Total Small Business Set-Aside, 811210 - Electronic and Precision Equipment Repair and Maintenance. This is a 5 year contract with the following period of performance: Base Year: 29 Sep 26 - 30 Sep 27 plus four year option. The contractor shall provide all personnel, equipment, tools, materials, supervision, and other items necessary to perform preventive and corrective maintenance on the C2 system and associated equipment as defined in the attached PWS. The objective is to ensure the system remains fully functional and available to support the 60 AMW mission. This includes on-site maintenance, remote technical support, parts replacement, and software support.
Post Date: 05/30/2026Bid Date:06/17/2026Trades: Security System: FOB, Access Control, CCTV, Video Surveillance, Active Threat, Intrusion Alarms (Except Locksmiths) NAICS 561621
Total Small Business Set-Aside, 238910 - Site Preparation Contractors. Under an Interagency Agreement, the John A. Volpe National Transportation Systems Center (Volpe Center) is providing support to the Federal Aviation Administration (FAA) Facilities Real Property Disposition program. As part of these efforts, removal/demolition and related activities will be conducted at one Very High Frequency Omnidirectional Range (VOR) facility in the FAAs Western Service Area (ESA). The demolition and related activities shall be performed at the FAA facilities listed below: CZQ VOR Clovis, CA (38.884322, -119.815140). The FAA no longer uses the equipment/buildings at the above-listed facility. The property is leased and there are no co-located facilities, so the FAA plans to cancel the lease after the demolition and restoration activities take place. Prior to relinquishing this property the FAA plans to remove environmental hazards, demolish or remove certain onsite structures and infrastructure, and restore disturbed areas.PoP June 24, 2026 - Sept 30, 2026.
Post Date: 05/30/2026Bid Date:06/17/2026Trades: C21 - Demolition Contractor, Building Removal and/or Relocation, Wrecking & Hauling
Project Description: The Project Scope of Work includes all labor, materials, equipment, supervision, services, off-site work, landscaping, and all work indicated in the plans and specifications necessary for the construction of new educational facilities and associated site improvements. The project includes construction of new classroom, administration, cafeteria, and multi-use buildings, along with related grading, drainage, paving, utilities, fencing, and site lighting improvements. The work also includes all associated civil, structural, architectural, mechanical, electrical, plumbing, and low-voltage systems required for a complete and fully operational facility.
Post Date: 05/30/2026Bid Date:06/17/2026Trades: Class B - *General Building Contractor GBC: Building Construction, Enclosed Structures; Opportunities for Subcontractors
The City currently maintains an inventory of approximately 7,734 street and park trees, representing a vital public asset that contributes to community aesthetics, environmental sustainability, and public safety. These trees require ongoing professional care to ensure their long-term health, structural integrity, and compliance with industry standards. The purpose of this maintenance contract is to provide the City of Baldwin Park with the best possible tree care to maintain the City at a level expected by the Citys residents, City Council, City staff, and visitors of the community. At present, the City operates on an approximate four- to five-year grid pruning cycle. Through this RFP, the City seeks to transition to a more proactive and industry-aligned three-year pruning cycle for the majority of trees, with a two-year pruning cycle for palm trees. This enhanced maintenance frequency is intended to: Improve overall tree health and longevity, Promote stronger tree structure and reduce failure risk, Enhance public safety by minimizing hazards, Support environmental benefits, including shade canopy and air quality, and Contribute to the restoration and sustainability of the Citys urban forest canopy. The selected contractor will play a critical role in helping the City achieve these objectives through high-quality, efficient, and responsive care services, consistent with recognized arboricultural standards and best management practices.
Post Date: 05/30/2026Bid Date:06/17/2026Trades: C61/D49 - Tree Service Contractor: Planting/Trimming/Pruning Trees, Tree Felling, Stump Removal, Stump Grinding, Hydro-Ax Services, ISA Certified Arborist: Tree Species Specialist, Tree Evaluation Services, C27 - *Landscaping Contractor & Groundskeeping, Xeriscaping, Hardscaping, Weed Control Grubbing Sodding Lawn Mowing Mulching
Major work components include installation of pedestrian and vehicle traffic safety improvements including signage, striping, and pavement markers at various locations Citywide and all related work as per plans and specifications. Major work components include the installation of pedestrian and vehicle traffic safety improvements, including but not limited to signage, striping, and pavement markers at various locations citywide, and all related work as per Exhibit A project plans, notes, and specifications.
Post Date: 05/30/2026Bid Date:06/17/2026Trades: Class A - *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
Major work components include removal of the existing frame-mounted pump, installation of a new dry-pit submersible end suction pump, removal and installation of a new control panel, fabrication and installation of custom suction and discharge piping spools, re-grouting of the pump as needed, installation of new seal and thermal relay controls with rewiring of existing controls, system startup, SCADA integration, and all related work as shown in specifications.
Post Date: 05/30/2026Bid Date:06/17/2026Trades: Class A - *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
The work to be done consists of furnishing all materials, equipment, tools, labor, and incidentals as required by the Plans, Specifications, and Contract Documents for the above stated project. The general items of work to be done hereunder consist of weed abatement, crack sealing, slurry sealing, pavement markings, localized full depth pavement repairs, and striping on various streets in the City and all appurtenant related work to the satisfaction and acceptance of the City Engineer.
Post Date: 06/03/2026Bid Date:06/17/2026Trades: Class A - *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
Scope of Work: The work consists in general of mobilization, erosion control, demolition, earthwork and grading, minor concrete (curbs, sidewalks, and gutters) , AC grinding and paving, aggregate base, pavement striping and ADA signage , refuse enclosure construction, wheel stops, traffic management, irrigation adjustments, and root barrier installation.
Post Date: 06/04/2026Bid Date:06/17/2026Trades: Class A - *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
Murow Development Consultants is inviting bids for the labor, materials, tools, and equipment necessary to complete the Placer Vineyards Neighborhood Park.
Post Date: 06/05/2026Bid Date:06/17/2026Trades: C27 - *Landscaping Contractor & Groundskeeping, Xeriscaping, Hardscaping, Weed Control Grubbing Sodding Lawn Mowing Mulching, Class A - *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
Project Description: This Project includes grinding/cutting temporary asphalt ramp out to matching grade of asphalt parking lot, asphalt seal coating, parking lot striping and installation of signage and precast concrete wheel stops.
Post Date: 06/05/2026Bid Date:06/17/2026Trades: C12 - Earthwork & Paving Contractor: Pavement Preservation, Resurface, Slurry Seal, High Friction, Milling, Land Clearing, Trails/Path, C32 - Road Improvements: Parking & Highway Improvements; Intersections, Roundabout, Median Construction - NAICS 237310, C45 - Signs & Signage Contractor: (Non-Electrical & Electrical) Digital & Video Displays, Tower Clocks, Billboards, Scoreboards, Wayfi, Class A - *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
The Project consists of: Construct Restroom & Utility addition to the existing Needles Animal Shelter building in Needles, CA.
Post Date: 06/07/2026Bid Date:06/17/2026Trades: Class B - *General Building Contractor GBC: Building Construction, Enclosed Structures; Opportunities for Subcontractors
The base work of this project consists generally of, without limitation, notification of residents; traffic control; installation of best management practices for storm water management; roadway grinding and paving; removal of existing sidewalk, curb & gutter, and curb ramps and replacement with new curb ramps and sidewalks; asphalt concrete spot reconstruction/dig outs; resurfacing City streets with Microsurfacing; adjustment of utility lids to the new grade; removal of sign posts and signs & installation of new sign posts and signs; installation of new roadway markings and striping; installation of Rectangular Rapid Flashing Beacons (RRFB), and site cleanup. A Bid Alt Construction element in the Downtown - Broadway Ped Mall includes similar work. Contract Documents fully describe the Work
Post Date: 06/09/2026Bid Date:06/17/2026Trades: C12 - Earthwork & Paving Contractor: Pavement Preservation, Resurface, Slurry Seal, High Friction, Milling, Land Clearing, Trails/Path, Class A - *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, C8 - Concrete Contractor: Pavement, Driveways, Sidewalks, Curbs, Gutters, Flatwork, ADA Ramps Pedestrian Improvements, CIP Concrete, C45 - Signs & Signage Contractor: (Non-Electrical & Electrical) Digital & Video Displays, Tower Clocks, Billboards, Scoreboards, Wayfi, Pavement Marking, Traffic Striping, Raised Pavement Markers (RPMs) & Reflectors, Centerline Rumble Strips
Phase I, 2026 Sewer Lining Project: Contractor shall furnish labor, materials, equipment, services, and specialized skills to perform work involved in the Project. The Work included in the Bid is defined in accordance with Specification No. 3976 and Plan Nos. 3-1590 and 3-1595. The work generally includes: providing traffic control on residential, collector, and arterial streets; cleaning and preparation of existing pipelines; pre- and post-construction closed-circuit television (CCTV) inspection; installation of sectional and full cured-in-place pipe (CIPP) liners in sanitary sewers; provision of sewage bypass, removal and replacement of interfering trees and plants; repair of appurtenances; and all other related work as shown on the project plans and specifications, Standard Plans for Public Works Construction (SPPWC 2021 Edition), and the Standard Specifications for Public Works Construction (2024 Edition), including all supplements thereto issued prior to bid opening date. Phase II, On-Call Sewer and Storm Drain Lining Services: Contractor shall dispatch and mobilize their resources necessary for on-call services within twenty-four (24) hours of notification by the City, unless otherwise directed by the Director or designee. The failure to dispatch on a timely manner will result the contract termination by the City per Paragraph 5.2, Termination by the City for Cause, of the General Conditions. The second phase of the work is on-call contract for Sewer and Storm Drain Lining Services. Contractor shall dispatch and mobilize its resources, including furnishing labor, materials, equipment, services, and specialized skills, within twenty-four (24) hours of notification by the City to perform sewer or storm drain repairs on an as-needed basis. The Work included in the Bid is defined in accordance with Specification No. 3976. The general sewer or storm drain work includes: providing traffic control on residential, collector, and arterial streets; cleaning and preparation of existing pipelines; pre- and post-construction closed-circuit television (CCTV) inspection; installation of sectional and full cured-in-place pipe (CIPP) liners in sanitary sewers and storm drains; provision of sewage and storm water bypass, removal and replacement of interfering trees and plants; repair of appurtenances; and all other related work as needed and directed by the Director or his designee and as shown on the project specifications, Standard Plans for Public Works Construction (SPPWC 2021 Edition), and the Standard Specifications for Public Works Construction (2024 Edition), including all supplements thereto issued prior to bid opening date.
Post Date: 06/09/2026Bid Date:06/17/2026Trades: Class A - *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, C42 - Sewer Pump System, Sewer Connection, Septic System Contractor: OnSite Sewage Facility (OSSF), C34 - Pipeline Contractor: Water Mains, Sewer Lines, Septic Lines; CIPP Pipe liners, Pipe Inspection, Video & Robotic Cameras
The base work of this project consists generally of, without limitation, notification of residents; traffic control; installation of best management practices for storm water management; roadway grinding and paving; removal of existing sidewalk, curb & gutter, and curb ramps and replacement with new curb ramps and sidewalks; asphalt concrete spot reconstruction/dig outs; resurfacing City streets with Microsurfacing; adjustment of utility lids to the new grade; removal of sign posts and signs & installation of new sign posts and signs; installation of new roadway markings and striping; installation of Rectangular Rapid Flashing Beacons (RRFB), and site cleanup. A Bid Alt Construction element in the Downtown - Broadway Ped Mall includes similar work. Contract Documents fully describe the Work
Post Date: 06/11/2026Bid Date:06/17/2026Trades: Class A - *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, C31 - Construction Zone Traffic Control Contractor, Flashing Beacons, Pavement Marking, Traffic Striping, Raised Pavement Markers (RPMs) & Reflectors, Centerline Rumble Strips, C45 - Signs & Signage Contractor: (Non-Electrical & Electrical) Digital & Video Displays, Tower Clocks, Billboards, Scoreboards, Wayfi
SCRRA seeks to obtain the services of a qualified contractor through bidding process. The scope of work includes construction and refurbishment of existing restrooms, renovation of areas to provide for office cubicle space, and an addition of an employee breakroom at the Central Maintenance Facility (CMF), located at 1555 N. San Fernando Road, Los Angeles, CA 90065. This project addresses the critical need to upgrade the deteriorated restrooms and provide a proper breakroom at the Central Maintenance Facility (CMF), a key operational site. These improvements are essential to ensure compliance with American with Disability Act (ADA) as well as California Department of Industrial Relations (DIR) requirements, which mandate that employee lunch areas be sheltered, suitable for consuming food and drinks, and equipped to allow employees to prepare meals.
Post Date: 04/13/2026Bid Date:06/18/2026Trades: Class A - *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, C36 - Plumbing Contractor: Water Supply, Reverse Osmosis (RO), Water Heaters, Water Meters, Leak Detection, Flow & Backflow, Acoustic , C54 - Ceramic & Mosaic Tile or Tiling Contractor: Bathroom, Kitchen, Backsplash, Decorative, Fountain, Subway, Marble, Glass, Porcelai, C9 - Drywall and Plastering Contractor, C10 - High Voltage Electrical Contractor (HVE): Electrician, Power Lines; Substation, Switchgear, Transmission/Power Lines
Notice is hereby given that the City of Santa Monica invites Contractors to complete and submit electronic bids for the: Pier Below Deck Fire Sprinkler Replacement Project Phase 3.
Post Date: 05/04/2026Bid Date:06/18/2026Trades: Class A - *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, C16 - Fire Protection: Fire Alarm, Smoke Detection & Fire Suppression Contractor, Fire Extinguishers, Pumps, Hydrants & Inspections
Total Small Business Set-Aside, 237310 - Highway, Street, and Bridge Construction. The Forest requires routine maintenance on 13.59 miles of roadway to address erosion, restore surface integrity, and ensure proper drainage performance. Additionally, 2.56 miles of existing chip seal roadway must be pulverized and reconstructed to return the segment to the appropriate maintenance standard.
Post Date: 05/16/2026Bid Date:06/18/2026Trades: C12 - Earthwork & Paving Contractor: Pavement Preservation, Resurface, Slurry Seal, High Friction, Milling, Land Clearing, Trails/Path
Project Description: The construction of a new 6-inch sewer main and the paving of the unimproved access road to the Giovanni sewer lift station. Other items or details not mentioned above that are required by the Plans, Standard Specifications, or these Special provisions, shall be performed, constructed or installed.
Post Date: 05/18/2026Bid Date:06/18/2026Trades: C34 - Pipeline Contractor: Water Mains, Sewer Lines, Septic Lines; CIPP Pipe liners, Pipe Inspection, Video & Robotic Cameras, Class A - *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors