Northeast Transfer Station Facility Improvements Phase II - Compactors Bldg Tipping Floor Roof, Miami, FL
Project Description The purpose of the project is to construct a new steel roof deck above the compactors building tipping floor, modify existing steel joists to support additional wind loads, and repair the concrete corbel and masonry wall cracks. Work to be performed includes, but is not limited to, the following: 1. Corbel Repair Remove the steel travel beam for reuse Remove the existing corbel Add reinforcing steel Form and place new concrete 2. South Faade Crack Sealing Remove stucco in a limited area Rake joints in the existing Concrete Masonry Unit (CMU) faade using gouging tools Insert reinforcing steel and grout the joints Repair stucco and paint the affected area from corner to corner 3. Retrofit Existing Roof Structure Remove existing roofing materials Clean all framing Install new framing where noted Prime and paint steel Install the new roofing system Additional Information The Contractor shall coordinate with the Facility Supervisor and the Engineer of Record (EOR) to phase the work in a manner that minimizes impacts to facility operations, equipment, and vehicle circulation. Hours of operation will remain unaffected during construction. Work Restriction: Maintain uninterrupted truck access to the existing surge pit throughout construction. Provide phased construction sequencing to ensure continuous access.