Sealed bids will be accepted by Los Angeles County Public Works, Project Management Division III, for the reconstruction of roadway, parkway concrete repair, tree maintenance, and the performance of other appurtenant work under Project ID No. RDC0015913, East Los Angeles Whiteside Street, et al., Phase 1, in the unincorporated community of East Los Angeles.
Post Date: 06/19/2026Bid Date:07/14/2026Trades: Class A - *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
Sealed bids will be accepted by Los Angeles County Public Works, Project Management Division III, for the resurfacing of 4.2 miles of existing roadways, removal and replanting of 33 trees, striping, modification of eight traffic signals and signage, commercial driveway approaches, sidewalks, curb ramp upgrades and the performance of other appurtenant work under Project ID No. RMD1102001, West Puente Valley Temple Avenue et al in the Cities of Industry, La Puente, and South El Monte, and in the unincorporated community of West Puente Valley.
Post Date: 06/19/2026Bid Date:07/14/2026Trades: Class A - *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, C12 - Earthwork & Paving Contractor: Pavement Preservation, Resurface, Slurry Seal, High Friction, Milling, Land Clearing, Trails/Path
Sealed bids will be accepted by Los Angeles County Public Works, Project Management Division III, for the reconstruction of curb and gutter, sidewalk, driveways, alley intersections, and cross gutters, and the performance of other incidental and appurtenant work under Project ID No. RMDJOC6793, Parkway Concrete Maintenance, Maintenance District No. 3, in various unincorporated communities of Los Angeles County, Maintenance District No. 3. The contract price will be $1,000,000 and shall be for one year or until $1,000,000 of work orders have been completed, whichever occurs first.
Post Date: 06/19/2026Bid Date:07/14/2026Trades: Class A - *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, C8 - Concrete Contractor: Pavement, Driveways, Sidewalks, Curbs, Gutters, Flatwork, ADA Ramps Pedestrian Improvements, CIP Concrete
Humboldt County Sheriff Patrol Office Remodel Project
Post Date: 06/19/2026Bid Date:07/14/2026Trades: Class B - *General Building Contractor GBC: Building Construction, Enclosed Structures; Opportunities for Subcontractors
The scope of work generally includes the trenching and installation, pipe bursting, pipe reaming, or cured-in-place installation of 6-inch to 10-inch sanitary sewer pipe, localized pipe repairs, installation/ replacement/ rehabilitation/removal of sanitary sewer manholes, CIPP point repairs, reconnections/replacement of sewer laterals, and the surface restoration of existing improvements
Post Date: 06/23/2026Bid Date:07/14/2026Trades: Class A - *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, C34 - Pipeline Contractor: Water Mains, Sewer Lines, Septic Lines; CIPP Pipe liners, Pipe Inspection, Video & Robotic Cameras, D56 - Excavation & Grading Contractor: Blasting, Boring, Trenching, Backfill, Digging, Filing, Stormwater Drainage: Manholes & Valve Boxes, Ditches, Culverts, Shoulder Work, Grates, French Drains, Dewatering, Water Swales
The project includes rehabilitating the San Rafael Bus Facility's main water line, including installing a backflow preventer, replacing valves and other associated water line work.
Post Date: 06/24/2026Bid Date:07/14/2026Trades: C34 - Pipeline Contractor: Water Mains, Sewer Lines, Septic Lines; CIPP Pipe liners, Pipe Inspection, Video & Robotic Cameras, C36 - Plumbing Contractor: Water Supply, Reverse Osmosis (RO), Water Heaters, Water Meters, Leak Detection, Flow & Backflow, Acoustic , *A&E Architecture & Engineering: Design Services, Consulting & Planning: Professional, EOR Services, Feasibility Study
Description: The Contractor shall perform overlay on approximately 6,000 square feet of synthetic turf, and will be compensated for the services which shall include all labor, travel and per diem, materials, non-consumable supplies, transportation, tools, insurance, permits, licenses, bonds, and every other item of expense necessary to provide the services for the California Department of Corrections and Rehabilitation (CDCR), Correctional Construction Mentorship (CCM) Program, located at San Quentin Rehabilitation Center (SQRC), 100 Main St. San Quentin, CA 94964.
Description: High voltage equipment maintenance and repair services requiring annual preventative maintenance testing including visual and mechanical inspections, thermographic surveys, insulation resistance tests, dissolved gas analysis, and grounding impedance tests.
Post Date: 06/26/2026Bid Date:07/14/2026Trades: C10 - High Voltage Electrical Contractor (HVE): Electrician, Power Lines; Substation, Switchgear, Transmission/Power Lines, Class A - *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
Description: On-Call Vegetation Management Services to support the Parks Planning & Development Division. The contract involves tree trimming, herbicide/pesticide application, equipment operation, wood chipping, off-haul disposal, and brush grinding services.
Post Date: 06/27/2026Bid Date:07/14/2026Trades: C27 - *Landscaping Contractor & Groundskeeping, Xeriscaping, Hardscaping, Weed Control Grubbing Sodding Lawn Mowing Mulching, Pesticide & Herbicide Applications: Chemical Root Control or Mosquito Control (Adulticide, Larvicide), Vegetation Control & Wildfire Prevention: Brush Clearing, Burning, Fire Prevention, Fuel Breaks, Mitigation & Mastication
Description: Contractor agrees to provide the Department of Consumer Affairs (DCA), Business Services Office, Facilities Management Unit (BSO, FMU), with recycling services, and collecting and processing recyclable materials from designated DCA facilities, which includes either in-house and/or dockside collection locations.
Description: The Contractor shall provide Carpet Replacement Services for the EDD facility located at 371 W. Third Street, San Bernardino, CA 92401. Contractor to remove and haul away the existing top layer of carpet tile, baseboards, and transition strips; clean and prepare the floors; and install new carpet, new resilient flooring (LVT) (please refer to Floor Plan), rubber baseboard, and transition strips.
Post Date: 06/28/2026Bid Date:07/14/2026Trades: C15 - Floor Covering and Flooring Contractor, Including Carpet, Wood, Marble, Tile, Ceramic, Linoleum, Vinyl
Description: The Contractor, agrees to provide the Department of Motor Vehicles (DMV) all labor, tools, materials, equipment, and travel necessary to perform after-hours janitorial services at the Manteca DMV field office for the term of Thirty-six (36) months. The services shall be performed at: 955 Davis Street, Manteca, CA 95337.
Description: The Contractor, agrees to provide the Department of Motor Vehicles (DMV) all labor, tools, materials, equipment, and travel necessary to perform a one-time landscape cleanup service (if needed and authorized by the DMV) and bi-weekly landscape maintenance services at the Bell Gardens for Thirty-six (36) months. The services shall be performed at: 6801 South Garfield Avenue, Bell Gardens, CA 90201.
Project Description: Construction of Main Street Garage Remediation Project and other work as described in the Contract Book.
Post Date: 06/30/2026Bid Date:07/14/2026Trades: Class B - *General Building Contractor GBC: Building Construction, Enclosed Structures; Opportunities for Subcontractors, Class A - *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
Description: The Work includes access modifications and the replacement of electrical and mechanical equipment at the Mossdale Wastewater Pump Station. The Project is located at 703 River Islands Parkway, Lathrop, CA.
Post Date: 06/30/2026Bid Date:07/14/2026Trades: Class A - *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, C10 - High Voltage Electrical Contractor (HVE): Electrician, Power Lines; Substation, Switchgear, Transmission/Power Lines
Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside, 236220 - Commercial and Institutional Building Construction. Renovate and expand chilled water infrastructure. This project involves the replacement of the chilled water piping in the OPC and building 1, the chilled water pumps currently serving these areas, and any undersized fan coils in these areas. The existing pipes are too small to accommodate the required chilled water flow that is required in the summer months, and their associated risers are scattered throughout various locations in the building. These risers will be demolished and consolidated to two sets of risers, one serving the north wing of building 1 and one serving the OPC and south wing of building 1. The new piping system will be used for chilled water as well as hot water; new control valves will be provided on the hot and chilled water lines to allow for switchover during summer/ winter months.
Post Date: 07/04/2026Bid Date:07/14/2026Trades: C20 - HVAC Contractor: Heating Ventilating Air Conditioning & Controls, Duct Clean, Exhaust Systems, Air Handler/Air Chillers, RTU's
The scope of work for construction management of the Citys Project 7944 Local Street Rehabilitation Program Zones 5 and 6: Pre-Construction Support Services, Construction Management/Inspection Services, and Post Construction Services.
Post Date: 07/06/2026Bid Date:07/14/2026Trades: *Construction Management; General Contractor CM/CMGC/CMaC: Owner's Representative Services NIGP 925-44, Inspection Services, Inspector of Record (IOR) Services & Testing Laboratories - NAICS 541380
Construction of El Camino Real Bridge and roadway widening consists of the realignment of El Camino Real between San Dieguito Road and Via De La Valle and the widening of Via De La Valle between existing El Camino Real and North El Camino Real. Improvements include the construction of a 3-span haunched box girder bridge over San Dieguito River, installation of bank stabilization (rock slope protection and turf reinforcement matting), curb and gutter, raised medians, sidewalk, curb ramps, fence, storm drain, a triple box culvert, water, sewer, D.G. equestrian trails, Green infrastructure improvements, traffic signals, traffic signal modifications, signing and striping, driveway improvements, removal of the existing bridge and portions of the existing roadway, planting of trees, and revegetation of disturbed areas. All other incidental work and appurtenances in accordance with the specifications and plans will also be implemented for this project.
Post Date: 05/20/2026Bid Date:07/15/2026Trades: Class A - *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors