply Fans. Provide labor, materials, equipment, and supervision necessary to remove all the existing exhaust and supply fans and furnish and install new replacement fans, including all required curbs, adapters, disconnects, backdraft dampers, bird screens, controls accessories, reconnections, supports, and start-up, as applicable to each fan location. Provide Pre and After Test and Balance Report for air and hydronics. Connect new equipment to the existing fire alarm system. Provide labor, materials, equipment, rigging, piping, valves, controls interface, start-up, and supervision necessary to remove the existing air-cooled chiller CH-1 and furnish and install one new JCI/York air-cooled chiller (e-coat factory applied/electro -deposited epoxy coating): (1) JCI/York Air-Cooled Chiller YLAA0100Z Equipment Summary: 9.98 EER, 16.6 IPLV R-454B Refrigerant 460V / 3Ph / 60Hz Shell and Tube Heat Exchanger Closed-cell Foam Insulated Suction Line DX Evaporator with High Efficiency Copper Tubes Air-cooled Condenser with Internally Enhanced Copper Tubes and Aluminum Alloy Fins Service Isolation Valves Totally Enclosed Air-Over (TEAO) Condenser Fan Motors Hermetic Scroll Compressors BACnet Interface Environment Guard Premium Louvered (Condenser Only) Enclosure Panels Evaporator 1 Double Thick Insulation BACnet Communication Gateway Elastomeric (Neoprene) Pad Vibration Isolators (Field Mounted) Designed, tested, and rated in accordance with ARI Standard 550/590 ASHRAE 90.1 Energy Efficiency Compliance Factory Assisted Startup Five (5) Year Parts and Labor Warranty Five (5) Year Compressor Parts Only Warranty Provide stand-alone controls for Chiller Replacement of the associated chilled water piping system, two chilled water pumps, one expansion tank, one air separator, one pot feeder, thermometers and required valves and specialties. PUMPS (2) Pumps Grundfos/PACO Pump 7.50 HP; 157 GPM @ 70 TDH Equipment Summary: Manufactured by Grundfos TEFC Motors 460V / 3Ph / 60Hz with VFD Field installed Cast Iron Construction Non-overloading Pump Curve Vertical Inline, split Coupled Accessories: Suction Diffuser Triple Duty Valve Expansion Tank Air Separator Provide stand-alone controls for pumps and VFDs
Terminal Apron Expansion, DeFuniak Springs, FL
The intent of the contract is to provide for construction and completion, in every detail, of the work described. It is further intended that the Contractor shall furnish all labor, materials, equipment, tools, transportation, and supplies required to complete the work in accordance with the plans, specifications, and terms of the contract.
Holden Ave Sidewalk Design, Orange, FL
Orange County, Florida, henceforth referred to as the County is accepting sealed bids for Holden Ave Sidewalk Design Project.
Fence Installation (Labelle), Hollywood, FL
The Housing Department of the Seminole Tribe of Florida is requesting bids from qualified contractors to provide fence installation services needed at 1566 East Winchester Avenue, Labelle, FL, 33935.
**Updated: New Bid Date: Commercial Solid Waste Hauling Services, Miami, FL
The City of Miami (hereinafter referred to as City) is seeking to qualify private commercial franchisee (herein referred to as Franchisee and/or Proposers) to enter into City-Wide Franchise Agreements (hereinafter referred to as Agreement) to provide collection and disposal of all commercial solid waste, bulky trash pickup, and recyclable materials, excluding biomedical, biological, and hazardous waste, to its commercial establishments and multifamily residences with four (4) or more contiguous living units.
Shoal River Ranch Water Storage Tank, Crestview, FL
The Board of County Commissioners of Okaloosa County, FL, are seeking a contractor to build the Shoal River Storage Tank, which will be a new 750,000 gallon fluted column (hydropillar) elevated potable water storage tank. The project location is northeast of the Shoal River Ranch Water Reclamation Facility, and construction will include the tank, the tank foundation and accessories, and all required site work.
**Updated** New Bid Date: Glamping Concession Services at Turtle Beach Campground, Sarasota, FL
Sarasota County (County), a political subdivision of the State of Florida, will receive proposals on the date indicated in OpenGov Procurement (OpenGov), the Countys electronic procurement portal, for the purpose of selecting a qualified Proposer to provide Sarasota County is seeking a qualified concessionaire to provide and manage glamping services at Turtle Beach Campground. Services include the setup, operation, and maintenance of a limited number of furnished campsites, guest services, and related amenities. Proposers are required to comply with Part II, Scope of Services.
Volusia County Backflow Devices Testing & Certification & Parts, Volusia County, FL
Replace Fuel Island And Tanks Project, Volusia County, FL
Exterior Maintenance Services Downtown Gainesville, Gainesville, FL
Contractor shall provide the following maintenance services: Litter and debris pick-up and disposal. Low pressure spraying down of sidewalks to remove undesirable or unsanitary materials. As needed spot sidewalk power washing; oil, gum, graffiti and miscellaneous stain removal. Other services as needed and upon mutual written agreement of the Contractor It will be the Contractors responsibility to meet all contract requirement in these specifications.
**Update: New Bid Date: SCRWTP Lime Softening Improvements - Blend Tank, Naples, FL
The Work consists of demolition and construction of the following items. All of which shall be constructed in accordance with the Drawings and Specifications: 1. Demolish and dispose of existing chemical blend tank including access hatches, internal baffles, weirs, stairway, ladders, handrails, coatings, liners, drains, penetrations, sample tabs, analyzers, chemical piping to the points of termination as indicated on the Drawings.
2. Provide and install new chemical blend tank, including yard piping and appurtenances. B. The work to be performed under this Contract shall consist of furnishing all tools, equipment, materials, supplies, and manufactured articles and for furnishing all transportation and services, including fuel, power, water, and essential communications, and for the performance of all labor, work, or other operations required for the fulfillment of the Contract in strict accordance with the Contract Documents. C. Implied and Normally Required Work: It is the intent of these Specifications to provide the County with complete operable systems, subsystems, and other items of Work. Any part or item of Work, which is reasonably implied or normally required to make each installation satisfactorily and completely operable, is deemed to be included in the Work and the Contract Amount. All miscellaneous appurtenances and other items of Work incidental to meeting the intent of these Specifications are included in the Work and the Contract Amount even though these appurtenances may not be specifically called for in these Specifications. D. Quality of Work: Regard the apparent silence of the Contract Documents as to any detail, or the apparent omission from them of a detailed description concerning any Work to be done and materials to be furnished as meaning that only the best general practice is to prevail and that only materials and workmanship of the best quality are to be used. Interpretation of these specifications will be made upon this basis. E. Except as specifically noted otherwise, provide and pay for: 1. Insurance and bonds. 2. Labor, materials, and equipment.
3. Tools, equipment, and machinery required for construction. Summary of Work 01_11_00-2 204170-10 April 2026 pw://Carollo/Documents/FL/Collier County/204170-100000/04 Design/04 Specs/Carollo/Blend Tank/01_11_00 (Bid Set)
4. Utilities required for construction.
5. Temporary facilities including sheeting and shoring.
6. Traffic control and dust control measures
7. Other facilities and services necessary for proper execution and completion of the Work.
Ground Application - Exotics Wetland & Veg Control (ERM), West Palm Beach, FL
CONTRACTOR shall provide ground crews to treat invasive and nuisance vegetation in COUNTY owned and managed lands, parks and right of ways. The CONTRACTOR shall be responsible for providing crews, equipment, herbicide and supplies for treating aquatic, wetland and terrestrial vegetation using ground application methods. CONTRACTOR shall provide services to COUNTY Departments including, but not limited to, Environmental Resources Management, Engineering & Public Works and Parks & Recreation. CONTRACTOR shall provide services at Zone 1, Zone 2, or Zones 1 and 2. (COUNTY to adjust based on award of the contract(s).
New Residential Home Builds (Tribal-wide), Hollywood, FL
The Residential Construction and Development Department (RCD) of the Seminole Tribe of Florida is soliciting Statements of Qualifications (SOQs) from qualified firms to pre-qualify multiple contractors in providing planning, design, and construction for infrastructure, site development, and home construction services for single-family and multi-family homes. The services will be performed for various residential construction projects located on some or all reservations, other restricted Tribal Trust Land, and certain fee property owned or leased by the Seminole Tribe of Florida in the State of Florida.
Professional Architectural Consulting Services, Quincy, FL
Architectural Services: Work in this category shall consist of all needed and requested architectural services for each project for which a task order is issued related to master planning, concept design and estimates for facilities development options, energy studies, sustainability improvements to existing facilities and energy efficient system, Green Globe, design of alternative energy systems, parks and recreation projects, facilities new construction, facilities retrofitting, facilities remodeling or rehab, forensic investigations, architectural design, interior remodeling design, landscape design, water intrusion studies, roof evaluation and repair, mechanical engineering, civil engineering, electrical engineering, structural engineering, acoustical engineering, building air quality control; project inspection, management and administration. Subcontractors: Each proposal shall include all known subcontractors, the services they will provide, and the anticipated percentage of services to be provided, e.g., surveying, landscaping, mapping, architecture, or other services. All subcontractors must be preapproved.
Counties in Florida
- Alachua (23)
- Baker (4)
- Bay (28)
- Bradford (2)
- Brevard (30)
- Broward (166)
- Charlotte (3)
- Citrus (6)
- Clay (10)
- Collier (16)
- Columbia (6)
- Desoto (1)
- Duval (19)
- Escambia (41)
- Flagler (5)
- Franklin (2)
- Gadsden (2)
- Gulf (6)
- Hamilton (2)
- Hardee (1)
- Hendry (1)
- Hernando (7)
- Highlands (4)
- Hillsborough (23)
- Holmes (1)
- Indian River (11)
- Jackson (1)
- Jefferson (4)
- Lafayette (2)
- Lake (11)
- Lee (24)
- Leon (21)
- Levy (1)
- Liberty (1)
- Manatee (4)
- Marion (14)
- Martin (4)
- Miami-Dade (131)
- Monroe (27)
- Nassau (4)
- Okaloosa (14)
- Okeechobee (9)
- Orange (2)
- Orange (52)
- Osceola (23)
- Palm Beach (124)
- Pasco (6)
- Pinellas (39)
- Polk (15)
- Putnam (3)
- Santa Rosa (3)
- Sarasota (28)
- Seminole (30)
- St. Johns (15)
- St. Lucie (19)
- Sumter (7)
- Taylor (2)
- Union (1)
- Volusia (40)
- Wakulla (2)
- Walton (1)
- Washington (2)