Browse all Washington
US 730, Oregon State Line to US 12 - Paving, Walla Walla, WA
Fleet Charging Stations + Security E-02, Seattle, WA
The project work includes installation of new electric vehicle (EV) chargers and provide site protection/security enhancements including fencing/gates, access control, lighting, and camera systems to parking lot E-02 at the University of Washington Seattle campus. The parking lot is located directly northeast of the intersection of 25th Ave NE and NE 44th Street. The project location is in an area previously used as a landfill or a related buffer zone susceptible to differential settlement. The project will include below grade scope and incorporate support elements and other accommodations to provide surface stability and uniformity. Electric vehicle chargers will be of the Level 2 and Level 3 direct current fast charging type. Provisions will be provided for future expansion of additional direct current fast chargers.
REBID Pangborn GA Terminal Radio Equipment, East Wenatchee, WA
Furnish and install land mobile and airband radio systems, including head units, power supplies, IP remotes, antennas and all other cabling and equipment necessary to provide a fully functioning system.
RFP: Exterior Cleaning Services, Everett,WA
The Port of Everett is seeking proposals from qualified Facility Maintenance Contractors to provide a range of services as outlined in this solicitation. The Port desires that exterior grounds are consistently clean and well maintained to the greatest extent feasible. The Contractor shall deliver services that promote a clean, safe, and visually appealing environment appropriate for a high-traffic, year-round waterfront destination serving the public. Priority shall be given to high-visibility and high-use areas, including public entrances, pedestrian pathways, and areas adjacent to restaurants, and retail establishments.
EGCC Living Unit Roof Replacement - Department of Children, Youth and Families, Snoqualmie, WA
Hobart Utility Shed, Maple Valley, WA
The work of this contract is primarily to Construct a 187 SF CMU utility facility building for King County Solid Waste Division to house a new compressor system for natural gas and a new heater to prevent equipment from freezing. Subcontracting opportunities: architectural, structural, mechanical, electrical, civil, professional engineer.
West 1st Street (SR 170) Pedestrian Improvements, Warden, WA
This Contract provides for the construction of new sidewalks, including driveways, ADA compliant curb ramp improvements, and associated storm drainage along West 1st Street (SR 170), from South County Road to the east edge of Railroad Right-of-way, including but not limited to excavation, grading, subgrade preparation, cement concrete curb, gutters, curb ramps, sidewalks, driveway entrances, hot mix asphalt pavement repair, storm sewer pipes, precast concrete drywells, catch basins, pavement marking, miscellaneous surface restoration, permanent signing, traffic control and other work.
Mt. Goat Soccer Field, Chelan, WA
2026 Preservation Project, Springdale, WA
Crack Sealing 2026, Washtucna, WA
This Work shall consist of the Contractor providing all labor, equipment and material, including traffic control, necessary to crack seal all cracks and joints, 1/8 inch and greater in width, by first cleaning with compressed air and filling completely with crack sealing material.
SR 28, EWC 2026 Demo No. 2, Douglas Co, WA
Requires the removal of structures and obstructions, removal and disposal of asbestos material, ESC lead, erosion control and water pollution prevention, high visibility fence, high visibility silt fence, bark or wood chip mulch, FA-site cleanup of Bio. and physical hazards, traffic control and other work. Involves 12 items and 15 working days. Work class 13, demolition.
BSD Central Freezer Improvements, Bellevue, WA
Project generally consists of selective demolition of existing freezer and related equipment, installation of new freezer and related equipment, demolition and site prep for new generator, installation of new generator and automatic transfer switch and associated electrical infrastructure.
Medical Center CT Replacement (ED), Kirkland, WA
The project is to remove and replace the ED CT. This will require the removal and reinstall casework, lead shielding demo, new lead shielding install, drywall, electrical, F/I leaded door and window, remove/reinstall sink, and new flooring.
Ash Way Overlay - 164th Street SW to Park & Ride, Snohomish, WA
This contract provides improvement of Ash Way from 164th St SW to Park & Ride. The Work includes pavement repair, planing, paving, pavement markings, utility adjustments, traffic control, and other work.
Beverly Park Road ADA Upgrades & 18th Avenue West Sidewalk Improvements, Snohomish, WA
This Contract provides for the improvement of Beverly Park Rd ADA Upgrades at Fairmount Elem & Center Rd and 18 Ave W Sidewalk 151 St SW to Jefferson Way. The Work includes reconstructing existing curb ramps to ADA compliance and upgrading pedestrian push buttons to APS standard, extending sidewalk, curb, and gutter, and planter strip on the west side of 18th Ave W between 151st St SW and Jefferson Way, and other work.
Smith Boundary Fence Replacement, Douglas Co, WA
Provide all labor, materials, equipment, and permits to remove approximately 1.99 miles of existing fencing and to construct approximately 4.98 miles of 4-wire cattle fence.
2026 Bruett Road Water Main Upsize, Duvall, WA
The project will replace the existing 8-inch diameter PVC piping with approximately 900 linear feet of new 12-inch ductile iron piping along NE 152nd Street (also known as Bruett Road), from the intersection of 3rd Ave NE to the corner of 26919 NE 252nd Street.
Catholic Charities Office Renovations, Yakima, WA
Renovations to existing 13,504 sf building. Work consists of some demolition, construction of new woodframe walls with finishes. New mechanical and electrical systems. New exterior openings in masonry walls for windows. Exterior EIFS and fixed window awnings. All new roofing. A barista space will be developed. A separate parcel across alley will receive buried conduits for future E-V chargers (by owner). New asphalt site paving.
REBID Building I Bookstore Conversion - Renton Technical College, Renton, WA
Counties in Washington
- Adams (3)
- Asotin (1)
- Benton (21)
- Chelan (9)
- Clallam (12)
- Clark (39)
- Cowlitz (14)
- Douglas (14)
- Franklin (7)
- Grant (9)
- Grays Harbor (13)
- Island (5)
- Jefferson (4)
- King (136)
- Kitsap (16)
- Kittitas (7)
- Lewis (14)
- Lincoln (3)
- Mason (4)
- Okanogan (9)
- Pacific (1)
- Pend Oreille (4)
- Pierce (1)
- Pierce (53)
- San Juan (5)
- Skagit (12)
- Skamania (2)
- Snohomish (46)
- Spokane (27)
- Statewide (3)
- Stevens (2)
- Thurston (15)
- Wahkiakum (1)
- Walla Walla (9)
- Whatcom (16)
- Whitman (3)
- Yakima (13)