This project provides for the improvement of 3.43 miles of roadway in the Cities of Normandy Park, Maple Valley, Lake Forest Park, and unincorporated King County by removal of pavement markings, raised and recessed pavement markers, planning bituminous surfaces, pavement repair excavation, placing crushed surfacing, paving with hot mix asphalt, erosion control, and other work. 15% minimum Apprentice Utilization Requirement.
Post Date: 05/06/2026Bid Date:05/19/2026Trades: Earthwork & Paving Contractor: Pavement Preservation, Resurface, Slurry Seal, High Friction, Milling, Land Clearing, Trails/Path
Whatcom County Flood Control Zone District (FCZD) requests bids for Subzone levee vegetation maintenance in 2026. This contract provides for the mowing and brushing of the Lynden (LE), Sumas Nooksack Everson (SNE), and Acme Van Zandt (AVZ) Subzones. maintained levee segments, as further described in the bid documents.
Post Date: 05/06/2026Bid Date:05/19/2026Trades: *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside, Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside. There are a total of 15 elevators to be inspected & certified.
Post Date: 05/06/2026Bid Date:05/19/2026Trades: Inspection Services, Inspector of Record (IOR) Services & Testing Laboratories - NAICS 541380
In general, the scope includes: Complete removal of approximately 850 square feet of spray polyurethane foam (SPF) roofing assembly down to the deck within the trough roof area and EIFS assembly on the adjacent parapet along with associated flashings, and replacement with a new fully adhered PVC single ply roof assembly with new flashings and code compliant insulation with taper to drain. Project includes recovering the approximate 10,250 main metal roof, with partial removal of the SPF, and installation of a new layer of polyisocyanurate insulation, HD coverboard and induction welded PVC membrane assembly. Voluntary numerical Diverse Business goals of 10% MBE, 6% WBE, 5% SBE or PWSBE, and 5% Veterans have been established for this project. Achievement of the goals is encouraged.
In general, the scope includes: Refinishing existing playground equipment, including staining, clear sealers, high-performance finishing. Installation of new playground equipment. Earthwork associated with site improvements. Installing new concrete paving, playground surfaces, and landscaping work. Installing subgrade drainage related to these site improvements. Voluntary numerical Diverse Business goals of 10% MBE, 6% WBE, 5% SBE or PWSBE, and 5% Veterans have been established for this project. Achievement of the goals is encouraged.
Post Date: 04/21/2026Bid Date:05/20/2026Trades: *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
Requires planing bituminous pavement, pavement repair, paving with hot mix asphalt (HMA), pavement marking, striping, bridge deck repair, signing, traffic loops, closed circuit television (CCTV) installation, temporary traffic control and other work. Involves 47 items and 64 working days. Work class 4, asphalt concrete paving. A federally funded contract with a 22% federal small business enterprise goal.
Post Date: 04/21/2026Bid Date:05/20/2026Trades: Earthwork & Paving Contractor: Pavement Preservation, Resurface, Slurry Seal, High Friction, Milling, Land Clearing, Trails/Path
Substantial alteration of an existing two-story building with a basement.
Post Date: 04/22/2026Bid Date:05/20/2026Trades: *General Building Contractor GBC: Building Construction, Enclosed Structures; Opportunities for Subcontractors
Work to be performed includes the construction of a five-leg roundabout at the intersection of NW 8th Street and W North Bend Way. Additional construction activities will consist of, but are not limited to, installation of stormwater collection, treatment and infiltration facilities; roadway illumination; landscaping; wetland/stream buffer mitigation; pavement markings and erosion control measures.
Post Date: 04/22/2026Bid Date:05/20/2026Trades: *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
Install Three Phase (240v) 40kw Kohler commercial grade liquid cooled generator, with block heater, a minimum 500-gallon liquid propane tank, and a 200amp automatic transfer switch inside well house at Holiday Beach well site. Install Single Phase (240v) 20kw Kohler commercial grade liquid cooled generator, with block heater, a minimum 500-gallon liquid propane tank, and a 200amp automatic transfer switch inside the well house at Island Hide-A-Way well site.
Post Date: 04/27/2026Bid Date:05/20/2026Trades: Generator Contractor: Electrical & Power Provider, Backup Battery Systems & Uninterrupted Power Supply (UPS) Systems
The Contractor shall: Inspect all reservoirs for sediment and defects. JACK JANDA, Commissioner RON GOLD, Commissioner Clean as necessary to remove all sediment, debris, and bacteria harboring media, for reservoirs Alderbrook 1, 2, 3, and Madrona Beach. Clean as necessary to remove all sediment, debris, and bacteria harboring media, for Highland Estate tanks. These tanks will be drained prior to inspection and cleaning being completed. Record all procedures using cameras capable of focusing on the entire interior surface with high resolution video to include narration. Video record shall play back in Microsoft Media Player. Provide live video feed and live voice communication for monitoring of entire procedure. Defects shall be noted on inspection report, with owner option for repair. Final report of inspection findings and recommendations to be provided in Adobe PDF format and sent on USB drive, compact disc, or by electronic mail (email). Inspections and cleanings shall be completed by December 1, 2026. Final reports shall be submitted to Mason PUD 1 by December 30, 2026. Guarantee all bids are valid for a minimum of thirty (30) days from date of submission.
Post Date: 04/27/2026Bid Date:05/20/2026Trades: Tank & Silo Construction & Controls, Maintenance, Inspections, Repair & Cleaning, Pressure Washing
Requires chip sealing, crack sealing, pavement repair, installing centerline rumble strips, shoulder finishing, fog sealing, delineation, traffic control and other work. Involves 30 items and 20 working days. Work class 3, bituminous surface treatment. 14% federal small business enterprise goal.
Post Date: 04/28/2026Bid Date:05/20/2026Trades: Earthwork & Paving Contractor: Pavement Preservation, Resurface, Slurry Seal, High Friction, Milling, Land Clearing, Trails/Path
The work involved under the terms of this contract document shall be full and complete installation of the facilities, as shown on the plans and as described in the construction specifications, to include but not be limited to: - Construction surveying, staking, and production of as-built drawings. - Replace PRV 1 with the proposed PRV, located outside the traveled roadway and shoulder. The new PRV will be located in the unimproved ROW, south of the existing PRV 1, at the west shoulder of Taylor Place SW adjacent to 564 Stevens Ave NW. - Connect the station inlet to the 12 DI on Taylor PL NW and the outlet to the 10 CI on Taylor PL NW. - Abandon the existing PRV and 10 Cl between the point of connection of the replacement PRV and connection to the 12 DI at S 124th St. - Install new PRV, piping, and appurtenances. - Install 3-inch pressure relief valve and piping, with an above ground discharge pipe that discharges water to the existing surface water ditch along the south side of Taylor Pl NW. o Installation of a concrete pad for energy dissipation from discharge pipe. o Extension and grading of the existing surface water ditch as indicated and/or directed. - Trench excavation, including removal of existing unsuitable material, removal and abandonment of existing utilities, disposal of excavated material, shoring, and dewatering. - Removal and replacement of asphalt concrete pavement, asphalt overlay, concrete curbs, gutters, sidewalks and driveways. - ROW Surface and other restoration. - Furnish and install approximately 80 LF ductile iron Class 52 8-inch diameter restrained joint water pipe and restrained joint fittings with polywrap. - Furnish and install approximately 110 LF ductile iron Class 52 10-inch diameter restrained joint water pipe and restrained joint fittings with polywrap. - Furnish and install a 12-inch x 10-inch tapping tee and valve assembly. - Installing and maintaining adequate TESC measures and restoring all disturbed areas. - Temporary traffic control measures following the contract documents and applicable City of Renton, King County, and MUTCD standards. - Testing and disinfecting of water mains. - Protecting existing utilities, utility potholing and resolution of utility conflicts.
Post Date: 04/28/2026Bid Date:05/20/2026Trades: *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
Island-wide asphalt repairs and patching including pulverizing existing road surface, milling, material removal, grading, and paving; as well as grind and overlay operations for the roads.
Post Date: 04/29/2026Bid Date:05/20/2026Trades: Earthwork & Paving Contractor: Pavement Preservation, Resurface, Slurry Seal, High Friction, Milling, Land Clearing, Trails/Path
This project consists of the following elements of work: Demolition of five existing structures : 18,690 SF warehouse, 2,400 SF garage, 2,200 SF shed, crane and crane tower, and a metal framed wheelhouse on an existing boat dock; retirement of existing utilities, removal, handling, and disposal of regulated building materials including: asbestos, lead-containing paint (LCP), Polychlorinated Biphenyls (PCBS), Mercury-Containing Light Tubes, and Chlorofluorocarbons (CFCs); construction stormwater and erosion control; contaminated soil removal, handling, and disposal, and vegetation and tree protection.
Post Date: 04/29/2026Bid Date:05/20/2026Trades: Demolition Contractor, Building Removal and/or Relocation, Wrecking & Hauling
This project will replace the play area, located in Meridian Park. Renovation includes new play equipment, accessible access to all; site furniture, landscape and updated accessible restroom. This project includes two alternates: Alternate. 1 - Sidewalk paving and replacement in lieu of repair. Sidewalk extends from new. Accessible connection to northeast corner of Good Shepherd center will be demolished and installed as new sidewalk, rather than repaired. Alternate. 2 - EWF in combination with PIP Surfacing. A portion of the EWF Play surfacing will be replaced with Poured-in-Place surfacing and cast in place concrete slab underlay.
Post Date: 04/29/2026Bid Date:05/20/2026Trades: *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
This project provides for the improvement of 122nd Avenue East. The project will widen the existing two-lane roadway to accommodate two southbound through lanes, a two-way left turn lane, and one northbound through lane. Other improvements include four-foot paved shoulders, cement concrete curb and gutter, 6-foot wide cement concrete sidewalks, an enclosed storm drainage system, water quality stormwater facilities, illumination, replace the existing traffic signal system at the 122nd Avenue East / 144th Street East intersection, and update the signal at the 122nd Avenue East / 136th Street East intersection, and other work.
Post Date: 04/29/2026Bid Date:05/20/2026Trades: *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
Construction of approximately 9,000 linear feet of a transmission water main, pressure reducing valve and vault, combination air valve vaults, isolation valves, surface restoration and related work.
Post Date: 04/29/2026Bid Date:05/20/2026Trades: Pipeline Contractor: Water Mains, Sewer Lines, Septic Lines; CIPP Pipe liners, Pipe Inspection, Video & Robotic Cameras
Educational Service District 112, ESD112, Vancouver, Washington, is soliciting competitive bids from responsible contractors for Epoxy Floor work as part of our 2400 Expansion on our main Campus, located at 2500 NE 65th Ave. Vancouver, WA 98661.
Post Date: 05/04/2026Bid Date:05/20/2026Trades: Floor Covering and Flooring Contractor, Including Carpet, Wood, Marble, Tile, Ceramic, Linoleum, Vinyl