Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

Browse all Washington

#820226

Littlerock Elementary School (ES) Music Room Ramp Renovation, Olympia, WA

General, Architectural, Structural, Mechanical, Electrical, Fire Protection and other work, located at 12710 Littlerock Road SW, Olympia, WA 98512 as indicated on Drawings.

Post Date: 04/21/2026 Bid Date: 05/12/2026 Trades: *General Building Contractor GBC: Building Construction, Enclosed Structures; Opportunities for Subcontractors
#820227

Water Pollution Control Facility (WPCF) TFI Bar Screen Pipe Repair Project, Everett, WA

The City of Everett owns the Water Pollution Control Facility (WPCF) at 4027 4th Street SE, Everett, WA 98201 and is seeking a Contractor to perform the following work, which includes but is not limited to: 1. Temporary erosion and sediment control measures. 2. Trenching, excavation, shoring, dewatering, bedding, backfill, and compaction for repair of an existing 48-inch TFI pipe section and 48-inch SE pipe section. A portion of the area has been previously excavated by the Owner to diagnose the needed repairs. 3. Additional pavement demolition as necessary to facilitate the work. The Owner has already removed existing pavements to the extents shown and noted in the Drawings. 4. Demolishing an existing 48-inch TFI pipe section and two (2) existing couplings on either side of an existing elbow. 5. Demolishing two (2) existing 48-inch SE pipe couplings on either side of an existing 90-degree elbow. 6. Furnishing and installing a new 48-inch TFI pipe section, flexible rubber connector, two (2) couplings, and associated restraints. 7. Furnishing and installing two (2) new 48-inch SE couplings and associated restraints. Note that the duration of the 48-inch SE pipe repair shall not exceed a 24-hour period between removal of the pipe couplings and elbow and installation of the new couplings and replacement of the elbow. 8. Removing and reinstalling an existing 48-inch TFI elbow and 48-inch SE elbow to facilitate installation of the new pipe section and couplings. 9. Removing mortar coating from the existing 48-inch TFI and 48-inch SE piping and elbows to facilitate installation of the new couplings and restraints. 10. Fabricating and welding U-shaped plates to the existing 48-inch TFI and 48-inch SE piping and elbows for restraint of the couplings. 11. Enlarging the pipe penetration at the existing Recirculation/Bypass Flow Control Structure to facilitate installation of the new flexible rubber connector. 12. Removing portions of the existing screen channel sidewalls and floor grout in the Recirculation/Bypass Flow Control Structure to extend the new 48-inch TFI pipe section past the interior face of the structure wall. 13. Remove and reset the existing electrical vault near the east side of the Recirculation/Bypass Flow Control Structure. 14. Filling under the existing stairs along the east side of the Recirculation/Bypass Flow Control Structure. 15. Constructing a new dumpster pad, furnishing and installing a new area drain for the pad, and connecting piping between the area drain and Recirculation/Bypass Flow Control Structure. 16. Prepare subgrade and place asphalt pavement where the asphalt has already been removed by the Owner and any other areas where asphalt is removed by the Contractor to facilitate the Work.
Post Date: 04/21/2026 Bid Date: 05/12/2026 Trades: Pipeline Contractor: Water Mains, Sewer Lines, Septic Lines; CIPP Pipe liners, Pipe Inspection, Video & Robotic Cameras
#820228

SWSSD Lift Station #4 Upgrades, Burien, WA

Wastewater lift station Upgrades: Abandon an existing below-ground lift station structure, meter vault, and associated piping, and replace with new submersible wastewater pumps, pre-cast meter vault, concrete wet well, ductile iron force main, FRP electrical equipment building, and permanent standby generator and gravity sewer piping. Work to include bypass pumping, dewatering, and site grading which will include the installation of a retaining wall as shown on the plans and described herein.. Force main replacement: Install approximately 22 LF of 8-in. class 52 DI force main open trench with connection to existing force main. Work to include traffic control as required.

Post Date: 04/21/2026 Bid Date: 05/12/2026 Trades: Wastewater Treatment Plant/Facility Construction: Septage, WWTP/WRF/OSSF OnSite Sewage Treatment Station, Lift Station
#820232

33 Road Aquatic Organism Passage Part 2, Skamania Co, WA

The project consists of, but is not limited to, grading shaping and compacting 4.8 miles of roadway, and providing all materials, labor, and equipment to remove two existing 24- inch culvert, and install a pipe arch 129 span by 8 11 rise (Nominal: 157 x 101) x 60-foot-long Gauge 10 Aluminized Corrugated Metal Culvert (5 x 1 in. Corrugation), and to remove an existing 48-inch culvert, and install a bottomless metal arch 14 span by 4 8 rise x 60-foot-long Gauge 10 Galvanized Steel Corrugated Metal (5 x 2 in. Corrugation).

Post Date: 04/21/2026 Bid Date: 05/12/2026 Trades: *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
#820618

Building 18 - Automotive Computer Lab Renovation - Spokane Colleges, Spokane, WA

The Project scope consists of the following: Convert an existing ~1900 SF classroom (Room 138) into two classrooms with a new framed wall: a computer lab (Room 138) and a new general classroom (Room 140). The renovated classroom will include new door to classroom 140, CMU wall infill where overhead door has been removed, newly sealed concrete floors, repainted walls, new ACT ceilings, and modified mechanical & electrical based on the revised layout. Update finishes for classrooms 107, 109, 111, 117, 142, 144 (~4700 SF). Scope includes new sealed concrete floors, repainted walls, new ACT ceiling with updated LED lights and new supply/return diffusers. Update WiFi connection for the entire building. Mandatory 15% apprentice labor hours of the total labor hours are a requirement of the construction contract. Voluntary numerical Diverse Business goals of 10% MBE, 6% WBE, 5% SBE or PWSBE, and 5% Veterans have been established for this project. Achievement of the goals is encouraged.
Post Date: 04/23/2026 Bid Date: 05/12/2026 Trades: *General Building Contractor GBC: Building Construction, Enclosed Structures; Opportunities for Subcontractors
#820812

Westport Skatepark, Westport. WA

The work consists of furnishing all material, labor, tools, equipment, and incidentals necessary for construction of the Westport Skatepark project. The work consists of, but is not limited to, the following: (1) site clearing, earth moving, erosion and sediment control; (2) skatepark construction, including concrete flatwork, concrete reinforcement, cast in-place concrete, shotcrete, metal fabrications, painting, drainage, and associated appurtenances; and (3) surface restoration of all disturbed surfaces.

Post Date: 04/24/2026 Bid Date: 05/12/2026 Trades: *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
#820966

RFQ Construction Management and Inspection Services, Skagit Co, WA

The Project involves the phased renovation and adaptive reuse of a former approximately 70,000-square-foot warehouse into a state-of-the-art Maintenance, Operations and Administrative Campus for Skagit Transit. The selected Consultant shall act as the Owners representative, ensuring the Project is delivered in strict accordance with Contract Documents, FTA requirements, and all applicable federal, state, and local regulations.

Post Date: 04/27/2026 Bid Date: 05/12/2026 Trades: *General Building Contractor GBC: Building Construction, Enclosed Structures; Opportunities for Subcontractors
#820974

WWTP Anaerobic Digester Knife Gate Valve Replacement, Richland, WA

This project includes the removal of the existing knife gate valves, furnishing, installation and place in satisfactory operating condition new knife gate valve, assemblies and appurtenances within the City's wastewater treatment plant anaerobic digester building and other incidental work.

Post Date: 04/27/2026 Bid Date: 05/12/2026 Trades: Wastewater Treatment Plant/Facility Construction: Septage, WWTP/WRF/OSSF OnSite Sewage Treatment Station, Lift Station
#821225

Lexington Force Main Replacement - Phase 1, Kelso, WA

Scope of Work: Provide all labor, materials, equipment, and incidentals required to construct approximately 2,500 linear feet of 18-inch HDPE sewer pipe using open-cut installation methods. The new piping will replace an existing 14-inch AC pipeline that conveys flow from a pump station that must remain in service. Bypass pumping will be necessary throughout the the duration of the work. Additionally, the work includes construction of a rock buttress for slope protection, demolition of an existing carport, installation of two (2) air/vacuum valve assemblies, and connections to existing sewer piping with all necessary fittings and appurtenances. The scope also includes clearing and grubbing of the project corridor, restoration of disturbed areas, miscellaneous landscaping, and full pavement restorations, specifications, and applicable standards.
Post Date: 04/28/2026 Bid Date: 05/12/2026 Trades: Pipeline Contractor: Water Mains, Sewer Lines, Septic Lines; CIPP Pipe liners, Pipe Inspection, Video & Robotic Cameras, Sewer Pump System, Sewer Connection, Septic System Contractor: OnSite Sewage Facility (OSSF), *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
#821396

Johnson Property Remediation, Stanwood, WA

The work to be performed under these specifications consists of furnishing all labor, tools, materials, and equipment necessary for mobilization to the site; site preparation; excavation and disposal or recycling of soils contaminated with petroleum; excavation, removal, and disposal of a 300 gallon abandoned underground storage tank (UST); excavation, removal, and disposal of septic tank and attached lines within the excavation zone of the UST; excavation of overburden soils from areas of contaminated groundwater and stockpile for later use; as needed dewatering and treatment of water from excavation locations to improve excavation stability; mixing of bioremediation reagents into the 2-feet of soil at the bottom of the remediation locations; and backfilling the excavations with stockpiled overburden soils, salvaged soils, or approved import material and associated project restoration.

Post Date: 04/28/2026 Bid Date: 05/12/2026 Trades: Pipeline Contractor: Water Mains, Sewer Lines, Septic Lines; CIPP Pipe liners, Pipe Inspection, Video & Robotic Cameras
#821404

2026 Hall of Justice Parking Lot Rehab, Newport, WA

Pend Oreille County is soliciting Bids for the 2026 Hall of Justice Parking Lot Rehab to (A) Rebuild and pave an existing parking lot, (B) Remove existing concrete sidewalks and rebuild with asphalt pathways, and (C: Alternate Lot) Construct a new parking lot at the Pend Oreille County Hall of Justice located at 229 S. Garden Ave, Newport, WA 99156.

Post Date: 04/28/2026 Bid Date: 05/12/2026 Trades: Earthwork & Paving Contractor: Pavement Preservation, Resurface, Slurry Seal, High Friction, Milling, Land Clearing, Trails/Path
#821701

Spokane VA Asbestos Inspection/Abatement Services, Spokane, WA

562910 - Remediation Services. Spokane VAMC requires Asbestos Management Services, to include semi annual surveillance and triennial reinspections of asbestos containing materials, independent oversight of asbestos abatement projects, and pre-construction asbestos surveys for renovation and small scale projects. PoP 9/1/2026- 8/31/2027 plus 4 year option.

Post Date: 04/29/2026 Bid Date: 05/12/2026 Trades: Asbestos (ASB), Lead, Arsenic Detection: HAZ Certification, Remediation, Toxic/Contaminants; Remedial Action Plan (RAP)
#819101

D Bldg. HVAC and Roof Replacement - Bellevue College, Bellevue, WA

Scope of work is indicated on the contract drawings and specifications. It includes a re-roof project of approximately 22,000 sf and installing Owner Furnished Contractor Installed (12) twelve new roof top units on D Building of Bellevue College. Work consists of: The demolition of the existing roof assembly and installation of a new roof assembly of modified bitumen membrane. New mechanical curbs for roof top equipment, roof drains, and roof scuppers. Electrical work to support new equipment and to tie into existing fire alarm. Interior replacing of acoustical tile under mechanical equipment as necessary. Contractor to immediately coordinate delivery of new Owner Furnished, Contractor Installed roof top units and equipment per mechanical and electrical documents. Mandatory 15% apprentice labor hours of the total labor hours are a requirement of the construction contract. Voluntary numerical Diverse Business goals of 10% MBE, 6% WBE, 5% SBE or PWSBE, and 5% Veterans have been established for this project. Achievement of the goals is encouraged.
Post Date: 04/14/2026 Bid Date: 05/13/2026 Trades: Roofing Contractor, Facia Board & Soffit Replacement, Gutters, Downspouts, Snow Guards
#819110

I-5, 1.2 Mi. S of Rogers Rd to SR 505 Vic. Paving, Lewis & Cowlitz Cos, WA

Requires grinding and inlaying travel lanes, pavement repair, guardrail repair, concrete barrier replacement, rebuilding a climbing lane, installing an underdrain system, traffic control and other work. Involves 63 items and 77 working days. Work class 4, asphalt concrete paving. 19% SBE goal

Post Date: 04/14/2026 Bid Date: 05/13/2026 Trades: Earthwork & Paving Contractor: Pavement Preservation, Resurface, Slurry Seal, High Friction, Milling, Land Clearing, Trails/Path
#819409

2026 Overlay Project, North Bend, WA

There are three (3) sites associated with this project. The work to be performed shall be along 436th Ave SE from SE 136th St to SE North Bend Way (Schedule A), SE 140th St from Eagles Nest Pl SE to the west end of the Ichijo development approximately 500 feet east of 463rd Ave SE (Schedule B), and 468th Ave SE from SE 144th St to the City limit between SE 146th St and SE North Bend Way (Schedule C). The Work will consist of, but is not limited to, pavement removal via planing, pavement overlay and inlay, areas of full-depth pavement repair, road widening, miscellaneous surface restoration, pavement markings, traffic control, and other Work as required to complete the Project.

Post Date: 04/15/2026 Bid Date: 05/13/2026 Trades: Earthwork & Paving Contractor: Pavement Preservation, Resurface, Slurry Seal, High Friction, Milling, Land Clearing, Trails/Path
#819627

Kulshan Reroof - Whatcom Community College, Bellingham, WA

Scope includes re-covering an existing buildings single ply membrane with new. Other work entails metal siding panel removal and replacement necessary for roof to wall transition flashing. Voluntary numerical Diverse Business goals of 10% MBE, 6% WBE, 5% SBE or PWSBE, and 5% Veterans have been established for this project. Achievement of the goals is encouraged.
Post Date: 04/17/2026 Bid Date: 05/13/2026 Trades: Roofing Contractor, Facia Board & Soffit Replacement, Gutters, Downspouts, Snow Guards
#819631

Childcare Center Playground Drainage and Safety Upgrades, Olympia, WA

The College proposes to improve the drainage at the Childrens Center. Related work includes excavation and removal of asphalt, concrete, a strip drain, a drain line, and a catch basin. Work also includes installing synthetic turf, a concrete retaining wall, and drainage elements.

Post Date: 04/17/2026 Bid Date: 05/13/2026 Trades: *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors