The City of Goldsboro invites proposals from qualified general contractors having sufficient experience in the design and construction of inclusive playground systems to design and construct a playground at South End Park, 1900 S Slocumb St, Goldsboro, NC 27530.
Post Date: 05/23/2026Bid Date:06/18/2026Trades: *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, Prefabricated Buildings, Mobile Homes, Playgrounds, Trailers, Modular Units, Offices, Classrooms, Portable Toilets, Design/Build Contractor; Design/Bid/Build Entity (DBBE) or Design/Bid/Build (DBB)
The project generally consists of renovations and addition to Hauser Hall.
Post Date: 05/27/2026Bid Date:06/18/2026Trades: *General Building Contractor GBC: Building Construction, Enclosed Structures; Opportunities for Subcontractors
The Project includes the removal of approximately 750 L.F. of concrete channel in the Town of Mount Gilead, NC to facilitate a stream restoration in Stanback Park. The stream restoration will increase sinuosity and reduce the overall slope of the channel while improving the environment. The project also includes the replacement of an outdated pedestrian bridge at the park.
Post Date: 05/27/2026Bid Date:06/18/2026Trades: *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, Stormwater Drainage: Manholes & Valve Boxes, Ditches, Culverts, Shoulder Work, Grates, French Drains, Dewatering, Water Swales
The Wilbon Road Elevated Storage Tank and Upper Pressure Zone Development includes but is not limited to the following: 1. Construction of 1.0 MG Elevated Storage Tank 2. Construction of Water Line Connection for EST 3. Construction of Four Pressure Reducing Valve Vaults 4. Construction of Water Line from Judd Parkway to the Wilbon Road Booster Pump Station
Post Date: 05/28/2026Bid Date:06/18/2026Trades: *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, Tank & Silo Construction & Controls, Maintenance, Inspections, Repair & Cleaning, Pressure Washing
The contractor is to provide all required labor, tools, material and equipment for the replacement of the existing air handling units and energy recovery wheels.
Post Date: 05/29/2026Bid Date:06/18/2026Trades: HVAC Contractor: Heating Ventilating Air Conditioning & Controls, Duct Clean, Exhaust Systems, Air Handler/Air Chillers, RTU's
Seeking proposals for a turnkey delivery and installation of two (2) new mobile office units for the Old Charlotte Hwy. Campus, located at 1851 South Piedmont St., Monroe, NC 28110. Each unit should house seven (7) offices, two (2) of which are private and five (5) cubicle style, with (1) unisex restroom.
Post Date: 06/03/2026Bid Date:06/18/2026Trades: Prefabricated Buildings, Mobile Homes, Playgrounds, Trailers, Modular Units, Offices, Classrooms, Portable Toilets
The Town of Hope Mills is solicitinginformal bidsfor the repair and replacement of a failed retaining wall and asphalt trail section as well as storm drain improvements and concrete paving near Adcox Cemetery Street in Hope Mills, North Carolina.
Post Date: 06/05/2026Bid Date:06/18/2026Trades: *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
The selected consultant or engineering firm may be expected to provide services including, but not limited to: Existing system assessment and inventory Radio coverage and propagation studies Infrastructure inspection and condition assessment Communications system design and engineering Frequency coordination and FCC licensing support Tower and antenna system recommendations Equipment specifications and procurement assistance Bid document preparation Construction and installation oversight System testing, optimization, and acceptance Interoperability planning and implementation Training and transition support for county personnel Project management and grant compliance documentation
The Town of Huntersville is accepting statements of qualifications (SOQs) for consulting services to perform architectural, engineering and construction administration services for the new Vine Park Project. This park will be located on the lot at the northwest corner of the intersection of Gilead Road and Hwy 115. This site is to the south of the Downtown Greenway and to the east of 760 Craft Works. The Plan for the Park includes two jewel boxes with restroom, seating walls, lighted archways, a water feature with art piece, sidewalk connections to the trailhead, small performance shelter, upgraded sidewalks, bench swings, lawn area, picnic table areas, landscaping, site lighting and other park amenities.
Pitt CC will be relocating our various Public Service programs to space available at our Greenville Center location. Relocating in this facility empowers the programs to operate in a space specifically tailored for them. The building is approximately 27,105 square feet with existing floorplan (Exhibit A), Study preliminary floorplan (Exhibit B) as well as exterior faade upgrade (Exhibit C). Additional work will include painting and finishes in other areas of the building as identified during design. All design guidelines are to follow minimum requirements identified by NC Law Enforcement, Fire, and EMS Training requirements.
Post Date: 05/26/2026Bid Date:06/19/2026Trades: *A&E Architecture & Engineering: Design Services, Consulting & Planning: Professional, EOR Services, Feasibility Study, Design/Build Contractor; Design/Bid/Build Entity (DBBE) or Design/Bid/Build (DBB), *General Building Contractor GBC: Building Construction, Enclosed Structures; Opportunities for Subcontractors
Muter Construction/CT Wilson, a Joint-Venture Partnership, the CMAR for the Consolidation of NC DOA Office of the Secretary of State-Renovations, is seeking to pre-qualify subcontractors for the following bid packages: (BP01) General Trades; (BP02) Selective Demolition; (BP03) Cast-in-Place Concrete; (BP06) Architectural Wood Casework; (BP07) Sheet Waterproofing & Joint Sealants; (BP08A) Doors, Frames, Hardware Material + Installation; (BP08B) Glazing, Security Doors + Windows; (BP09A) Gypsum Board Assemblies; (BP09B) Acoustical Ceilings; (BP09C) Flooring; (BP09D) Painting; (BP10) Operable Partitions; (BP21) Fire Sprinkler; (BP23) HVAC; (BP26) Electrical; (BP31) Earthwork + Site Improvements.
Post Date: 05/27/2026Bid Date:06/19/2026Trades: *General Building Contractor GBC: Building Construction, Enclosed Structures; Opportunities for Subcontractors
Given that available funding does not cover the full scope of desired improvements, the project will be structured to prioritize critical exterior stabilization and restoration work, with additional elements to be included as funding permits. The base bid shall include all labor, materials, equipment, and supervision necessary to complete the following essential exterior improvements. ~ Stabilization and repair of the parapet, including structural reinforcement as required ~ Brick repointing and masonry repair in areas identified as critical to structural integrity and weatherproofing ~ Replacement and reinforcement of roof joists and replacement of the roof deck, to include new roof membrane, crickets, downspouts, roof hatch access, and coordination for future improvements such as mechanical curbs. Interior demolition as required to permit new work of base bid, including, but not limited to, demolition of select interior ceilings and demolition of existing mechanical systems. Add Alternates Bidders shall provide separate pricing for each of the following Add Alternates. Alternates will be awarded in order of priority, or in combinations, as determined by the Owner based on available funding. ~ Expanded brick repointing and faade restoration beyond critical areas ~ Restoration and reconstruction of the theatre marquee, to include new theater entrance and storefront (and subsequent demolition required for new work) ~ Exterior door and window refurbishment. ~ Lighting and exterior enhancements
Post Date: 06/05/2026Bid Date:06/19/2026Trades: *General Building Contractor GBC: Building Construction, Enclosed Structures; Opportunities for Subcontractors
The selected firms may be asked to assist with one or many of the following project types inside the Citys water and sewer systems: 1. Water distribution system rehabilitation or replacement replacing old pipelines with new, perhaps larger pipes. 2. Elevated storage tank rehabilitation to existing tanks or construction of new tanks 3. Water booster pump stations rehabilitation to existing or construction of new 4. Gravity sewer analysis and rehabilitation, including cured-in-place pipe and dig-and replace. 5. Sewer pump station and force main rehabilitation or construction of new pump stations and force mains. The engineers scope of services for any project may consist of some or all of the following: A. Evaluation of the existing system assets relative to the specific problem being considered. B. Evaluation of alternatives including capital cost and long-term operation costs of the asset(s). C. Field surveying. D. Geotechnical investigations and subsurface utility engineering reports. E. Development of engineering plans and specifications. F. Regulatory permitting including DEQ, DOT, US Corps of Engineers, and others. G. Preparation of contract documents meeting requirements of the NC General Statutes and any relevant funding agencies. H. Bid management facilitate the formal or informal bidding process. I. Construction management and onsite inspection J. Assistance with system startup and integration into the Citys operations. K. Record drawings and certifications.
Post Date: 05/29/2026Bid Date:06/22/2026Trades: *A&E Architecture & Engineering: Design Services, Consulting & Planning: Professional, EOR Services, Feasibility Study
Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside, 561730 - Landscaping Services. The Contractor shall perform tree Removal, stump grinding, and tree pruning at Raleigh and Wilmington National Cemeteries in accordance with the Statement of Work.
Post Date: 06/01/2026Bid Date:06/22/2026Trades: Tree Service Contractor: Planting/Trimming/Pruning Trees, Tree Felling, Stump Removal, Stump Grinding, Hydro-Ax Services
The town of Lucama will receive separate sealed bid proposals for the provision and installation of one new modular home built to the state building codes.
Post Date: 06/03/2026Bid Date:06/22/2026Trades: *General Building Contractor GBC: Building Construction, Enclosed Structures; Opportunities for Subcontractors, Prefabricated Buildings, Mobile Homes, Playgrounds, Trailers, Modular Units, Offices, Classrooms, Portable Toilets
The project generally consists of equipment replacement and courtyard modifications.
Post Date: 05/20/2026Bid Date:06/23/2026Trades: *General Building Contractor GBC: Building Construction, Enclosed Structures; Opportunities for Subcontractors, Building Maintenance, Installation & Repair Services: General Appliance Repair, Make Ready, Minor Renovations & Repairs
The work includes furnishing and installing one 1250 kW standby generator that will serve as a backup power source for the entire Sheriffs Office and Detention Center. This work will include providing an automatic transfer switch and new power distribution equipment as detailed in the project documents. One ADD ALTERNATE for replacing the existing MDP will be considered.
Post Date: 05/20/2026Bid Date:06/23/2026Trades: Generator Contractor: Electrical & Power Provider, Backup Battery Systems & Uninterrupted Power Supply (UPS) Systems