Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

Browse all California

#823834

Progressive Design-Build Services for the Burbank Library and Civic Center, Burbank, CA

Design-Builder will be responsible for the design and construction of the Project by furnishing all labor, material, equipment, services, and support facilities for the Work. The following is a brief overview of the basic services the selected Design-Builder will be required to perform during Phase 1 and Phase 2 (if awarded) of the Project: Validate the Project program, budget, scope, and schedule. The City is currently developing the Project definition documents regarding the program, budget, scope and schedule and these documents will be shared with shortlisted Respondents during the Proposal Phase. Facilitate collaborative design scoping workshops inclusive of City, Owners Project Manager, and design and construction personnel from the Design-Builder to develop a set of scope documents outlining and describing in detail the complete scope of the Project. Perform and produce initial studies, reports, and investigations during design initiation, including, but not limited to, geotechnical investigation and report, environmental monitoring, investigation, and remediations plans, hazardous materials investigations, topographic survey, and utility mapping to inform the design and engineering of the Project. City has conducted preliminary investigations that will be provided in the Proposal Phase to shortlisted Respondent as information only. Development of all required plans, specifications, studies, and reports required for the Work during design development, including surveys and geotechnical reports, based on design scoping workshops and investigations during design initiation. Development of a contracting plan, including, but not limited to, procuring trade contractors as appropriate in collaboration with the City and the Owners Project Manager. Development of cost modeling and cost estimates for the Construction Documents (plans and specifications), enabling the City and the Design-Builder to negotiate a Guaranteed Maximum Price (GMP) for the Work and execute an amendment for Phase 2. Manage design and construction of the Project including, but not limited to, obtaining required clearances, licenses, and permits for Work, Work sites, storage areas, etc., both on and off-site. Coordination with Project stakeholders under City and Owners Project Manager direction. Provide quality assurance and quality control during design and construction of the Project. Develop a comprehensive project baseline schedule including, but not limited to, procurement of long-lead time items. Provide Project safety and security, including accommodation of coordination of large groups around the Project. Installation of drainage and erosion control. Provide site clearance and preparation. Provide construction waste disposal and handling. Coordination with Project-related public involvement activities.
Post Date: 05/13/2026 Bid Date: 06/19/2026 Trades: Design/Build Contractor; Design/Bid/Build Entity (DBBE) or Design/Bid/Build (DBB), Class A - *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, Class B - *General Building Contractor GBC: Building Construction, Enclosed Structures; Opportunities for Subcontractors, *A&E Architecture & Engineering: Design Services, Consulting & Planning: Professional, EOR Services, Feasibility Study
#824137

Cabot Park Rehabilitation, Laguna Hills, CA

In general, the work is comprised of public works construction including play equipment and safety surfacing installation, steel handrail repairs, site furnishing replacement, park monument sign installation and minor restroom building repairs and replacements and other miscellaneous improvements as shown on the plans and as required to complete the work.

Post Date: 05/14/2026 Bid Date: 06/19/2026 Trades: Class A - *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
#824162

El Conejo Park Rehabilitation, Laguna Hills, CA

In general, the work is comprised of public works construction including playground renovation, ada improvements, drinking fountain replacement and new park sign, and other miscellaneous improvements as shown on the plans and as required to complete the work.

Post Date: 05/14/2026 Bid Date: 06/19/2026 Trades: Class A - *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
#824165

Mackenzie Park, Laguna Hills, CA

In general, the work is comprised of public works construction including playground renovation, ADA improvements, drinking fountain replacement and new park sign, and other miscellaneous improvements as shown on the plans and as required to complete the work.

Post Date: 05/14/2026 Bid Date: 06/19/2026 Trades: Class A - *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
#824167

San Remo Park Rehabilitation, Laguna Hills, CA

In general, the work is comprised of public works construction including play equipment and safety surfacing installation, site furnishing replacement and installation, park monument sign installation, concrete flatwork installation, landscape and irrigation installation and other miscellaneous improvements as shown on the plans and as required to complete the work.

Post Date: 05/14/2026 Bid Date: 06/19/2026 Trades: Class A - *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
#824169

Veeh Ranch Park Rehabilitation, Laguna Hills, CA

In general, the work is comprised of public works construction including play equipment and safety surfacing installation, site furnishing replacement and installation, park monument sign installation, concrete flatwork installation, landscape and irrigation installation and other miscellaneous improvements as shown on the plans and as required to complete the work.

Post Date: 05/14/2026 Bid Date: 06/19/2026 Trades: Class A - *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
#825628

Road Grading - Arroyo Conejo Open Space, Thousand Oaks, CA

Notice is hereby given that sealed proposals will be received for performing all work necessary and incidental to: Road grading maintenance on City-maintained direct access roads at six (6)locations in the Arroyo Conejo open space in compliance with applicable federal and state permits and environmental regulations.
Post Date: 05/23/2026 Bid Date: 06/19/2026 Trades: Class A - *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
#825804

Waste Water Treatment Plant Lab Roof Modification and Casino Showers and Restroom Roof Remediation, Avalon, CA

The City is requesting proposals from qualified firms/licensed contractor to provide all labor, materials, service and specialized skills for the Roof Modification and related scope located at 123 Pebbly Road, Avalon, Ca 90704 and 99 Casino Way, Avalon, Ca 90704.

Post Date: 05/25/2026 Bid Date: 06/19/2026 Trades: C39 - Roofing Contractor, Facia Board & Soffit Replacement, Gutters, Downspouts, Snow Guards, Class B - *General Building Contractor GBC: Building Construction, Enclosed Structures; Opportunities for Subcontractors
#826434

Slurry Seal Project for Residential Streets, Zone D (26S01A0 and Civic Center Parking Lot (26F01), Lake Forest, CA

The Contractor shall perform all Work within the time stipulated the contract and shall provide all labor, materials, equipment, tools, utility services, and transportation to complete all of the Work required in strict compliance with the Contract Documents as specified in "Component Parts of the Contract" section below for the following Project: Slurry Seal Project for Residential Streets, Zone D (26S01A) and Civic Center Parking Lot (26F01), 26S01A & 26F01.
Post Date: 05/28/2026 Bid Date: 06/19/2026 Trades: Class A - *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, C12 - Earthwork & Paving Contractor: Pavement Preservation, Resurface, Slurry Seal, High Friction, Milling, Land Clearing, Trails/Path
#826549

Citywide Guardrail Rehabilitation and Replacement, Stockton, CA

Description: Provide professional design services including preparation of plans, specifications, and an engineer's estimate of probable construction cost for the removal of existing guardrails and replacement with FHWA recommended Midwest Guardrail Systems at the following seven (7) locations as well as other professional design services required for the project: Carolyn Weston Blvd at French Camp Slough Arch Airport Overpass Eight Mile Road at Pixley Slough Bridge West Lane at Calaveras River Eight Mile Road & HWY 99 W Frontage Road Myrtle Street west of HWY 99 HWY 99 W Frontage Road at Mosher Slough
Post Date: 05/29/2026 Bid Date: 06/19/2026 Trades: *A&E Architecture & Engineering: Design Services, Consulting & Planning: Professional, EOR Services, Feasibility Study, Standard & High-Risk Safety Systems: Vehicle Guides Barricades Barriers Guardrail Attenuators Crash Cushions Bollards
#827340

Ergotron Sit-Stand Units, Placerville, CA

Project Scope: Purchase of Ergotron Sit-Stand Units and Accessories (Computer Accessories and Supplies).

Post Date: 06/03/2026 Bid Date: 06/19/2026 Trades: Suppliers: Supplies/Rental/Delivery of Construction Related, Construction Dependent or Construction Equipment
#827345

As-Needed and Urgent or Immediate Burial Services , Placerville, CA

As-needed and Urgent or Immediate Burial Services at various County-operated cemeteries located on the West Slope of the County. The services shall include: Excavation and preparation of gravesites in accordance with industry standards and applicable regulations Interment services, including proper placement and alignment of burial vaults or liners Disinterment services when authorized by the County and in compliance with all legal and health requirements Backfilling and compacting of soil following interment or disinterment Restoration of the site to its original condition, including grading and seeding as necessary Placement and installation of markers or headstones in accordance with County specifications and family requests.

Post Date: 06/03/2026 Bid Date: 06/19/2026 Trades: Class A - *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
#827725

RFQ Black Butte Septic Pumping Base + 4, Orland, CA

Total Small Business Set-Aside, 562991 - Septic Tank and Related Services. The contractor shall provide sewage pumping services at multiple vault and holding tank locations at Black Butte Lake. Services include the safe removal and off-site disposal of sewage. Instructions to Offerors: All unit prices and total prices shall be rounded to the nearest whole dollar.
Post Date: 06/05/2026 Bid Date: 06/19/2026 Trades: C42 - Sewer Pump System, Sewer Connection, Septic System Contractor: OnSite Sewage Facility (OSSF)
#827755

Waterline Repair at Lathrop National Guard Armory, Lathrop, CA

Description: The Contractor shall provide all materials, labor, bonds, licenses, insurance, equipment, tools, permits, taxes, transportation, and fees to excavate, repair, and restore the damaged waterline, including pavement restoration, to provide a complete and fully functional waterline system.

Post Date: 06/06/2026 Bid Date: 06/19/2026 Trades: C36 - Plumbing Contractor: Water Supply, Reverse Osmosis (RO), Water Heaters, Water Meters, Leak Detection, Flow & Backflow, Acoustic
#827758

Carport Installation Services at CAL FIRE Campo Fire Station #40, Campo, CA

Scope of Services: Contractor shall provide all materials, labor, equipment, tools, permits, taxes, transportation, and fees to furnish and install one (1) pre-engineered steel carport structure measuring approximately 20 feet wide by 70 feet long by 16 feet high in accordance with manufacturer specifications and applicable codes.

Post Date: 06/06/2026 Bid Date: 06/19/2026 Trades: C51 - Structural Steel & Steel Erection Contractor, Class B - *General Building Contractor GBC: Building Construction, Enclosed Structures; Opportunities for Subcontractors, D34 - Prefabricated Buildings, Mobile Homes, Playgrounds, Trailers, Modular Units, Offices, Classrooms, Portable Toilets
#827836

Active Transportation Program (ATP) Cycle 7 Railroad Avenue/Depot Street Corridor Improvements, Santa Maria, CA

The City of Santa Maria is inviting bids for the labor, materials, tools, and equipment necessary to complete the Active Transportation Program (ATP) Cycle 7 Railroad Avenue/Depot Street Corridor Improvements.

Post Date: 06/07/2026 Bid Date: 06/19/2026 Trades: Class A - *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
#828334

Camarillo Station ADA Improvement Project, Camarillo, CA

The Ventura County Transportation Commission (VCTC) hereby invites sealed bids from qualified contractors to furnish all labor, materials, equipment, and incidentals required to complete the Camarillo Station ADA Improvement Project in accordance with the specifications, plans, and contract documents prepared by VCTC. The scope of work generally consists of improvements necessary to enhance accessibility at the Camarillo Metrolink Station, including but not limited to; installation of accessible paths of travel, curb ramps, tactile warning strips, modifications to platforms, and other related site improvements.
Post Date: 06/09/2026 Bid Date: 06/19/2026 Trades: Class A - *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
#828426

Pest Control and Extermination Services at Authority Properties, Palm Desert, CA

The Project will provide monthly interior, exterior, and as-needed pest control and extermination services in vacant units, resident-requested occupied units and common areas. Services include rodent control, emergency response, call-backs, re-treatment, reporting, and related pest control services. The intent is to maintain safe, sanitary, and habitable residential properties through consistent pest prevention, control, and response services. Pigeon control/abatement shall be included only as an extra work line item and shall not be part of routine base services unless separately requested and authorized in writing by the Authority.
Post Date: 06/10/2026 Bid Date: 06/19/2026 Trades: *Pest Control & Animal Relocation Services: Extermination, Cremation, Termites, Beehives, Rodents: On-Call & Regular Schedule
#828436

On-Call General Building, Interior Repair, Drywall, and Cabinet Replacement Services at Authority Properties, Palm Desert, CA

The Palm Desert Housing Authority is requesting proposals from qualified Contractors to establish a Maintenance Services Agreement for a one (1)-year term with an option to renew for four (4) 1-year terms with one or more qualified contractors. Work may include drywall patching and replacement, ceiling repairs, texture matching, interior patch back work, minor trim and baseboard repairs, cabinet removal and replacement with vendor-furnished materials, cabinet repair or adjustment, optional priming or painting when requested, and coordination with affected trades where necessary to complete authorized work orders. No minimum amount of work is guaranteed, and work will be performed only when authorized by the Authority. To serve and promote the welfare of its residents, the Authority intends to procure the Services, as described in this solicitation.
Post Date: 06/10/2026 Bid Date: 06/19/2026 Trades: Class B - *General Building Contractor GBC: Building Construction, Enclosed Structures; Opportunities for Subcontractors, C9 - Drywall and Plastering Contractor, C6 - Cabinetry & Millwork, Finish Carpentry Contractor, Casework
#828441

On-Call Electrical Maintenance Services at Authority Properties, Palm Desert, CA

The Palm Desert Housing Authority is requesting proposals from qualified Contractors to establish a Maintenance Services Agreement for a one (1)-year term with an option to renew for four (4) 1-year terms with one or more qualified contractors. Work may include routine, urgent, and emergency electrical service calls, lighting repairs, outlet and switch replacements, breaker and circuit troubleshooting, panel or subpanel troubleshooting, exterior and parking lot lighting repairs, and other related electrical maintenance services. To serve and promote the welfare of its residents, the Authority intends to procure the Services, as described in this solicitation.
Post Date: 06/10/2026 Bid Date: 06/19/2026 Trades: C10 - High Voltage Electrical Contractor (HVE): Electrician, Power Lines; Substation, Switchgear, Transmission/Power Lines