The Project includes the following Work: Install 4-5 feet wide sidewalk along the western side of Ray Avenue +-190 LF and the northern side of Mason Street +- 545 LF; +- 1878 LF of sidewalk along Morganton Rd and South Herndon St from St. Marys Parkway to Cliffdale Rd; +- 738 LF of sidewalk along Old Wilmington Rd to connect to existing sidewalk.
Post Date: 05/14/2026Bid Date:06/09/2026Trades: *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, Concrete Contractor: Pavement, Driveways, Sidewalks, Curbs, Gutters, Flatwork, ADA Ramps Pedestrian Improvements, CIP Concrete
The purpose of this Request for Proposals (RFP) is to seek competitive proposals from qualified vendors to establish an Agency Contract to provide The North Carolina Department of Public Safety, Division of Emergency Management (NCEM) with Emergency waste collection and disposal services throughout the 100 Counties of North Carolina and the Territory of the Eastern Band of the Cherokee Indian, on an as needed, emergency response basis. NCEM is a government organization that administers state and federal emergency management programs enabled by the Federal Stafford Act and Chapter 166A of the North Carolina General statutes. NCEM is charged with responding to any emergency, man-made or natural, 24 hours a day seven (7) days a week. This requires that the awarded Vendor(s) have personnel and the capability to respond to order requests after hours, weekends and during holidays. This All-Hazard Contract is therefore required to meet both small scale and large-scale needs, as well as to address short and long term distribution system disruptions. Based on emergency need, the State may require multiple sites and temporary infrastructure support.
This project consists of pedestrian improvements along US 74/76 (Eastwood Road) from Rogersville Road to Cavalier Drive. The improvements include, but are not limited to grading, multi-use paths, curb and gutter, landscaped medians, drainage, signal work, and asphalt paving.
Post Date: 05/19/2026Bid Date:06/09/2026Trades: *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
The University of North Carolina at Wilmington is seeking a qualified Construction Manager at Risk (CMR) firm to provide professional construction management services during the design and construction phases of the project. The work of the CMR will be consist of two phases. Phase I will include pre-construction services and preparation of a GMP. Phase II will include the bidding, award, and management of the project during construction. All work is to comply with the requirements of the North Carolina State Construction Office.
Post Date: 05/20/2026Bid Date:06/09/2026Trades: *At Risk Construction Management CMaR: Owner's Representative Services NIGP 925-44, *A&E Architecture & Engineering: Design Services, Consulting & Planning: Professional, EOR Services, Feasibility Study
Paving Project Base Bid 720 SY +/- of Asphalt Overlay (1.5) 6125 SY +/- of New Asphalt (2) 2745 SY +/- of Seal Coat 720 SY +/- of Single Seal 2150 SY +/- of Double Seal 5440 SY +/- of Asphalt Removal 405 SY+/- of Full Depth Patching Paint Striping to match the existing conditions Adjustment of utilities, traffic control, and related work
Post Date: 05/21/2026Bid Date:06/09/2026Trades: *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, Earthwork & Paving Contractor: Pavement Preservation, Resurface, Slurry Seal, High Friction, Milling, Land Clearing, Trails/Path
This project improves the domestic water service to the Horticultural Field Labs and the Dearstyne Complex by extending a new water line service and connection from Beryl Road and by installing a loop connection in existing piping serving the Dearstyne Complex. The project will also address domestic water pressure issues experienced by the HFL since the West Campus was disconnected from the Method Road pumping station as a result of the I-440 widening.
Post Date: 05/23/2026Bid Date:06/09/2026Trades: *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, Public Utilities - Water & Sewer Lines: - Pipeline Contractor: Water Mains, Sewer Lines, Septic Lines; CIPP Pipe liners, Pipe Inspection, Video & Robotic Cameras
Scope of work includes replacement of the expansion joint caulking inside the confined spaces of the clear well, and cleaning and inspection of drain lines.
Post Date: 05/26/2026Bid Date:06/09/2026Trades: *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
The Guilford County Schools Board of Education seeks to select individuals or firms experienced in the design of public-school facilities to provide Architectural and Professional Engineering Services for Roof Replacement Design services for projects at Irving Park and Jones Elementary Schools.
Post Date: 05/27/2026Bid Date:06/09/2026Trades: *A&E Architecture & Engineering: Design Services, Consulting & Planning: Professional, EOR Services, Feasibility Study
The project generally consists of replacement of fire alarm.
Post Date: 04/29/2026Bid Date:06/10/2026Trades: Fire Protection: Fire Alarm, Smoke Detection & Fire Suppression Contractor, Fire Extinguishers, Pumps, Hydrants & Inspections
The City is seeking a development partner for a public-private partnership with a specialty in hotel development. The City is looking to partner with a development firm to maximize the potential of this important gateway property. The development will serve the public and guests of the Gastonia Conference Center. The proposed scope of work involves working in collaboration with City Staff to develop: A signature hotel that will support the needs of Downtown and FUSE while also supporting the events of the Gastonia Conference Center. A project focused on Market and City needs. Maximization of the property to increase tax base. A proposal that shows how the property will optimize the site and connection to the Gastonia Conference Center.
Post Date: 05/01/2026Bid Date:06/10/2026Trades: Developer, Land Consulting, Property, Real Estate, Master Plans, Comprehensive Plans, Urban/Suburban Planning, *General Building Contractor GBC: Building Construction, Enclosed Structures; Opportunities for Subcontractors, Design/Build Contractor; Design/Bid/Build Entity (DBBE) or Design/Bid/Build (DBB)
The City is seeking a development partner for a public-private partnership with a specialty in destination restaurant experience. The City is looking to partner with a development firm to maximize the potential of this important property. The proposed scope of work involves working in collaboration with City Staff to develop: A signature restaurant to serve as an additional destination to support the FUSE District. A project focused on Market and City needs. Maximization of the property to increase tax base. A proposal that offers a unique experience taking full advantage of the view of the baseball stadium.
Post Date: 05/01/2026Bid Date:06/10/2026Trades: Developer, Land Consulting, Property, Real Estate, Master Plans, Comprehensive Plans, Urban/Suburban Planning, *General Building Contractor GBC: Building Construction, Enclosed Structures; Opportunities for Subcontractors, Design/Build Contractor; Design/Bid/Build Entity (DBBE) or Design/Bid/Build (DBB)
It is the intent of this proposal invitation to obtain contract proposed installation of water service backflow protection device with associated valves, fittings, and other related appurtenances to serve East Henderson High School.
Post Date: 05/04/2026Bid Date:06/10/2026Trades: Plumbing Contractor: Water Supply, Reverse Osmosis (RO), Water Heaters, Water Meters, Leak Detection, Flow & Backflow, Acoustic
Total Small Business Set-Aside, 238220 - Plumbing, Heating, and Air-Conditioning Contractors. The AMS Science & Technology Program operates a greenhouse facility requiring the installation of a stacked washer and dryer to support laboratory and operational needs. The program already owns a Samsung frontload washer and dryer set, which is compatible with stackable installation. A stacking kit needs to be supplied and installed as part of the project. The installation area is located along an exterior wall in the greenhouse entryway. Existing plumbing must be reconfigured, and new electrical, ventilation, and structural modifications are required.
Post Date: 05/11/2026Bid Date:06/10/2026Trades: *General Building Contractor GBC: Building Construction, Enclosed Structures; Opportunities for Subcontractors
This project installs a rectangular rapid flashing beacon (RRFB) to improve safety and ADA accessibility at the Arrowood Rd and High Meadows Ln intersection.
Post Date: 05/14/2026Bid Date:06/10/2026Trades: *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, Construction Zone Traffic Control Contractor, Flashing Beacons
The project generally consists of demolition of (1) existing pit toilet and (2) existing shower houses at the campground in hanging rock state park and replacement with two (2) new 1,260 sf shower houses with four (4) new parking spaces at each shower house. The project scope also includes one (1) new ADA campsite near each shower house and improvements to the existing (71) campsites. Alternates include wood T&G walls in lieu of painted gypsum in restrooms above wall tile, ceramic tile floors in lieu of sealed concrete in restrooms, landscape timbers replacement at (71) non-ADA campsites, and installation of OFCI campsite furnishings and equipment at (71) Non-ADA campsites.
Post Date: 05/15/2026Bid Date:06/10/2026Trades: *General Building Contractor GBC: Building Construction, Enclosed Structures; Opportunities for Subcontractors, *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
The Chapel Hill Police Department is a heavily used, 40,000-square-foot 24-hour facility that serves town employees and community members. The building contains a prisoner processing area with a single-occupancy restroom (we do not keep prisoners on site), shared conference rooms, a large break room with a sink, microwave, and stove, two (2) briefing areas on either end of the building, two (2) large classroom spaces that may be used daily or may not be used for many days in a row, two (2) multi-stall restrooms, numerous single-occupancy restrooms, and a variety of work rooms and offices. Town of Chapel Hill Technology Solutions is a daily Information Technology (IT) operation housed in approximately 6,500 square feet of office space that includes a large conference room, open space housing workstations, staff offices, a break room, and single-occupancy restrooms. This space is co located with the Towns Office of Emergency Management and Risk Management. The Town of Chapel Hill Office of Emergency Preparedness and Risk Management house the Towns emergency preparedness and response operations. This space consists of two (2) offices and a large Emergency Operations Center. During emergencies, this space may be occupied 24 hours per day. The Contractor will be required to properly manage the waste collection process (trash and mixed recycling). The Contractors full array of cleaning products must be certified by Green Seal or the Environmental Protection Agencys (EPA) Safer Choice program (unless other products are specifically allowed by the Contract Coordinator). The Town is seeking a Janitorial Service Vendor to provide cleaning services five (5) days per week between the hours of 6:15 P.M. and 2:00 A.M., excluding holidays. Work shall be coordinated so as not to interfere with evening meetings scheduled in the facility.
Manhole WC21 located at Grizzly Court, Havelock, NC 28532 shall be replaced in addition to approximately 40 feet of 8-inch PVC SDR35 Gravity Sewer Pipe; each approximately 12 feet deep. Contractor shall remove and dispose of the current manhole and structure and replace the manhole with a precast concrete manhole constructed with a 6-inch ballast ring. The PVC pipe is to be replaced at the influent side of WC21 for approximately 20 feet and the effluent side of WC21 for approximately 20 feet starting at manhole WC21 for both directions. Contractor shall use PVC SDR35 for the influent and effluent piping.
Post Date: 05/20/2026Bid Date:06/10/2026Trades: *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, Stormwater Drainage: Manholes & Valve Boxes, Ditches, Culverts, Shoulder Work, Grates, French Drains, Dewatering, Water Swales, Public Utilities - Water & Sewer Lines: - Pipeline Contractor: Water Mains, Sewer Lines, Septic Lines; CIPP Pipe liners, Pipe Inspection, Video & Robotic Cameras
Design, furnish, install, configure, and maintain a comprehensive and non-proprietary video surveillance system to enhance safety and security at designated administrative offices and/or residential properties. The system shall provide high-quality video monitoring, recording, storage, and remote access capabilities in compliance with applicable HUD Procurement and Federal Requirements.
Post Date: 05/26/2026Bid Date:06/10/2026Trades: Security System: FOB, Access Control, CCTV, Video Surveillance, Active Threat, Intrusion Alarms (Except Locksmiths) NAICS 561621
Engineering services shall include, but are not limited to, standard tasks necessary for the implementation of the project in conformance with NCDEQ compliance areas: 1. Preparing and approval of the engineering report prior to the Release of Funds; Upon the Release of Funds, the following scope of work is required: 1. Preparing the final design and construction bid package in conformance with applicable regulations and requirements. 2. Ensuring compliance with Davis-Bacon wage and American Iron and Steel requirements. 3. Supervising the bid advertising, tabulation, and award process, including preparing the advertisements for bid solicitations, conducting pre-bid meeting, conducting bid opening, and issuing the notice to proceed. 4. Conducting the pre-construction conference. 5. Surveying, field staking, on-site supervising of construction work, and preparing inspection reports. 6. Reviewing and approving all contractor requests for payment, change orders, and submitting approved requests to the governing body. 7. Providing reproducible plan drawings to the Town upon project completion. 8. Conducting final inspection and testing. 9. Submitting certified "as-built" drawings to appropriate authorities and 10. Preparing an operation and maintenance manual (if applicable).
Post Date: 05/27/2026Bid Date:06/10/2026Trades: *A&E Architecture & Engineering: Design Services, Consulting & Planning: Professional, EOR Services, Feasibility Study
The purpose of this process is to procure the services for the inspection, maintenance, and repair of (WE)s pad mount transformers and related equipment. The successful bidder will be responsible for ensuring that WEs transformers meet all safety, operational, and regulatory standards, while also providing timely and accurate reporting of equipment conditions. Work includes but is not limited to: 1. Physical inspection of transformers and other related equipment by request. 2. Assess the condition of the transformers and other related equipment. 3. Assess the failure risk of the transformers and other related equipment. 4. Submittal of a report detailing findings, assessments, further actions, and recommendations. 5. Present findings and remediation services to Wilson Energy at a date to be determined as requested. 6. Maintenance related services offered related to the equipment based on findings.
Post Date: 05/28/2026Bid Date:06/10/2026Trades: High Voltage Electrical Contractor (HVE): Electrician, Power Lines; Substation, Switchgear, Transmission/Power Lines, Inspection Services, Inspector of Record (IOR) Services & Testing Laboratories - NAICS 541380